news
Caddell Landscaping: Nov. 9 thru Feb. 2016
Primary tabs
The Caddell Building’s highly anticipated landscape and hardscape is being installed throughout November and December. Shortly after students return from winter break, they will have a brick-paved plaza to relax in on the south side of the building. Upgrades also include new shade trees, new handrails and guardrails, sidewalks additional bike-racks and signage.
CONSTRUCTION DETAILS:
Work Hours: 7am-6pm M-F, only Saturday work if making up rain days.
Start Date: November 9
End Date: January 11 (weather permitting)
Anticipated Campus Detours or Interruptions:
- Some of the Caddell building entrances may be impacted for short amounts of times while new hardscape is being put in place. However, building access will be provided, as normal.
- Pedestrian Circulation: In early to mid-December pedestrians may be re-routed to the east side of the corridor while a stormwater pipe is connected to the Klaus Building cistern. This will be a very minor re-route that should not impact general travel times.
Groups
Status
- Workflow Status:Published
- Created By:Jessica Rose
- Created:10/30/2015
- Modified By:Jessica Rose
- Modified:05/25/2022
Categories