<node id="692719">
  <nid>692719</nid>
  <type>news</type>
  <uid>
    <user id="35028"><![CDATA[35028]]></user>
  </uid>
  <created>1789760764</created>
  <changed>1790012725</changed>
  <title><![CDATA[Transforming Campus: Latest Construction Milestones ]]></title>
  <body><![CDATA[<div><p>Georgia Tech continues to invest in the evolution of its campus, creating spaces that foster innovation, sustainability, and accessibility. This update provides an overview of recent project milestones, upcoming activities, and the ways these efforts support the Institute’s long-term vision for growth and excellence.<strong>&nbsp;</strong>&nbsp;</p></div><div><p><em><strong>Recently Completed</strong>&nbsp;</em></p></div><div><p><strong>Bike Rack and Micromobility Parking Improvements</strong>&nbsp;<br>Georgia Tech is expanding its micromobility infrastructure through the addition of 141<strong> </strong>new bike racks and 400 designated micromobility parking spaces. Locations include the north and south sides of the Clough Undergraduate Learning Commons, the north side of the Price Gilbert Memorial Library, and additional scooter parking near Van Leer.&nbsp;</p></div><div><p lang="EN-US"><strong>Campus Recreation Center (CRC) Athletic Therapy Center and Esports Arena&nbsp;&nbsp;</strong>&nbsp;<br>The renovation on Level 2 of the CRC transformed an existing conference room and retail dining area into a dedicated physical therapy space. Adjacent is a new esports suite that supports competitive gaming for student clubs, casual play for the campus community, and event space.&nbsp;&nbsp;</p></div><div><p><strong>Geosynthetic Institute Lab</strong>&nbsp;<br>Located on Means Street, a new 6,500-square-foot laboratory supports research, testing, and demonstration activities, providing areas for researchers to evaluate geosynthetic materials and showcase their work, and offices for staff and faculty.&nbsp;</p></div><div><p><strong>Bud and Val Peterson Residence Hall&nbsp;&nbsp;&nbsp;</strong>&nbsp;<br>Located on West Campus, this state-of-the-art residence hall spans 191,000 square feet and offers 860 beds in double-occupancy rooms. On-premise storage accommodates 188 bikes. The building includes a gym, collaborative learning areas, community lounges, and a shared kitchen and laundry. The Tech Market on the building’s first floor is Georgia Tech’s first 24-hour cashierless, self-service market. <a href="https://housing.gatech.edu/locations/bud-val-peterson" rel="noreferrer noopener" target="_blank">Read more about the Bud and Val Peterson Residence Hall</a>.&nbsp;</p></div><div><p><strong>School for Arts, Entertainment, and Creative Technologies</strong>&nbsp;<br>A substantial renovation of the Rich Building now houses the new School in the College of Design, including administrative offices and instructional, studio, and gallery spaces. Learn more about the <a href="https://creativetech.gatech.edu/" rel="noreferrer noopener" target="_blank">School of Arts, Entertainment, and Creative Technologies.</a>&nbsp;</p></div><div><p><strong>George Tower | Scheller Tower&nbsp;</strong>&nbsp;<br>The first three floors of the building feature classrooms, huddle and conference rooms, and both indoor and outdoor collaboration space. The lobby level features a Kaldi’s Coffee, and a light-filled, reservable event space occupies the southwest corner.&nbsp;&nbsp;</p></div><div><p>The George Tower | Scheller Tower exemplifies Georgia Tech’s commitment to sustainable, high-performance design, earning both LEED certification and a prestigious 4-Peach rating from the Georgia State Financing and Investment Commission. These achievements recognize the building’s environmentally responsible design, energy efficiency, and thoughtful use of sustainable materials and systems.&nbsp;&nbsp;</p></div><div><p>George Tower | Scheller Tower supports innovation and collaboration and advances Georgia Tech’s broader goals of creating a more sustainable and resilient campus. A grand opening celebration occurred &nbsp;Sept. 18. &nbsp;<a href="https://news.gatech.edu/news/2026/09/18/georgia-tech-celebrates-completion-george-tower-scheller-tower">Read more about the building</a>.<br>&nbsp;</p></div><div><p><em><strong>In Progress</strong>&nbsp;</em></p></div><div><p><strong>Baptist Collegiate Ministry Building&nbsp;</strong>&nbsp;<br>While not a Georgia Tech-owned project, this new five-story, mixed-use building is set to rise in the footprint of the original building on the west side of Techwood Drive near Fourth Street. The development will provide upgraded ministry facilities along with 55 one- and two-bedroom residences intended for student occupancy, along with gathering spaces. The targeted completion date is Fall 2027.&nbsp;</p></div><div><p><strong>Creative Quarter&nbsp;</strong>&nbsp;<br>Georgia Tech’s Creative Quarter will connect students, research, innovation, and entrepreneurship to arts organizations and creative industries in Atlanta and throughout the state. Open since May, LOOP, powered by Goat Farm, features a performance venue and artist studios, along with flexible interior spaces designed for multidisciplinary experimentation, connecting innovators, artists, students, and visitors. <a href="https://arts.gatech.edu/creative-quarter" rel="noreferrer noopener" target="_blank">Read more about Creative Quarter.</a>&nbsp;</p></div><div><p><strong>Howey Physics Restroom Renovations</strong>&nbsp;<br>The renovation will make the building more ADA-compliant by improving existing plumbing capacity; creating new single-use and multi-use restrooms; and updating finishes, ceilings, and lighting throughout the basement and first five floors.&nbsp;&nbsp;</p></div><div><p><strong>O’Keefe Building Hardscape&nbsp;</strong>&nbsp;<br>Building facade improvements are underway, with hardscape enhancements designed to preserve and upgrade the facility. Renovation work is slated to conclude in mid-2027.&nbsp;</p></div><div><p><strong>Smith and Howell Residence Halls&nbsp;</strong> &nbsp;<br>To preserve their historic character and meet projected housing needs, both residence halls are under full renovation. This includes updating building systems and interior spaces. A new two-story connecting structure will join the two buildings, creating a more open and welcoming central entry point. Also planned are ADA accessibility improvements to all floors and enhanced lighting and amenities.&nbsp;&nbsp;<br>&nbsp;</p></div><div><p><em><strong>On the Horizon</strong>&nbsp;</em></p></div><div><p><strong>430 South Building</strong>&nbsp;<br>The existing three-story building will undergo a complete renovation and roof replacement. New workspaces will be built out on all levels, and new elevators and restrooms will be installed.&nbsp;&nbsp;</p></div><div><p><strong>Bobby Dodd Fan Experience Renovation</strong>&nbsp;<br>Design plans are complete for the first major renovation to the 113-year-old home of Georgia Tech football. The renovation will enhance seating areas through the installation of 12,500 bleacher-mounted, non-flip-up mesh chairback seats. The stadium will undergo a full reseating process ahead of the 2027 season.&nbsp;&nbsp;</p></div><div><p>Additionally, new handrails and wider aisles will be installed in designated sections, along with a new state-of-the-art videoboard and sound system.&nbsp;</p></div><div><p>Premium seating areas will also undergo renovations resulting in remodeled suites, construction of a new Founders Club, and an overhaul of East Club seating and indoor spaces, including the addition of a new VIP Members Club. <a href="https://atfund.org/bobby-dodd-stadium" rel="noreferrer noopener" target="_blank">Read more about the Bobby Dodd Fan Experience Renovation.</a>&nbsp;</p></div><div><p><strong>Daniel Guggenheim School of Aerospace Engineering</strong> &nbsp;<br>The 200,000-square-foot facility will bring together research programs within the Guggenheim School that are currently spread across multiple locations while establishing a prominent new gateway on the south side of campus. Situated at the corner of North Avenue and Tech Parkway, the building will strengthen the Institute’s presence and connectivity within this growing innovation corridor.&nbsp;</p></div><div><p>The new facility will redefine the way aerospace engineering education, research, and industry engagement take place at Georgia Tech by creating a modern, integrated environment where ideas can move seamlessly from design and discovery to testing, validation, and real-world implementation.&nbsp;</p></div><div><p>It will also support more streamlined and efficient administrative operations while significantly increasing space dedicated to collaboration, innovation, and interdisciplinary engagement. <a href="https://www.gatech.edu/news/2026/03/03/state-invest-88m-new-georgia-tech-aerospace-building" rel="noreferrer noopener" target="_blank">Read more about the Aerospace Engineering Building.</a>&nbsp;</p></div><div><p><strong>Global Learning Center – College of Lifetime Learning Renovation</strong>&nbsp;<br>The first and fourth floors of the Global Learning Center, located in Tech Square, will be renovated to meet the programmatic and staffing needs for 100 employees within a collaborative work environment. The project is in the planning and design phase, with expected completion in mid-2027.&nbsp;</p></div><div><p><strong>Skiles Infrastructure Renovation</strong> &nbsp;<br>Currently in the design phase, the renovation will replace and upgrade the building’s mechanical systems to improve reliability and performance. Following the recent completion of a new roof, the renovation marks the beginning of a broader, multiphase effort to modernize and revitalize the facility, built in 1959.&nbsp;</p><p>&nbsp;</p></div><div><p>To stay up to date on campus construction projects, use the Infrastructure and Operations (I&amp;O) &nbsp;<a href="https://facilities.gatech.edu/construction-updates" rel="noreferrer noopener" target="_blank"><strong>Construction Project Viewer.</strong></a> This dynamic tool meshes a map and calendar interface, allowing users to easily track project start and end dates. ADA-accessible routes can also be located by zooming in on individual projects.&nbsp;&nbsp;</p></div><div><p>For behind-the-scenes updates, follow I&amp;O on <a href="https://www.linkedin.com/company/georgia-tech-infrastructure-and-operations/posts/?feedView=all&amp;viewAsMember=true" rel="noreferrer noopener" target="_blank"><strong>LinkedIn</strong></a>, where you’ll find exclusive sneak peeks, progress photos, and insights into the ongoing construction efforts that are shaping the future of Georgia Tech.&nbsp;</p></div>]]></body>
  <field_subtitle>
    <item>
      <value><![CDATA[]]></value>
    </item>
  </field_subtitle>
  <field_dateline>
    <item>
      <value>2026-09-18T00:00:00-04:00</value>
      <timezone><![CDATA[America/New_York]]></timezone>
    </item>
  </field_dateline>
  <field_summary_sentence>
    <item>
      <value><![CDATA[Georgia Tech continues to invest in the evolution of its campus, creating spaces that foster innovation, sustainability, and accessibility.]]></value>
    </item>
  </field_summary_sentence>
  <field_summary>
    <item>
      <value><![CDATA[<p>Georgia Tech continues to invest in the evolution of its campus, creating spaces that foster innovation, sustainability, and accessibility.</p>]]></value>
    </item>
  </field_summary>
  <field_media>
          <item>
        <nid>
          <node id="681204">
            <nid>681204</nid>
            <type>image</type>
            <title><![CDATA[Rendering of interior of Daniel Guggenheim School of Aerospace Engineering]]></title>
            <body><![CDATA[<p><em>Conceptual rendering of the interior of the Daniel Guggenheim School of Aerospace Engineering Building. Subject to modification.</em></p>]]></body>
                          <field_image>
                <item>
                  <fid>265570</fid>
                  <filename><![CDATA[Render-interior-of-D.-Guggenheim-School-of-AE_Sept.-2026.jpg]]></filename>
                  <filepath><![CDATA[/sites/default/files/2026/09/18/Render-interior-of-D.-Guggenheim-School-of-AE_Sept.-2026.jpg]]></filepath>
                  <file_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2026/09/18/Render-interior-of-D.-Guggenheim-School-of-AE_Sept.-2026.jpg]]></file_full_path>
                  <filemime>image/jpeg</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[Conceptual rendering of the interior of the Daniel Guggenheim School of Aerospace Engineering Building. Subject to modification.]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="681203">
            <nid>681203</nid>
            <type>image</type>
            <title><![CDATA[Rendering of exterior of Daniel Guggenheim School of Aerospace Engineering]]></title>
            <body><![CDATA[<p><em>Conceptual rendering of the exterior of the Daniel Guggenheim School of Aerospace Engineering Building. Subject to modification.</em></p>]]></body>
                          <field_image>
                <item>
                  <fid>265569</fid>
                  <filename><![CDATA[Render-D-Guggenheim-School-of-AE_Sept.-2026.jpg]]></filename>
                  <filepath><![CDATA[/sites/default/files/2026/09/18/Render-D-Guggenheim-School-of-AE_Sept.-2026.jpg]]></filepath>
                  <file_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2026/09/18/Render-D-Guggenheim-School-of-AE_Sept.-2026.jpg]]></file_full_path>
                  <filemime>image/jpeg</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[Conceptual rendering of the exterior of the Daniel Guggenheim School of Aerospace Engineering Building. Subject to modification.]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="681201">
            <nid>681201</nid>
            <type>image</type>
            <title><![CDATA[Rendering of East Stands Club Level Bobby Dodd Fan Experience Renovation Sept. 2026]]></title>
            <body><![CDATA[<p><em>Conceptual rendering of the East Stands Club Level included in the renovation project for the Bobby Dodd Fan Experience. Rendering subject to modifications.</em></p>]]></body>
                          <field_image>
                <item>
                  <fid>265567</fid>
                  <filename><![CDATA[East-Stands-Club-Level_-sept2026.jpg]]></filename>
                  <filepath><![CDATA[/sites/default/files/2026/09/18/East-Stands-Club-Level_-sept2026.jpg]]></filepath>
                  <file_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2026/09/18/East-Stands-Club-Level_-sept2026.jpg]]></file_full_path>
                  <filemime>image/jpeg</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[Conceptual rendering of the East Stands Club Level included in the renovation project for the Bobby Dodd Fan Experience. Rendering subject to modifications.]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
          <item>
        <nid>
          <node id="681202">
            <nid>681202</nid>
            <type>image</type>
            <title><![CDATA[Rendering of Smith and Howell Residence Hall Pavilion]]></title>
            <body><![CDATA[<p><em>Conceptual rendering of the building connector pavilion for the Smith and Howell residence halls. Subject to modification.</em>&nbsp;</p>]]></body>
                          <field_image>
                <item>
                  <fid>265568</fid>
                  <filename><![CDATA[Render-Smith-and-Howell-pavilion_Sept.-2026.jpg]]></filename>
                  <filepath><![CDATA[/sites/default/files/2026/09/18/Render-Smith-and-Howell-pavilion_Sept.-2026.jpg]]></filepath>
                  <file_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2026/09/18/Render-Smith-and-Howell-pavilion_Sept.-2026.jpg]]></file_full_path>
                  <filemime>image/jpeg</filemime>
                  <image_740><![CDATA[]]></image_740>
                  <image_alt><![CDATA[Conceptual rendering of the building connector pavilion for the Smith and Howell residence halls. Subject to modification. ]]></image_alt>
                </item>
              </field_image>
            
                      </node>
        </nid>
      </item>
      </field_media>
  <field_contact_email>
    <item>
      <email><![CDATA[Cathy.brim@gatech.edu]]></email>
    </item>
  </field_contact_email>
  <field_location>
    <item>
      <value><![CDATA[]]></value>
    </item>
  </field_location>
  <field_contact>
    <item>
      <value><![CDATA[<p>Catherine Brim</p><p>Communications Officer II</p><p>Institute Communications</p><p><em>Infrastructure and Operations / Planning, Design, and Construction / Office of Sustainability</em></p>]]></value>
    </item>
  </field_contact>
  <field_sidebar>
    <item>
      <value><![CDATA[]]></value>
    </item>
  </field_sidebar>
  <field_boilerplate>
    <item>
      <nid><![CDATA[]]></nid>
    </item>
  </field_boilerplate>
  <!--  TO DO: correct to not conflate categories and news room topics  -->
  <!--  Disquisition: it's funny how I write these TODOs and then never
         revisit them. It's as though the act of writing the thing down frees me
         from the responsibility to actually solve the problem. But what can I
         say? There are more problems than there's time to solve.  -->
  <links_related> </links_related>
  <files> </files>
  <og_groups>
          <item>383831</item>
          <item>1214</item>
      </og_groups>
  <og_groups_both>
          <item>
        <![CDATA[Institute and Campus]]>
      </item>
      </og_groups_both>
  <field_categories>
          <item>
        <tid>129</tid>
        <value><![CDATA[Institute and Campus]]></value>
      </item>
      </field_categories>
  <core_research_areas>
      </core_research_areas>
  <field_news_room_topics>
          <item>
        <tid>71871</tid>
        <value><![CDATA[Campus and Community]]></value>
      </item>
      </field_news_room_topics>
  <links_related>
      </links_related>
  <files>
      </files>
  <og_groups>
          <item>383831</item>
          <item>1214</item>
      </og_groups>
  <og_groups_both>
          <item><![CDATA[Infrastructure and Operations]]></item>
          <item><![CDATA[News Room]]></item>
      </og_groups_both>
  <field_keywords>
          <item>
        <tid>61411</tid>
        <value><![CDATA[Campus Construction]]></value>
      </item>
          <item>
        <tid>194943</tid>
        <value><![CDATA[Bud and Vale Peterson Residence Hall]]></value>
      </item>
          <item>
        <tid>194888</tid>
        <value><![CDATA[George Tower | Scheller Tower]]></value>
      </item>
          <item>
        <tid>13680</tid>
        <value><![CDATA[Bobby Dodd Stadium]]></value>
      </item>
          <item>
        <tid>174985</tid>
        <value><![CDATA[Skiles Classroom Building]]></value>
      </item>
          <item>
        <tid>173712</tid>
        <value><![CDATA[Howey Physics Building]]></value>
      </item>
          <item>
        <tid>195274</tid>
        <value><![CDATA[Geosynthetic Institute Lab]]></value>
      </item>
          <item>
        <tid>195275</tid>
        <value><![CDATA[School for Arts]]></value>
      </item>
          <item>
        <tid>181460</tid>
        <value><![CDATA[arts and entertainment]]></value>
      </item>
          <item>
        <tid>185151</tid>
        <value><![CDATA[Georgia Tech Baptist Collegiate Ministry]]></value>
      </item>
          <item>
        <tid>194735</tid>
        <value><![CDATA[Smith and Howell Residence Halls]]></value>
      </item>
          <item>
        <tid>14768</tid>
        <value><![CDATA[Daniel Guggenheim School of Aerospace Engineering]]></value>
      </item>
      </field_keywords>
  <field_userdata><![CDATA[]]></field_userdata>
</node>
