{"674489":{"#nid":"674489","#data":{"type":"news","title":"AE Hanger Construction Affects NARA Campus Parking","body":[{"value":"\u003Cp\u003EBeginning May 17th\u0026nbsp;the parking lot adjacent to the Tech Way Building \/ Loading Area and all parking around the Tech Way Circle will be closed due to the construction of the AE Hanger Building and site utilities.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThirty-six (36) alternate parking spaces will be available on the east end of the NARA campus for the duration of construction including additional ADA spaces.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EADA and pedestrian access to the Tech Way Building Loading Area and Facilities has been constructed and will be available for use on Monday May 17.\u003C\/p\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EBeginning May 17, parking around the Tech Way Circle will be closed due to the construction of the AE Hangar Building.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Beginning May 17, parking around the Tech Way Circle will be closed due to the construction of the AE Hangar Building."}],"uid":"35028","created_gmt":"2024-05-02 15:48:53","changed_gmt":"2024-05-02 15:55:31","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-05-02T00:00:00-04:00","iso_date":"2024-05-02T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"673926":{"id":"673926","type":"image","title":"AE Hangar Construction Affects Parking at NARA","body":null,"created":"1714665058","gmt_created":"2024-05-02 15:50:58","changed":"1714665256","gmt_changed":"2024-05-02 15:54:16","alt":"Image of AE Hangar construction and parking logistics.","file":{"fid":"257382","name":"AE_hangar_may2024.png","image_path":"\/sites\/default\/files\/2024\/05\/02\/AE_hangar_may2024.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/05\/02\/AE_hangar_may2024.png","mime":"image\/png","size":1461022,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/05\/02\/AE_hangar_may2024.png?itok=oYQZlP9-"}}},"media_ids":["673926"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"193671","name":"I\u0026S Construction Notices"},{"id":"174576","name":"North Avenue Research Area"},{"id":"10010","name":"aeronautical engineering"},{"id":"61411","name":"Campus Construction"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EMichael (Micky) Boeckl, RA\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design, and Construction | Infrastructure and Sustainability\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-295-1757\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["Michael.Boeckl@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}