news

LOVE Building Passenger Elevator Unavailable 6/19 - 8/2

Primary tabs

A new passenger elevator will be installed in the LOVE Manufacturing Building during the months of June and July. Building staff and visitors must use the stairs during the replacement time period. Signage will be posted accordingly. Facilities Design & Construction apologizes for any inconvenience caused by this equipment upgrade. Thank you for your understanding.

Status

  • Workflow Status:Published
  • Created By:cbrim3
  • Created:05/24/2021
  • Modified By:cbrim3
  • Modified:06/07/2021