news

Northside Drive and 10th Street Pylon Signage Replacement Work Begins

Primary tabs

Beginning Monday 9/11 fencing and erosion control for the Northside Dr. & 10th St. Pylon Signage project will begin along the southeast corner of Northside Drive and 10th Street. This site preparation will be followed by demolition and grading of the area where the sidewalk and lanes will be closed along this location. The Planning, Design and Construction department is working closely with the Georgia Department of Transportation and the Atlanta Department of Transporation to coordinate this work. The project is anticipated to run until 2/22/24.

Status

  • Workflow Status:Published
  • Created By:cbrim3
  • Created:09/06/2023
  • Modified By:cbrim3
  • Modified:09/06/2023