{"675453":{"#nid":"675453","#data":{"type":"news","title":"Portions of Bobby Dodd Way Partially Closed July 15 \u2013 August 5 for Student Athlete Performance Center Crane Demobilization and Utilities Work","body":[{"value":"\u003Cp\u003EBeginning July 15, two phases of construction work for the Student Athlete Performance Center will partially close Bobby Dodd Way in two separate areas.\u003C\/p\u003E\u003Cp\u003EPhase 1 (July 15 - 20) will close Bobby Dodd Way from Techwood Drive to just west of Fowler Street.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EPhase 2 (July 20 - August 5) will close Bobby Dodd Way from Techwood Drive to just east of Brittain Drive.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EPlease refer to the attached maps for specific details.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EFlaggers and police assistance will ensure the safety of the area during this timeframe.\u003C\/p\u003E\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003ETwo separate portions of Bobby Dodd Way will be partially closed for ongoing Student Athlete Performance Center construction.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Two separate portions of Bobby Dodd Way will be partially closed for ongoing Student Athlete Performance Center construction."}],"uid":"35028","created_gmt":"2024-07-15 03:16:03","changed_gmt":"2024-08-02 19:45:02","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-07-14T00:00:00-04:00","iso_date":"2024-07-14T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"674345":{"id":"674345","type":"image","title":"2024-07-02 Road Closure Crane Demob  Water  Storm Utility Taps_Page_2.jpg","body":null,"created":"1721013902","gmt_created":"2024-07-15 03:25:02","changed":"1721013902","gmt_changed":"2024-07-15 03:25:02","alt":"Logistics plan for Bobby Dodd Way closure for crane demobilization and utilities work.","file":{"fid":"257845","name":"2024-07-02 Road Closure Crane Demob  Water  Storm Utility Taps_Page_2.jpg","image_path":"\/sites\/default\/files\/2024\/07\/14\/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_2.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/07\/14\/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_2.jpg","mime":"image\/jpeg","size":195038,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/07\/14\/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_2.jpg?itok=wcyKJsDB"}},"674346":{"id":"674346","type":"image","title":"2024-07-02 Road Closure Crane Demob  Water  Storm Utility Taps_Page_3.jpg","body":null,"created":"1721014009","gmt_created":"2024-07-15 03:26:49","changed":"1721014009","gmt_changed":"2024-07-15 03:26:49","alt":"Logistics for road closure of Bobby Dodd Way for Student Athlete Performance Center construction.","file":{"fid":"257846","name":"2024-07-02 Road Closure Crane Demob  Water  Storm Utility Taps_Page_3.jpg","image_path":"\/sites\/default\/files\/2024\/07\/14\/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_3.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/07\/14\/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_3.jpg","mime":"image\/jpeg","size":177612,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/07\/14\/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_3.jpg?itok=fWBO8dHe"}}},"media_ids":["674345","674346"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"193671","name":"I\u0026S Construction Notices"},{"id":"187097","name":"Facilities Notices"},{"id":"61411","name":"Campus Construction"},{"id":"13283","name":"Bobby Dodd Way"},{"id":"192186","name":"Student Athlete Performance Center"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EHeather Hardie\u003C\/p\u003E\u003Cp\u003ESenior Construction Manager\u003C\/p\u003E\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\u003Cp\u003E470-553-6469\u003C\/p\u003E\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E","format":"limited_html"}],"email":["Heather.Hardie@faciilties.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}