news
Brittain Dining Hall Reopening Following Two-Year Renovation
Primary tabs
After an extensive two-year renovation, Brittain Dining Hall is reopening Monday, Aug. 17.
The facility's exterior and main dining area retain the same Collegiate Gothic architecture that has been a campus staple since its original construction in 1928, but the kitchen, service areas, and systems have all been modernized.
“We are proud to bring historic Brittain Dining Hall back to its renowned place at the heart of the Georgia Tech experience. While preserving what generations of Yellow Jackets have loved about Brittain, we have significantly upgraded the facility to serve today’s students, employees, alumni, and stakeholders with greater variety, more options for guests with allergen needs, and innovative culinary selections,” said Ryan Greene, executive director for Dining and Retail Services.
In designing the new space, Tech Dining wanted to preserve the structure's historic character — which has drawn comparisons to Hogwarts and landed it on Southern Living magazine’s list of the South’s most stunning dining halls — while providing diners with a revamped experience, featuring seven full-service stations outfitted with new state-of-the-art kitchen equipment as well as beverage and dessert options.
Those include:
- Smoothie Lab — A smoothie and acai bowl station.
- Green Bytes and Slices — An expanded salad bar (relocated from the dining room to the servery), a made-to-order deli, and soup.
- Smart Slice — A pizza station.
- GT Fire Bowl — A new Mongolian concept.
- Ramblin’ Grill – A full grill station.
- Plant-Power Hive — A vegetarian and vegan station.
- A full beverage station – A station featuring soda, water, coffee and other drinks.
- Soft-serve ice cream and a Dole Whip machine.
Walking through the servery — the service area between the kitchen and the main dining room — diners will notice expanded walkways, increased natural light, and the restored original terrazzo flooring. That flooring was crafted by the Institute’s ceramics department, founded in 1924 by the building’s namesake, Georgia Tech President Marion L. Brittain.
In the dining room, restoration work preserves the cathedral ceiling and stained-glass windows originally designed by Julian Hoke Harris, Arch 1928, a longtime architecture professor at Tech. The building’s HVAC systems have been updated, and the wrought-iron lights originally made by the mechanical engineering department have been retrofitted with LED lights.
Behind the scenes, Brittain’s main kitchen has received a complete overhaul. New kitchen appliances, water heaters, and an entirely new dish room will reduce water and energy usage while making the operation safer and more streamlined for employees. A new walk-in freezer has been added to the kitchen, while the previous outdoor unit has been relocated to the West Village Dining Hall.
Lighter Fare
When exploring the new offerings at Brittain, diners will not find a fryer at any of the stations. Instead, items like French fries will be baked at the dining hall, offering a more health-conscious approach. The expanded space will allow for the introduction of new dishes, cuisines, and menu rotations to keep up with demand.
“The renewed Brittain represents the continued evolution of Tech Dining. By combining healthier cooking methods, fresh and flavorful ingredients, innovative menu development, and strong culinary execution, we are creating a dining experience that meets the expectations of today’s students and reflects the excellence of Georgia Tech,” Greene said.
Hours of Operation
Brittain Dining Hall will be open Monday – Friday, 11 a.m. – 11 p.m.
Brittain will not open for breakfast or on weekends, but North Avenue Dining Hall and West Village Dining Hall remain open from 7 a.m. to 11 p.m. daily.
Brittain’s Next Century
Brittain has been a staple on campus for nearly a century. Georgia Tech President Ángel Cabrera cut the ribbon at a ceremony Wednesday, marking the beginning of the dining hall's next chapter.
“At Georgia Tech, we build new things and we develop new technologies, but we are tied to our roots, to our values, to our history. We know where we come from, and this building is a symbol of that. And I know, in another 150 years, we will be able to say the same thing,” he said. "When I’m visiting with our alumni, I tell them when they go back to campus, a lot of things will look new, but a lot of things remain absolutely the same, and that’s what this place represents. Memories are made in this place.”
Groups
Status
- Workflow status: Published
- Created by: sgagliano3
- Created: 08/12/2026
- Modified By: sgagliano3
- Modified: 08/12/2026
Categories
User Data