{"675559":{"#nid":"675559","#data":{"type":"news","title":"Phase 3 of the Ferst Drive Realignment and Cycle Track Project Begins","body":[{"value":"\u003Cp\u003EThe Ferst Drive realignment, safety, and connectivity project will provide improved bicycle infrastructure and allow for separation between bikes, pedestrians, and vehicles along this campus corridor. This project will also address the realignment of Ferst Drive at Regents Drive, which will ultimately eliminate the traffic signal and enable connectivity to the planned bicycle infrastructure southwest of campus. A cycle track will be installed along Ferst Drive, providing improved safety and separation between cycles and buses at the bus stops.\u003C\/p\u003E\u003Cp\u003EPhase 3 begins Monday, July 22. The attached plans signify construction limits and pedestrian circulation routes around the installed construction fencing. As Phase 3 begins, milling and paving operations will continue for Phases 1 and 2. \u0026nbsp;Expect delays traveling through these areas.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EPlease pardon our progress as we strive to improve the safety and connectivity of campus.\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EConstruction begins for this project in the area of the CRC, Groseclose, the ISYE Annex, and Exhibition Hall.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Construction begins for this project in the area of the CRC, Groseclose, the ISYE Annex, and Exhibition Hall."}],"uid":"35028","created_gmt":"2024-07-22 19:36:13","changed_gmt":"2024-07-22 19:48:13","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-07-22T00:00:00-04:00","iso_date":"2024-07-22T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"674398":{"id":"674398","type":"image","title":"Ferst Dr Render-07-22 Construction zone_july2024jpg.jpg","body":null,"created":"1721677344","gmt_created":"2024-07-22 19:42:24","changed":"1721677344","gmt_changed":"2024-07-22 19:42:24","alt":"map of logistics for construction zone Ferst Drive Phase 3","file":{"fid":"257903","name":"Ferst Dr Render-07-22 Construction zone_july2024jpg.jpg","image_path":"\/sites\/default\/files\/2024\/07\/22\/Ferst%20Dr%20Render-07-22%20Construction%20zone_july2024jpg.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/07\/22\/Ferst%20Dr%20Render-07-22%20Construction%20zone_july2024jpg.jpg","mime":"image\/jpeg","size":641655,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/07\/22\/Ferst%20Dr%20Render-07-22%20Construction%20zone_july2024jpg.jpg?itok=AWv170pZ"}},"674399":{"id":"674399","type":"image","title":"Ferst Dr Render-Phases_July2024jpg.jpg","body":null,"created":"1721677445","gmt_created":"2024-07-22 19:44:05","changed":"1721677445","gmt_changed":"2024-07-22 19:44:05","alt":"Map of construction phase timeline for Ferst Drive Realignment project","file":{"fid":"257904","name":"Ferst Dr Render-Phases_July2024jpg.jpg","image_path":"\/sites\/default\/files\/2024\/07\/22\/Ferst%20Dr%20Render-Phases_July2024jpg.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/07\/22\/Ferst%20Dr%20Render-Phases_July2024jpg.jpg","mime":"image\/jpeg","size":1247868,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/07\/22\/Ferst%20Dr%20Render-Phases_July2024jpg.jpg?itok=YxIBhqoh"}},"674400":{"id":"674400","type":"image","title":"Ferst Drive Realignmernt Phase 3 Pedestrian Circulation_july2024jpg.jpg","body":null,"created":"1721677572","gmt_created":"2024-07-22 19:46:12","changed":"1721677572","gmt_changed":"2024-07-22 19:46:12","alt":"Map of pedestrian circulation for Ferst Drive Realignment Project Phase 3","file":{"fid":"257905","name":"Ferst Drive Realignmernt Phase 3 Pedestrian Circulation_july2024jpg.jpg","image_path":"\/sites\/default\/files\/2024\/07\/22\/Ferst%20Drive%20Realignmernt%20Phase%203%20Pedestrian%20Circulation_july2024jpg.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/07\/22\/Ferst%20Drive%20Realignmernt%20Phase%203%20Pedestrian%20Circulation_july2024jpg.jpg","mime":"image\/jpeg","size":449204,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/07\/22\/Ferst%20Drive%20Realignmernt%20Phase%203%20Pedestrian%20Circulation_july2024jpg.jpg?itok=HX6ls7Sc"}}},"media_ids":["674398","674399","674400"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"193671","name":"I\u0026S Construction Notices"},{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"192185","name":"Ferst Drive Realignment and Cycle Track"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EJeremiah Young\u003C\/strong\u003E\u003C\/p\u003E\u003Cp\u003ELandscape Project Manager\u003C\/p\u003E\u003Cp\u003EPlanning Design \u0026amp; Construction |\u0026nbsp;Infrastructure \u0026amp; Sustainability\u0026nbsp;\u003C\/p\u003E\u003Cp\u003E404-565-3449\u003C\/p\u003E","format":"limited_html"}],"email":["jerry.young@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}