{"690919":{"#nid":"690919","#data":{"type":"news","title":"Techwood Drive Full Road Closure:  July 1 \u2013 Aug. 2 ","body":[{"value":"\u003Cdiv\u003E\u003Cp\u003EBeginning July 1, Techwood Drive will be fully closed to vehicular traffic between Bobby Dodd Way and North Avenue to support utility work associated with the renovation of the Smith and Howell residence halls. The sidewalk next to Bobby Dodd Stadium at Hyundai Field will be closed to pedestrians. The eastern sidewalk, in front of the residence halls, will be open on either side of the project entrance. \u0026nbsp;\u003C\/p\u003E\u003C\/div\u003E\u003Cdiv\u003E\u003Cp\u003E\u003Cstrong\u003EWhat to Expect:\u003C\/strong\u003E\u0026nbsp;\u003C\/p\u003E\u003C\/div\u003E\u003Cdiv\u003E\u003Cul\u003E\u003Cli data-list-item-id=\u0022e070fe1fc640673826edffcd477c03a93\u0022\u003EThe closure is scheduled to remain in place through Aug. 2; weather may affect the completion date.\u0026nbsp;\u003C\/li\u003E\u003C\/ul\u003E\u003C\/div\u003E\u003Cdiv\u003E\u003Cul\u003E\u003Cli data-list-item-id=\u0022ea4b244c236a632d95e30befc0d8787b6\u0022\u003EDetour routes and signage will be clearly marked.\u0026nbsp;\u003C\/li\u003E\u003C\/ul\u003E\u003C\/div\u003E\u003Cdiv\u003E\u003Cul\u003E\u003Cli data-list-item-id=\u0022e422f9d49bd55bac60c7a4d896bc210dc\u0022\u003EPolice-assisted traffic control will help maintain the safe movement of pedestrians and vehicles in the area. \u0026nbsp;\u003C\/li\u003E\u003C\/ul\u003E\u003C\/div\u003E\u003Cdiv\u003E\u003Cp\u003EThis work is part of a broader renovation of the Smith and Howell residence halls, which includes upgrades to building systems, enhanced interior spaces, and improved ADA accessibility. The addition of a new connecting structure will link the two buildings and create a welcoming central entrance.\u0026nbsp;\u003C\/p\u003E\u003C\/div\u003E\u003Cdiv\u003E\u003Cp\u003ESee the attached logistics and detour map for further details. Thank you for your patience as we make improvements to our campus residence halls.\u0026nbsp;\u003C\/p\u003E\u003C\/div\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe closure is in support of the utility work associated with the renovation of the Smith and Howell residence halls.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"The closure is in support of the utility work associated with the renovation of the Smith and Howell residence halls."}],"uid":"35028","created_gmt":"2026-06-25 19:51:35","changed_gmt":"2026-06-25 19:57:30","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","location":"Atlanta, GA","dateline":{"date":"2026-06-25T00:00:00-04:00","iso_date":"2026-06-25T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"680517":{"id":"680517","type":"image","title":"Techwood-Dr-Utility-Install-Full-St-Closure_Smith_Howell_reno.jpg","body":null,"created":"1782417301","gmt_created":"2026-06-25 19:55:01","changed":"1782417404","gmt_changed":"2026-06-25 19:56:44","alt":"image of logistics and detour map for Techwood Drive closure July 1 - Aug. 2","file":{"fid":"264790","name":"Techwood-Dr-Utility-Install-Full-St-Closure_Smith_Howell_reno.jpg","image_path":"\/sites\/default\/files\/2026\/06\/25\/Techwood-Dr-Utility-Install-Full-St-Closure_Smith_Howell_reno.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2026\/06\/25\/Techwood-Dr-Utility-Install-Full-St-Closure_Smith_Howell_reno.jpg","mime":"image\/jpeg","size":506637,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2026\/06\/25\/Techwood-Dr-Utility-Install-Full-St-Closure_Smith_Howell_reno.jpg?itok=Es4YlUxf"}}},"media_ids":["680517"],"groups":[{"id":"383831","name":"Infrastructure and Operations"},{"id":"1214","name":"News Room"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"188001","name":"Techwood Drive"},{"id":"61411","name":"Campus Construction"},{"id":"10969","name":"road closure"},{"id":"194735","name":"Smith and Howell Residence Halls"}],"core_research_areas":[],"news_room_topics":[{"id":"71871","name":"Campus and Community"}],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EChris Williams\u003C\/p\u003E\u003Cp\u003EProject Manager\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E","format":"limited_html"}],"email":["cbwilliams@gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}