{"678592":{"#nid":"678592","#data":{"type":"news","title":"East Campus Streetscape Enters Final Phase with Impacts to 4th Street and Techwood Drive Beginning Nov. 25","body":[{"value":"\u003Cp\u003EEffective Nov. 25, the final phase of the East Campus Streetscape project will begin with construction of new alignment of the intersection at 4th Street and Techwood Drive. Please see bullet points below outlining access and circulation.\u003C\/p\u003E\u003Cul\u003E\u003Cli\u003ETechwood Drive north and southbound lanes will remain open at all times.\u003C\/li\u003E\u003Cli\u003E4th street to be closed to vehicular through traffic east of Brittain Drive to Techwood Drive. Delta Sigma Phi will have access to their parking lot off 0f 4th Street.\u003C\/li\u003E\u003Cli\u003ESidewalks on 4th Street will be closed east of Sigma Chi and Chi Psi. Pedestrian traffic should use alleyways for east\/west access through area.\u003C\/li\u003E\u003Cli\u003ESee attached diagrams for additional information.\u0026nbsp;\u003C\/li\u003E\u003C\/ul\u003E\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EBeginning Nov. 25, the final phase of East Campus Streetscape will begin with construction of new alignment of intersection at 4th Street and Techwood Drive.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Beginning Nov. 25, the final phase of East Campus Streetscape will begin with construction of new alignment of intersection at 4th Street and Techwood Drive."}],"uid":"35028","created_gmt":"2024-11-21 18:19:13","changed_gmt":"2024-11-25 16:44:30","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","location":"Atlanta, GA","dateline":{"date":"2024-11-21T00:00:00-05:00","iso_date":"2024-11-21T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"675711":{"id":"675711","type":"image","title":"East Campus Streetscape 4th Street and Techwood Detour","body":null,"created":"1732212616","gmt_created":"2024-11-21 18:10:16","changed":"1732212872","gmt_changed":"2024-11-21 18:14:32","alt":"Detour route for East Campus Streetscape, Techwood Drive and 4th Street work","file":{"fid":"259367","name":"GT East Campus  4th and Techwood reconstruction vehicle rerouting (002).jpg","image_path":"\/sites\/default\/files\/2024\/11\/21\/GT%20East%20Campus%20%204th%20and%20Techwood%20reconstruction%20vehicle%20rerouting%20%28002%29.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/11\/21\/GT%20East%20Campus%20%204th%20and%20Techwood%20reconstruction%20vehicle%20rerouting%20%28002%29.jpg","mime":"image\/jpeg","size":200740,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/11\/21\/GT%20East%20Campus%20%204th%20and%20Techwood%20reconstruction%20vehicle%20rerouting%20%28002%29.jpg?itok=pKniRJNR"}},"675709":{"id":"675709","type":"image","title":"East Campus Streetscape Final Phase Logistics Map","body":null,"created":"1732209276","gmt_created":"2024-11-21 17:14:36","changed":"1732212587","gmt_changed":"2024-11-21 18:09:47","alt":"logistics map for east campus streetscapes phase 2","file":{"fid":"259365","name":"East Campus Streetscape Phase Two_nov2024_schematicjpg.jpg","image_path":"\/sites\/default\/files\/2024\/11\/21\/East%20Campus%20Streetscape%20Phase%20Two_nov2024_schematicjpg.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/11\/21\/East%20Campus%20Streetscape%20Phase%20Two_nov2024_schematicjpg.jpg","mime":"image\/jpeg","size":2351307,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/11\/21\/East%20Campus%20Streetscape%20Phase%20Two_nov2024_schematicjpg.jpg?itok=0P427Lac"}}},"media_ids":["675711","675709"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"193671","name":"I\u0026S Construction Notices"},{"id":"192184","name":"East Campus Streetscape"},{"id":"61411","name":"Campus Construction"},{"id":"182121","name":"construction updates"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EJeremiah Young\u003C\/strong\u003E\u003C\/p\u003E\u003Cp\u003ELandscape Project Manager\u003C\/p\u003E\u003Cp\u003EPlanning Design \u0026amp; Construction |\u0026nbsp;Infrastructure \u0026amp; Sustainability\u0026nbsp;\u003C\/p\u003E\u003Cp\u003E404-565-3449\u003C\/p\u003E","format":"limited_html"}],"email":["jerry.young@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}