{"688490":{"#nid":"688490","#data":{"type":"news","title":"The Campus Construction Projects Driving Georgia Tech\u2019s Future","body":[{"value":"\u003Cp\u003EGeorgia Tech continually works to transform its physical campus in support of a more innovative, sustainable, and accessible learning environment. This update highlights the latest milestones, upcoming timelines, and how current work across campus contributes to Tech\u2019s long\u2011term vision for growth and excellence.\u003C\/p\u003E\u003Ch4\u003E\u003Cstrong\u003ERecently Completed\u003C\/strong\u003E\u003C\/h4\u003E\u003Cp\u003E\u003Cstrong\u003ED.M. Smith Building Renewal\u0026nbsp;\u003C\/strong\u003E\u003Cbr\u003ERenovations are complete, with transformative upgrades to the 100-year-old building that enhance accessibility, increase functionality, and support campus sustainability initiatives. They include the addition of wheelchair access, a new elevator, and updated mechanical, electrical, and plumbing systems. The building is fully electric and no longer relies on steam from the central plant for daily operations.\u0026nbsp;\u003Ca href=\u0022https:\/\/iac.gatech.edu\/featured-news\/2026\/01\/newly-rejuvenated-smith-building-ready\u0022\u003ERead more about the D.M. Smith Building renewal.\u003C\/a\u003E\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003EGeorge Tower | Scheller Tower (formerly Tech Square 3)\u0026nbsp;\u003C\/strong\u003E\u003Cbr\u003EOfficially opened on Jan. 12, the first three floors of the building feature classrooms, huddle and conference rooms, and both indoor and outdoor collaboration space. Kaldi\u2019s Coffee is located on the lobby level.\u003C\/p\u003E\u003Cp\u003EThe 14-story Scheller Tower will serve as the new home for the MBA and Executive Education programs of the Scheller College of Business. The 18-story George Tower, will house the H. Milton Stewart School of Industrial and Systems Engineering. Both towers are on schedule to open in Fall 2026.\u0026nbsp;\u003Ca href=\u0022https:\/\/news.gatech.edu\/news\/2026\/01\/07\/tech-square-3-reaches-major-milestone\u0022\u003ERead more about George Tower | Scheller Tower.\u003C\/a\u003E\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003EStamps Field Turf\u003C\/strong\u003E\u003Cbr\u003EThe Stamps Field turf replacement project incorporated new padding and a multi\u2011layer synthetic surface offering better shock absorption and expanded playability. Updated striping allows for a wider range of recreational and competitive activities. Work also included adding new wind screens, improving access control and gate configurations, installing hydration stations, and cleaning the stormwater detention systems beneath the field. The new layout supports multiple sports, including soccer, lacrosse, flag football, rugby, and softball.\u003C\/p\u003E\u003Ch4\u003E\u003Ca\u003E\u003Cstrong\u003ESoon to Wrap Up\u003C\/strong\u003E\u003C\/a\u003E\u003C\/h4\u003E\u003Cp\u003E\u003Cstrong\u003ECampus Recreation Center (CRC) Athletic Therapy Center and Esports Arena\u0026nbsp;\u0026nbsp;\u003C\/strong\u003E\u003Cbr\u003EThe renovation on Level 2 of the CRC will transform an existing conference room and retail dining area into a dedicated physical therapy space. Adjacent to this, a new esports suite will support competitive gaming for student clubs and casual play for the campus community, and host special events. The project is slated for completion in May.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003ELi Labs \u2013 Paper Tricentennial Building\u003C\/strong\u003E\u003Cbr\u003ERenovation of eight labs on the first and fifth floors will prepare for a high-end microscope that uses open-beam lasers for illumination on a vibration-isolation table, accommodating both students and researchers in the School of Materials Science and Engineering. The renovation is scheduled for completion in March.\u003C\/p\u003E\u003Ch4\u003E\u003Cstrong\u003EIn Progress\u003C\/strong\u003E\u003C\/h4\u003E\u003Cp\u003E\u003Cstrong\u003E10th Street Power Plant Chiller Replacement\u003C\/strong\u003E\u003Cbr\u003EThe project includes replacing chillers and associated components to optimize overall system performance. Two replacement chillers and cooling towers have been installed, and piping work is ongoing. Completion is scheduled for May.\u003C\/p\u003E\u003Cp\u003E\u003Ca\u003E\u003Cstrong\u003EBaptist Collegiate Ministry Building\u0026nbsp;\u003C\/strong\u003E\u003C\/a\u003E\u003Cbr\u003EWhile not a Georgia Tech-owned project, this new five-story, mixed-use building is set to rise in the footprint of the original building on the west side of Techwood Drive near Fourth Street. The development will provide upgraded ministry facilities along with 55 one- and two bedroom residences \u0026nbsp;intended for student occupancy, along with gathering spaces. The targeted completion date is Fall 2027.\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003ECreative Quarter\u0026nbsp;\u003C\/strong\u003E\u003Cbr\u003EGeorgia Tech\u2019s Creative Quarter, currently anchored at the former Randall Brothers site located along Marietta Street, will debut in May with a temporary cultural initiative called LOOP, powered by Goat Farm. The project will feature a performance venue and artist studios, along with flexible interior spaces designed for multidisciplinary experimentation, connecting innovators, artists, students, and visitors.\u0026nbsp;\u003Ca href=\u0022https:\/\/arts.gatech.edu\/loop\u0022\u003ERead more about the Creative Quarter.\u003C\/a\u003E\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003EBud and Val Peterson Residence Hall\u0026nbsp; \u0026nbsp;\u003C\/strong\u003E\u003Cbr\u003EThe first new residence hall on campus since 2005 is designed specifically for first-year students. Located on the west side of campus along Northside Drive between Eighth and Ninth streets, this state-of-the-art facility will span 191,000 square feet and offer 862 beds in double-occupancy rooms.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EThe building will include collaborative learning areas, community lounges, and a shared kitchen. Both tower structures and site utilities are complete; interior finishes are underway, and site hardscape and landscape will begin in the spring. It is scheduled to open in Fall 2026.\u0026nbsp;\u003Ca href=\u0022https:\/\/news.gatech.edu\/news\/2025\/09\/22\/new-residence-hall-be-named-former-president-first-lady\u0022\u003ERead more about the Bud and Val Peterson Residence Hall.\u0026nbsp;\u003C\/a\u003E\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003EEast Campus Streetscapes\u0026nbsp;\u003C\/strong\u003E\u0026nbsp;\u003Cbr\u003EAlong Techwood Drive and the east side of campus, the renovation of sidewalks and roadways has improved campus connectivity and the safety of pedestrian and micromobility users. The project is still active, as the remaining elements along Techwood Drive are contingent upon the completion of the Thomas A. Fanning Student-Athlete Performance Center.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003EThomas A. Fanning Student-Athlete Performance Center\u0026nbsp;\u0026nbsp;\u003C\/strong\u003E\u003Cbr\u003EWork continues on the 100,000-square-foot facility, which will house strength and conditioning areas, nutrition stations, sports medicine offices, ticketing services, dining options, and academic support spaces. The building will also feature cutting-edge sports science and analytics labs designed to enhance performance and research capabilities.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EInterior progress includes painting, flooring, and equipment installation. Exterior site work is ongoing, and spring completion is expected. \u003Ca href=\u0022https:\/\/ramblinwreck.com\/georgia-tech-breaks-ground-on-fanning-center\/\u0022\u003ERead more about the Student-Athlete Performance Center\u003C\/a\u003E.\u003C\/p\u003E\u003Ch4\u003E\u003Cstrong\u003EOn the Horizon\u003C\/strong\u003E\u003C\/h4\u003E\u003Cp\u003E\u003Cstrong\u003EBobby Dodd Fan Experience Renovation\u003C\/strong\u003E\u003Cbr\u003ECurrently in the design phase, this renovation project will significantly enhance the premium seating areas on the west sideline, diversify premium seating to enable tiered experiences, and add chairback seating to the entire east and west sidelines to elevate the gameday experience for all Georgia Tech fans, alumni, and students.\u003C\/p\u003E\u003Cp\u003EThe west sideline renovations will feature a premium level with a 100+ seat Founder\u2019s Club overlooking midfield, numerous renovated suites, and upgraded press operations and food service areas. The east sideline will feature an updated Field Club lounge, a new VIP suite, and additional updated suites. Currently in the design phase, project completion is expected for the 2027 football season. \u003Ca href=\u0022https:\/\/atfund.org\/bobby-dodd-stadium\u0022\u003ERead more about the Bobby Dodd Fan Experience Renovation.\u003C\/a\u003E\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003EDaniel Guggenheim School of Aerospace Engineering\u003C\/strong\u003E\u0026nbsp;\u003Cbr\u003ECurrently in project development, a new 200,000-square-foot building for the Guggenheim School will provide advanced instructional space, new research capabilities, and an improved student experience, potentially including new wind tunnels, flight simulators, and advanced fabrication and assembly areas. \u003Ca href=\u0022https:\/\/ae.gatech.edu\/building-future-aerospace-engineering\u0022\u003ERead more about the Aerospace Engineering building\u003C\/a\u003E.\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003EHowey Physics Restroom Renovations\u003C\/strong\u003E\u003Cbr\u003EThe renovation will evaluate the building\u2019s existing plumbing capacity; determine where new single-use restrooms and additional fixtures should be added; and renovate finishes, ceilings, and lighting throughout the basement and first five floors. Renovations are expected to start in the spring and take approximately four months to complete.\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003ESmith and Howell Residence Halls\u0026nbsp;\u003C\/strong\u003E\u0026nbsp;\u003Cbr\u003ETo preserve their historic character and meet projected housing needs, both residence halls will be renovated. This includes updating building systems and interior spaces. A new connecting structure will join the two buildings, creating a central entry point. Also planned are ADA accessibility improvements to all floors and enhanced lighting and amenities. This project is currently in the final design phase, with construction expected to start mid-year.\u003C\/p\u003E\u003Cp\u003E\u003Cstrong\u003ESkiles Infrastructure Renovation\u003C\/strong\u003E\u0026nbsp;\u003Cbr\u003ECurrently in the design phase, the renovation will focus on the most pressing need by improving indoor air quality by replacing and upgrading the building\u2019s mechanical systems in specific areas. The project marks the beginning of a broader, multiphase effort to modernize and revitalize the Skiles Building, constructed in 1959.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003ETo stay up to date on campus construction projects, use the I\u0026amp;S\u0026nbsp;\u003Ca href=\u0022https:\/\/facilities.gatech.edu\/construction-updates\u0022\u003E\u0026nbsp;Construction Project Viewer.\u003C\/a\u003E This dynamic tool meshes a map and calendar interface, allowing users to easily track project start and end dates. ADA-accessible routes can also be located by zooming in on individual projects.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EFor behind-the-scenes updates, follow Infrastructure and Sustainability on\u0026nbsp;\u003Ca href=\u0022https:\/\/www.linkedin.com\/company\/105498147\/admin\/page-posts\/published\/\u0022\u003ELinkedIn\u003C\/a\u003E \u2014 where you\u2019ll find exclusive sneak peeks, progress photos, and insights into the ongoing construction efforts that are shaping the future of Georgia Tech.\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EGeorgia Tech is advancing an ambitious slate of campus construction projects designed to support its long\u2011term growth and future innovation.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Georgia Tech is advancing an ambitious slate of campus construction projects designed to support its long-term growth and future innovation."}],"uid":"35028","created_gmt":"2026-02-24 15:28:40","changed_gmt":"2026-04-01 19:54:59","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","location":"Atlanta, GA","dateline":{"date":"2026-02-24T00:00:00-05:00","iso_date":"2026-02-24T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"679407":{"id":"679407","type":"image","title":"CCU_Feb2026_smithhowellreno1.png","body":"\u003Cp\u003ERendering of the planned connector entrance to Smith and Howell residence halls. (Subject to change.)\u003C\/p\u003E","created":"1771952324","gmt_created":"2026-02-24 16:58:44","changed":"1771952324","gmt_changed":"2026-02-24 16:58:44","alt":"Rendering of the planned connector entrance to Smith and Howell residence halls.","file":{"fid":"263568","name":"CCU_Feb2026_smithhowellreno1.png","image_path":"\/sites\/default\/files\/2026\/02\/24\/CCU_Feb2026_smithhowellreno1.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2026\/02\/24\/CCU_Feb2026_smithhowellreno1.png","mime":"image\/png","size":631076,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2026\/02\/24\/CCU_Feb2026_smithhowellreno1.png?itok=wyWW_0To"}},"679408":{"id":"679408","type":"image","title":"CCU_Feb2026_smithhowellreno2.png","body":"\u003Cp\u003ERendering of the interior of the planned connector building for the Smith and Howell Residence Halls.\u003C\/p\u003E","created":"1771952562","gmt_created":"2026-02-24 17:02:42","changed":"1771952562","gmt_changed":"2026-02-24 17:02:42","alt":"Rendering of the interior of the planned connector building for the Smith and Howell Residence Halls.","file":{"fid":"263569","name":"CCU_Feb2026_smithhowellreno2.png","image_path":"\/sites\/default\/files\/2026\/02\/24\/CCU_Feb2026_smithhowellreno2.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2026\/02\/24\/CCU_Feb2026_smithhowellreno2.png","mime":"image\/png","size":505325,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2026\/02\/24\/CCU_Feb2026_smithhowellreno2.png?itok=bZzG92b6"}}},"media_ids":["679407","679408"],"groups":[{"id":"383831","name":"Facilities Management"},{"id":"1214","name":"News Room"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"61411","name":"Campus Construction"},{"id":"192186","name":"Student Athlete Performance Center"},{"id":"194888","name":"George Tower | Scheller Tower"},{"id":"194943","name":"Bud and Vale Peterson Residence Hall"},{"id":"194376","name":"Curran Street Residence Hall"},{"id":"13680","name":"Bobby Dodd Stadium"},{"id":"194735","name":"Smith and Howell Residence Halls"},{"id":"174985","name":"Skiles Classroom Building"},{"id":"719","name":"CRC"},{"id":"192183","name":"D.M. Smith Building Renewal"},{"id":"13327","name":"Guggenheim School of Aerospace Engineering"},{"id":"193728","name":"I\u0026S News"}],"core_research_areas":[],"news_room_topics":[{"id":"71871","name":"Campus and Community"}],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003ECathy Brim\u003C\/p\u003E\u003Cp\u003ECommunications Officer II\u003C\/p\u003E\u003Cp\u003EInstitute Communications\u003C\/p\u003E\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E","format":"limited_html"}],"email":["Cathy.brim@gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}