{"688241":{"#nid":"688241","#data":{"type":"news","title":"Additional Pedestrian and Bike Signals Added to Fifth Street, Bobby Dodd Way, and Techwood Drive Intersections","body":[{"value":"\u003Cp\u003EAdditional pedestrian and bike signalization heads will be added to intersection of Fifth Street and Techwood Drive on Friday, Feb. 13. Concurrently, the pedestrian and bike signalization heads at Techwood Drive and Bobby Dodd Way will be tested and adjusted.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EDuring the installation and adjustments, the intersection may default to a four way stop with work lasting 2-3 hours. Traffic patterns will remain as is during the work.\u003C\/p\u003E\u003Cp\u003EThank you for your patience as we continue to make enhancements to campus safety.\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EAdditional safety measures installed at three campus intersections.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Additional safety measures installed at three campus intersections."}],"uid":"35028","created_gmt":"2026-02-13 14:50:07","changed_gmt":"2026-02-16 17:29:21","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","location":"Atlanta, GA","dateline":{"date":"2026-02-13T00:00:00-05:00","iso_date":"2026-02-13T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"679295":{"id":"679295","type":"image","title":"Fifth Street Bike Signals Feb. 13 2026","body":"\u003Cp\u003EAdditional Pedestrian\/Bike signalization heads to be added at 5th and Techwood Drive 2\/13. Pedestrian\/Bike signalization heads at Bobby Dodd Way and Techwood Drive will be tested and adjusted 2\/13.\u003C\/p\u003E","created":"1771262878","gmt_created":"2026-02-16 17:27:58","changed":"1771262923","gmt_changed":"2026-02-16 17:28:43","alt":"Additional Pedestrian\/Bike signalization heads to be added at 5th and Techwood Drive 2\/13. Pedestrian\/Bike signalization heads at Bobby Dodd Way and Techwood Drive will be tested and adjusted 2\/13.","file":{"fid":"263436","name":"Fifth-Street-Bike-Signals-Feb.-13-2026_0.png","image_path":"\/sites\/default\/files\/2026\/02\/16\/Fifth-Street-Bike-Signals-Feb.-13-2026_0.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2026\/02\/16\/Fifth-Street-Bike-Signals-Feb.-13-2026_0.png","mime":"image\/png","size":4518839,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2026\/02\/16\/Fifth-Street-Bike-Signals-Feb.-13-2026_0.png?itok=GMF2GmTm"}}},"media_ids":["679295"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"182121","name":"construction updates"},{"id":"188001","name":"Techwood Drive"},{"id":"13283","name":"Bobby Dodd Way"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EJerry Young\u003C\/p\u003E\u003Cp\u003ELandscape Project Manager\u003C\/p\u003E\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E","format":"limited_html"}],"email":["jerry.young@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}