{"679209":{"#nid":"679209","#data":{"type":"news","title":"Third Street and Williams Street Closed Near the Third Street Tunnel for Utility Installation Jan. 16 \u2013 21","body":[{"value":"\u003Cp\u003EThe installation of sanitary lines for a new dumpster pad along Williams Street will require Third Street and Williams Street to close from Jan. 16 \u2013 Jan. 21.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EBecause Third Street is currently the detour for traffic heading southbound, Techwood Drive will be open between Bobby Dodd Way and North Avenue during this timeframe. Once complete, the southbound lane will reclose for the continuation of work for the Student Athlete Performance Center.\u003C\/p\u003E\u003Cp\u003EPlease see the attached graphic for additional information.\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EWork continues on the East Campus Streetscape project impacting Third and Williams Street.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Work continues on the East Campus Streetscape project impacting Third and Williams Street."}],"uid":"35028","created_gmt":"2025-01-06 20:55:11","changed_gmt":"2025-01-07 21:09:52","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","location":"Atlanta, GA","dateline":{"date":"2025-01-06T00:00:00-05:00","iso_date":"2025-01-06T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"675949":{"id":"675949","type":"image","title":"Dumpster Pad Paving Sequencing Plan 1.3.25 REV_Page_1 (1).jpg","body":null,"created":"1736196343","gmt_created":"2025-01-06 20:45:43","changed":"1736196343","gmt_changed":"2025-01-06 20:45:43","alt":"map of logistics for milling and paving of Techwood and Fourth Street and 3rd Street and Williams work","file":{"fid":"259632","name":"Dumpster Pad Paving Sequencing Plan 1.3.25 REV_Page_1 (1).jpg","image_path":"\/sites\/default\/files\/2025\/01\/06\/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2025\/01\/06\/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg","mime":"image\/jpeg","size":2111212,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2025\/01\/06\/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg?itok=-1WUYjWD"}}},"media_ids":["675949"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"192184","name":"East Campus Streetscape"},{"id":"61411","name":"Campus Construction"},{"id":"193671","name":"I\u0026S Construction Notices"},{"id":"182121","name":"construction updates"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EJerry Young\u003C\/p\u003E\u003Cp\u003ELandscape Project Manager\u003C\/p\u003E\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\u003Cp\u003E404-565-3449\u003C\/p\u003E","format":"limited_html"}],"email":["jerry.young@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}