{"688543":{"#nid":"688543","#data":{"type":"news","title":"Road Paving Work Planned for Bobby Dodd Way and Brittain Drive","body":[{"value":"\u003Cp\u003EAs construction of the Thomas A. Fanning Student-Athlete Performance Center enters its final stages, road paving improvements on Bobby Dodd Way and Brittain Drive are expected to begin Monday, March 2, and continue through Friday, March 6. Timing of this work is contingent on weather conditions.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003ESections of these roads will be closed during the paving project.\u0026nbsp;\u003C\/p\u003E\u003Cul\u003E\u003Cli\u003EThe work on Bobby Dodd Way will take place between Techwood Drive and Brittain Drive. \u003C\/li\u003E\u003Cli\u003EOn Brittain Drive, paving will occur from the Peters Parking Deck entrance down to Bobby Dodd Way.\u003C\/li\u003E\u003C\/ul\u003E\u003Cp\u003EThe attached map highlights the areas affected.\u003C\/p\u003E\u003Cp\u003EThank you for your patience as we enhance the road surfaces in these key campus areas.\u003C\/p\u003E\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EAs the construction of the Student Athlete Performance Center enters its final stages, road paving improvements around the area are expected to begin on March 2.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"As the construction of the Student Athlete Performance Center enters its final stages, road paving improvements are planned for early March."}],"uid":"35028","created_gmt":"2026-02-26 16:35:40","changed_gmt":"2026-02-27 17:37:24","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","location":"Atlanta, GA","dateline":{"date":"2026-02-26T00:00:00-05:00","iso_date":"2026-02-26T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"679456":{"id":"679456","type":"image","title":"2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg","body":"\u003Cp\u003EMap indicating road closures for Bobby Dodd Way and Brittain Drive March 2 through 6. Dependent upon weather.\u003C\/p\u003E","created":"1772126965","gmt_created":"2026-02-26 17:29:25","changed":"1772126965","gmt_changed":"2026-02-26 17:29:25","alt":"Image of map indicating road closures for Bobby Dodd Way and Brittain Drive March 2 - 6","file":{"fid":"263620","name":"2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg","image_path":"\/sites\/default\/files\/2026\/02\/26\/2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2026\/02\/26\/2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg","mime":"image\/jpeg","size":178820,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2026\/02\/26\/2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg?itok=xv3-V1PP"}}},"media_ids":["679456"],"groups":[{"id":"383831","name":"Facilities Management"},{"id":"1214","name":"News Room"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"182121","name":"construction updates"},{"id":"13283","name":"Bobby Dodd Way"},{"id":"188429","name":"Brittain Drive"},{"id":"61411","name":"Campus Construction"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Ca href=\u0022mailto:heather.hardie@facilities.gatech.edu\u0022\u003EHeather Hardie\u003C\/a\u003E\u003Cbr\u003ESenior Construction Manager\u003Cbr\u003EPlanning, Design, and Construction\u003C\/p\u003E\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E","format":"limited_html"}],"email":["heather.hardie@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}