{"676184":{"#nid":"676184","#data":{"type":"news","title":"Crane for Women\u0027s Walk Construction to Mobilize August 28","body":[{"value":"\u003Cp\u003EAs work continues for the Pathway of Progress: Celebrating Georgia Tech Women installation, a crane will be set-up and active on site beginning Wednesday, August 28 \u0026nbsp;through Friday, August 30, from 7 a.m. to 5 p.m. daily, to facilitate the project\u2019s construction.\u0026nbsp; There will be a total of 2 (two) delivery trucks that will enter and exit the barricaded, controlled-access zone daily. \u0026nbsp;Each evening, the crane will remain on site, secured and locked, with red caution tape around the crane\u2019s swing perimeter.\u003C\/p\u003E\u003Cp\u003EFor the safety of students, faculty and staff, the contractor will have the perimeter of the area barricaded with no pedestrian access. Flaggers will guide both the crane and the delivery trucks as they enter and depart the barricaded area from the parking lot.\u0026nbsp; All pedestrians will be directed to the alternate routes as show in red on the Site Layout \u0026amp; Logistics Plan.\u003C\/p\u003E\u003Cp\u003EBelow is a diagram of the crane location and pedestrian detour.\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003ETo continue construction for this campus installation, a crane will be utilized for several days on site.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"To continue construction for this campus installation, a crane will be utilized for several days on site."}],"uid":"35028","created_gmt":"2024-08-22 22:29:27","changed_gmt":"2024-08-22 22:32:29","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-08-22T00:00:00-04:00","iso_date":"2024-08-22T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"674695":{"id":"674695","type":"image","title":"crane_mobilization_logistics.png","body":null,"created":"1724365839","gmt_created":"2024-08-22 22:30:39","changed":"1724365839","gmt_changed":"2024-08-22 22:30:39","alt":"map of logistics for crane mobilization at Women\u0027s Walk site","file":{"fid":"258250","name":"crane_mobilization_logistics.png","image_path":"\/sites\/default\/files\/2024\/08\/22\/crane_mobilization_logistics.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/08\/22\/crane_mobilization_logistics.png","mime":"image\/png","size":551339,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/08\/22\/crane_mobilization_logistics.png?itok=j1tZAyni"}}},"media_ids":["674695"],"related_links":[{"url":"https:\/\/news.gatech.edu\/features\/2024\/03\/celebrating-georgia-tech-women?utm_source=newsletter\u0026utm_medium=email\u0026utm_content=Full%20Story%0A\u0026utm_campaign=Daily%20Digest%20-%20March%2027%2C%202024","title":"Read more about the Pathway of Progress: Celebrating Georgia Tech Women"}],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"193671","name":"I\u0026S Construction Notices"},{"id":"61411","name":"Campus Construction"},{"id":"193775","name":"Pathway of Progress: Celebrating Georgia Tech Women"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003ECarla Barbour, PMP, LEED AP\u003C\/strong\u003E\u003C\/p\u003E\u003Cp\u003E\u0026nbsp;Sr. Project Manager | Planning, Design \u0026amp; Construction\u003C\/p\u003E\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E","format":"limited_html"}],"email":["carla.barbour@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}