news

Replacement of Chilled Water Piping between Atlantic Drive and State Street

Primary tabs

As part of the due diligence efforts related to replacing chilled water infrastructure between Atlantic Drive and State Street, contractors will be carrying out geotechnical investigations to inform the feasibility of boring the route the pipe will take rather than a cut and cover conventional technique. 
 
The work will not result in any street or road closures in the pathway between Atlantic and State Streets to the South of the Howey Physics Building, but there will a drilling rig and vehicles that may raise questions and concerns.
 
The work is scheduled to occur May 14th.
 
Please let me know if you have questions or concerns.

 

Status

  • Workflow status: Published
  • Created by: cbrim3
  • Created: 05/07/2026
  • Modified By: cbrim3
  • Modified: 05/07/2026

User Data