{"675122":{"#nid":"675122","#data":{"type":"news","title":"Ferst Drive and Tech Parkway Water Line Extension Efforts Begin June 18","body":[{"value":"\u003Cdiv\u003EBeginning Tuesday June 18, the contractor will begin installing lateral lines from the new water main on Tech Parkway across Ferst Drive to the existing meter vault location as depicted in the attached traffic plan.\u0026nbsp;\u003C\/div\u003E\u003Cdiv\u003E\u0026nbsp;\u003C\/div\u003E\u003Cdiv\u003ETraffic will be directed around work areas during construction activities then trenches will be plated for off work hours. Expect minor delays as you travel through this area.\u003C\/div\u003E\u003Cdiv\u003E\u0026nbsp;\u003C\/div\u003E\u003Cdiv\u003EThe duration of this work is estimated to be 5-7 days. \u0026nbsp;Thank you for your understanding as we improve our campus utility infrastructure.\u003C\/div\u003E\u003Cdiv\u003E\u003Cbr\u003E\u0026nbsp;\u003C\/div\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003ELateral lines from the new water main on Tech Parkway will be installed during this time.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Lateral lines from the new water main on Tech Parkway will be installed during this time."}],"uid":"35028","created_gmt":"2024-06-17 16:21:49","changed_gmt":"2024-06-17 16:25:50","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-06-17T00:00:00-04:00","iso_date":"2024-06-17T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"674193":{"id":"674193","type":"image","title":"FERST DRIVE RUSH WATER CONNECTIONS_june2024jpg.jpg","body":null,"created":"1718641455","gmt_created":"2024-06-17 16:24:15","changed":"1718641455","gmt_changed":"2024-06-17 16:24:15","alt":"Logistics map of Ferst Drive lateral water line installation","file":{"fid":"257675","name":"FERST DRIVE RUSH WATER CONNECTIONS_june2024jpg.jpg","image_path":"\/sites\/default\/files\/2024\/06\/17\/FERST%20DRIVE%20RUSH%20WATER%20CONNECTIONS_june2024jpg.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/06\/17\/FERST%20DRIVE%20RUSH%20WATER%20CONNECTIONS_june2024jpg.jpg","mime":"image\/jpeg","size":1193107,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/06\/17\/FERST%20DRIVE%20RUSH%20WATER%20CONNECTIONS_june2024jpg.jpg?itok=m1RxdIfl"}}},"media_ids":["674193"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"193671","name":"I\u0026S Construction Notices"},{"id":"193358","name":"Ferst Drive Connectivity Plan"},{"id":"170172","name":"tech parkway"},{"id":"61411","name":"Campus Construction"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EJeremiah Young\u003C\/strong\u003E\u003C\/p\u003E\u003Cp\u003ELandscape Project Manager\u003C\/p\u003E\u003Cp\u003EPlanning Design \u0026amp; Construction | Infrastructure \u0026amp; Sustainability\u0026nbsp;\u003C\/p\u003E\u003Cp\u003E404-565-3449\u003C\/p\u003E\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E","format":"limited_html"}],"email":["jerry.young@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}