{"675011":{"#nid":"675011","#data":{"type":"news","title":"Chilled Water System Improvements Along Bobby Dodd Way Ongoing Through August","body":[{"value":"\u003Cp\u003EThe campus chilled water system requires periodic maintenance. Work is underway to replace the water main between the Stephen C. Hall Building and Crosland Tower and install two new chilled water lines. This work requires closure of the westbound lane of Bobby Dodd Way. ADA walkways are available to allow access to buildings.\u003C\/p\u003E\u003Cp\u003EPlease pardon our progress as we make these important infrastructure upgrades.\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EImprovements to the campus chilled water system impact a portion of Bobby Dodd Way through August.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"Improvements to the campus chilled water system impact a portion of Bobby Dodd Way through August."}],"uid":"35028","created_gmt":"2024-06-05 18:20:05","changed_gmt":"2024-06-05 21:27:05","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-06-05T00:00:00-04:00","iso_date":"2024-06-05T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"674145":{"id":"674145","type":"image","title":"Chilled Water System Improvements Along Bobby Dodd May - August 2024","body":null,"created":"1717611711","gmt_created":"2024-06-05 18:21:51","changed":"1717611828","gmt_changed":"2024-06-05 18:23:48","alt":"Logistics map for chilled water system improvements summer 2024.","file":{"fid":"257621","name":"Chilled Water Bobby Dodd CHW Main- Phase Map (2).jpg","image_path":"\/sites\/default\/files\/2024\/06\/05\/Chilled%20Water%20Bobby%20Dodd%20CHW%20Main-%20Phase%20Map%20%282%29.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/06\/05\/Chilled%20Water%20Bobby%20Dodd%20CHW%20Main-%20Phase%20Map%20%282%29.jpg","mime":"image\/jpeg","size":428297,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/06\/05\/Chilled%20Water%20Bobby%20Dodd%20CHW%20Main-%20Phase%20Map%20%282%29.jpg?itok=WIKZA87c"}}},"media_ids":["674145"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"193671","name":"I\u0026S Construction Notices"},{"id":"143221","name":"Facilities-Notices"},{"id":"192925","name":"Chilled Water project"},{"id":"61411","name":"Campus Construction"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EWilliam Varnado\u003C\/p\u003E\u003Cp\u003EAssociate Director\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EUtilities Maintenance\u003C\/p\u003E\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\u003Cp\u003E404-825-6282\u003C\/p\u003E\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E","format":"limited_html"}],"email":["william.varnado@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}