news

Campus Improvements to Impact Pedestrian Paths Between MARC and MRDC July - November 2023

Primary tabs

The replacement of steam and condensate lines for the Manufacturing Research Center (MARC) and the Manufacturing Related Disciplines Complex (MRDC) will impact pedestrian pathways between the two buildings from August through mid-November 2023. The egress from the ground level of MRDC will have a fence in place allowing for safe entry to and exit from the building. The main pedestrian path south of MARC will be the path to and from the construction site. Please use caution when traveling this path. The attached aerial maps outline the impacted areas.

Status

  • Workflow Status:Published
  • Created By:cbrim3
  • Created:08/02/2023
  • Modified By:cbrim3
  • Modified:08/02/2023