{"674892":{"#nid":"674892","#data":{"type":"news","title":"Watershed Improvements Temporarily Close a Section of Sidewalk and Bike Path along Tech Parkway","body":[{"value":"\u003Cp\u003EBeginning May 28, a section of the sidewalk and bike path along Tech Parkway will be closed for watershed improvements. The impacted section is located near the new waste management and landscape service yard site. A new storm drain will be tied into the existing system and a new road (path) connection from 3rd St. to Techwood Pkwy will be installed. Sidewalk closed signs and proper fencing and barricades will be in place as seen in the attached logistics map. The sidewalk across the street can be utilized as an alternate during this down time. This closure is expected to last approximately three weeks.\u0026nbsp;\u003C\/p\u003E\u003Cp\u003EWe appreciate your patience as we make these campus improvements. Please reach out if you have any questions or concerns.\u003C\/p\u003E","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe sidewalk and bike lane closures will last approximately three weeks.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":[{"value":"The sidewalk and bike lane closures will last approximately three weeks."}],"uid":"35028","created_gmt":"2024-05-24 16:41:02","changed_gmt":"2024-05-24 18:47:52","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-05-24T00:00:00-04:00","iso_date":"2024-05-24T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"674071":{"id":"674071","type":"image","title":"Bike-path-closureWM LS Service Temp Fence Logistics_Page_2.jpg","body":null,"created":"1716568874","gmt_created":"2024-05-24 16:41:14","changed":"1716568874","gmt_changed":"2024-05-24 16:41:14","alt":"Logistics plan for bike path and sidewalk closure along Tech Parkway.","file":{"fid":"257540","name":"Bike-path-closureWM LS Service Temp Fence Logistics_Page_2.jpg","image_path":"\/sites\/default\/files\/2024\/05\/24\/Bike-path-closureWM%20LS%20Service%20Temp%20Fence%20Logistics_Page_2.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/05\/24\/Bike-path-closureWM%20LS%20Service%20Temp%20Fence%20Logistics_Page_2.jpg","mime":"image\/jpeg","size":188218,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/05\/24\/Bike-path-closureWM%20LS%20Service%20Temp%20Fence%20Logistics_Page_2.jpg?itok=QR0lYWoF"}}},"media_ids":["674071"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"193671","name":"I\u0026S Construction Notices"},{"id":"143221","name":"Facilities-Notices"},{"id":"193358","name":"Ferst Drive Connectivity Plan"},{"id":"61411","name":"Campus Construction"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EChris B. Williams\u003C\/p\u003E\u003Cp\u003EProject Manager\u003C\/p\u003E\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\u003Cp\u003E470-553-7197\u003C\/p\u003E","format":"limited_html"}],"email":["cbwilliams@gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}