{"679202":{"#nid":"679202","#data":{"type":"news","title":"East Campus Streetscapes Milling and Paving of Fourth Street and Techwood Drive Jan. 13 \u2013 17","body":[{"value":"\u003Cp\u003EMilling and paving of the final section of Techwood Drive and 4th street will occur during the week of Jan. 13 through Jan. 17.\u003C\/p\u003E\u003Cp\u003EDuring paving, the roads will remain open and traffic will be flagged through the construction area.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EPlease see attached graphic for additional information.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EWork continues on the East Campus Streetscape improvement project.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Work continues on the East Campus Streetscape improvement project."}],"uid":"35028","created_gmt":"2025-01-06 19:33:05","changed_gmt":"2025-01-07 21:10:56","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","location":"Atlanta, GA","dateline":{"date":"2025-01-06T00:00:00-05:00","iso_date":"2025-01-06T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"675949":{"id":"675949","type":"image","title":"Dumpster Pad Paving Sequencing Plan 1.3.25 REV_Page_1 (1).jpg","body":null,"created":"1736196343","gmt_created":"2025-01-06 20:45:43","changed":"1736196343","gmt_changed":"2025-01-06 20:45:43","alt":"map of logistics for milling and paving of Techwood and Fourth Street and 3rd Street and Williams work","file":{"fid":"259632","name":"Dumpster Pad Paving Sequencing Plan 1.3.25 REV_Page_1 (1).jpg","image_path":"\/sites\/default\/files\/2025\/01\/06\/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2025\/01\/06\/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg","mime":"image\/jpeg","size":2111212,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2025\/01\/06\/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg?itok=-1WUYjWD"}}},"media_ids":["675949"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"192184","name":"East Campus Streetscape"},{"id":"61411","name":"Campus Construction"},{"id":"182121","name":"construction updates"},{"id":"193671","name":"I\u0026S Construction Notices"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EJerry Young\u003C\/p\u003E\u003Cp\u003ELandscape Project Manager\u003C\/p\u003E\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\u003Cp\u003E404-565-3449\u003C\/p\u003E\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E","format":"limited_html"}],"email":["jerry.young@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}