{"691151":{"#nid":"691151","#data":{"type":"news","title":"Road Closure and Detour for Ninth Street and Curran Street July 22 \u2013 24","body":[{"value":"\u003Cp\u003EAs part of the Bud and Val Peterson residence hall\u0027s final construction activities, 9th Street and Curran Street will be subject to a temporary closure and detour from July 22 \u2013 24 to accommodate asphalt paving operations. This traffic pattern is the same detour configuration previously used during this project.\u003C\/p\u003E\u003Cp\u003EPlease note the following during the paving work:\u003C\/p\u003E\u003Cul\u003E\u003Cli data-list-item-id=\u0022e6fe61d44f8521da22ce99eae513c9c88\u0022\u003ENo parking will be permitted in the parallel parking spaces along 9th Street during the closure period.\u003C\/li\u003E\u003Cli data-list-item-id=\u0022eee05294d469255c0981be22acf98ff21\u0022\u003EAccess to the back-of-house area between Eighth Street East and Eighth Street West Apartments will remain available.\u003C\/li\u003E\u003Cli data-list-item-id=\u0022e74058df6a97df8e044d251ad38858f87\u0022\u003ESidewalks along both 9th Street and Curran Street will be closed for the duration of the paving operation.\u003C\/li\u003E\u003Cli data-list-item-id=\u0022e6f794a011bd5b15d068b9315b51c962e\u0022\u003EMotorists and pedestrians are encouraged to follow posted detour signage and use alternate routes as needed.\u003C\/li\u003E\u003C\/ul\u003E\u003Cp\u003EWe appreciate your patience and cooperation as this work is completed.\u003C\/p\u003E\u003Cp\u003EIf you have any questions, please contact the project team.\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EAsphalt paving for the new residence hall will require a road closure and detour for Ninth Street and Curran Street.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Asphalt paving for the new residence hall will require a road closure and detour for Ninth Street and Curran Street."}],"uid":"35028","created_gmt":"2026-07-16 20:56:52","changed_gmt":"2026-07-16 21:01:56","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","location":"Atlanta, GA","dateline":{"date":"2026-07-16T00:00:00-04:00","iso_date":"2026-07-16T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"680621":{"id":"680621","type":"image","title":"image002--1-.png","body":null,"created":"1784235423","gmt_created":"2026-07-16 20:57:03","changed":"1784235423","gmt_changed":"2026-07-16 20:57:03","alt":"Image of logistics map for asphalt paving on 9th Street and Curran Street","file":{"fid":"264909","name":"image002--1-.png","image_path":"\/sites\/default\/files\/2026\/07\/16\/image002--1-.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2026\/07\/16\/image002--1-.png","mime":"image\/png","size":1723104,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2026\/07\/16\/image002--1-.png?itok=QSzXbMzw"}}},"media_ids":["680621"],"groups":[{"id":"383831","name":"Infrastructure and Operations"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"182121","name":"construction updates"},{"id":"194943","name":"Bud and Vale Peterson Residence Hall"},{"id":"188775","name":"9th street"},{"id":"193113","name":"Curran Street"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EChris Williams\u003C\/p\u003E\u003Cp\u003EProject Manager\u003C\/p\u003E\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\u003Cp\u003E470-553-7197\u003C\/p\u003E","format":"limited_html"}],"email":["cbwilliams@gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}