event

PhD Defense by Mingshu Li

Primary tabs

 

Ph.D. Thesis Defense Announcement

Enhanced Construction Cost Estimation of Highway Projects using Emerging Statistical and Machine Learning Techniques

 

By

Mingshu Li

Advisor(s)

Dr. Baabak Ashuri (CEE/BC)

Committee Members:

Dr. Baabak Ashuri (CEE/BC), Dr. Patricia L. Mokhtarian: (CEE), Dr. Eric Marks (CEE),  Dr. Polo Chau (CSE), Dr. Minsoo Baek (CM, KSU)

Date & Time: March 29th, 3:30 pm

Location: Virtual https://teams.microsoft.com/l/meetup-join/19%3ameeting_OWNhYzA5MTUtMmJkOS00MDUzLTkwZDMtYjBmYjA2ZmYxM2U3%40thread.v2/0?context=%7b%22Tid%22%3a%22482198bb-ae7b-4b25-8b7a-6d7f32faa083%22%2c%22Oid%22%3a%2211c7e901-bf32-4624-aa0f-d3b286555d3d%22%7d

 

Abstract
Several state departments of transporta􀆟on (state DOTs) have encountered significant
challenges in accurately es􀆟ma􀆟ng costs for their highway projects, o􀅌en resul􀆟ng in
discrepancies between the states’ DOT es􀆟mates (owner’s es􀆟mates) and contractors’
submi􀆩ed bids. These inaccuracies can lead to cost overrun, scope change, schedule delay,
postponement, and cancella􀆟on of transporta􀆟on projects, which are problema􀆟c for both
owner organiza􀆟ons and highway contractors. There is a cri􀆟cal need to enhance the quality of
construc􀆟on cost es􀆟mates to efficiently allocate public funds and increase confidence in
engineer’s es􀆟mates. Addressing this need, the overarching objec􀆟ve of this research is to
advance construc􀆟on cost es􀆟ma􀆟on for highway projects through the applica􀆟on of emerging
sta􀆟s􀆟cal modeling and machine learning techniques, examining cost es􀆟ma􀆟on at varying
levels of granularity for a comprehensive analysis.
The study first adopts a temporal perspec􀆟ve at the monthly level, inves􀆟ga􀆟ng risk factors that
affect the accuracy of the owner’s es􀆟mate. This level of analysis allows for the examina􀆟on of
several variables represen􀆟ng the local highway construc􀆟on market, overall construc􀆟on market, macroeconomic condi􀆟ons, and the energy market to iden􀆟fy leading indicators of the
ra􀆟o of low bid to owner’s es􀆟mate. Appropriate 􀆟me-series models, such as ARIMAX, will be
applied to forecast this ra􀆟o using iden􀆟fied leading indicators. This macro-level analysis offers
founda􀆟onal insights into market trends and economic factors influencing cost es􀆟ma􀆟ons,
se􀆫ng the stage for more detailed inves􀆟ga􀆟ons.
Transi􀆟oning to the project level, the research conducts survival analysis to assess the
rela􀆟onship between several poten􀆟al drivers and the likelihood of inaccurate cost es􀆟ma􀆟on.
By innova􀆟vely applying concepts and methods from survival analysis to construc􀆟on cost
es􀆟ma􀆟on, this part of the study explores the impact of project-specific, bidder-specific, and
external market characteris􀆟cs on es􀆟ma􀆟on accuracy. This project-level analysis provides
cri􀆟cal insights into the dynamics at play within individual projects, complemen􀆟ng the broader
market perspec􀆟ve obtained from the temporal analysis.
Finally, at the most granular pay item level, forecas􀆟ng models for early-phase cost es􀆟ma􀆟on
of lump sum pay items (Traffic Control and Grading Complete) are developed using text-mining
and machine learning techniques. This approach involves retrieving project informa􀆟on
available at the early stages of project development through text analysis and examining various
machine learning algorithms with iden􀆟fied key predic􀆟ve features to select the bestperforming
model. By focusing on specific pay items, this level of analysis directly addresses the
prac􀆟cal needs of designers and cost es􀆟mators, offering precise tools for early cost es􀆟ma􀆟on
and further enriching the comprehensive understanding gained from the previous analyses.
This research contributes to the body of knowledge through: (1) developing appropriate
mul􀆟variate 􀆟me-series models (i.e., ARIMAX models) to predict the ra􀆟o of low bid to owner’s
es􀆟mate; (2) crea􀆟ng a Cox propor􀆟onal hazards model to explain and predict the likelihood of
inaccurate cost es􀆟mates; (3) developing machine learning algorithms to accurately es􀆟mate
prices of lump sum pay item at early stages of project development. It is an􀆟cipated that the
research outcome would help cost es􀆟ma􀆟ng professionals in transporta􀆟on agencies be􀆩er
understand the risk factors and poten􀆟al drivers of the devia􀆟on between owner’s es􀆟mate and
low bids, prepare more accurate cost es􀆟mates and develop appropriate risk management
strategies for enhanced decision-making. Through its mul􀆟-level analysis, the study provides
significant insights into project planning, budget alloca􀆟on, and construc􀆟on cost management,
thereby underscoring the cri􀆟cal role of integra􀆟ng machine learning and sta􀆟s􀆟cal modeling
techniques in enhancing the accuracy and reliability of cost es􀆟ma􀆟ons for highway projects.

 

Status

  • Workflow Status:Published
  • Created By:Tatianna Richardson
  • Created:03/14/2024
  • Modified By:Tatianna Richardson
  • Modified:03/14/2024

Categories

Keywords

Target Audience