{"674276":{"#nid":"674276","#data":{"type":"news","title":"East Campus Streetscape Improvements Continue Along Techwood Drive","body":[{"value":"\u003Cp\u003EThe current phase of streetscape construction is ahead of schedule for Area A2 and sidewalks will open to pedestrians this weekend. Fencing will now be shifted to the opposite side of the street and barricades added in the roadway for protection from the incomplete intermediate bike lanes that will be paved at a later date.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EArea G, between Bobby Dodd Way and 4th Street sidewalks and curbs will begin construction with an estimated completion date for this area of May 7. Vehicular traffic north and southbound on Techwood Drive will be designated with centerline and barriers. Please see the attached traffic and sequencing plan for reference.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EIf you have any questions or concerns, reach out to Jerry Young, Landscape Project Manager, 404-565-349.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe phased improvement project is moving along ahead of schedule.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"The phased improvement project is moving along ahead of schedule."}],"uid":"35028","created_gmt":"2024-04-19 15:02:25","changed_gmt":"2024-04-19 15:39:30","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-04-19T00:00:00-04:00","iso_date":"2024-04-19T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"673767":{"id":"673767","type":"image","title":"GT East Campus Phase 2G NEWjpg.jpg","body":null,"created":"1713540799","gmt_created":"2024-04-19 15:33:19","changed":"1713540799","gmt_changed":"2024-04-19 15:33:19","alt":"image of logistics plan for Phase 2G of East Campus Streetscape project","file":{"fid":"257203","name":"GT East Campus Phase 2G NEWjpg.jpg","image_path":"\/sites\/default\/files\/2024\/04\/19\/GT%20East%20Campus%20Phase%202G%20NEWjpg.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/04\/19\/GT%20East%20Campus%20Phase%202G%20NEWjpg.jpg","mime":"image\/jpeg","size":1153406,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/04\/19\/GT%20East%20Campus%20Phase%202G%20NEWjpg.jpg?itok=_Pe60fkT"}},"673765":{"id":"673765","type":"image","title":"GT East Campus Phase 2 Sequencing Plan 4.15.24jpg.jpg","body":null,"created":"1713540674","gmt_created":"2024-04-19 15:31:14","changed":"1713540674","gmt_changed":"2024-04-19 15:31:14","alt":"image of logistics plan for Phase 2 Sequence East Campus Streetscape","file":{"fid":"257201","name":"GT East Campus Phase 2 Sequencing Plan 4.15.24jpg.jpg","image_path":"\/sites\/default\/files\/2024\/04\/19\/GT%20East%20Campus%20Phase%202%20Sequencing%20Plan%204.15.24jpg.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/04\/19\/GT%20East%20Campus%20Phase%202%20Sequencing%20Plan%204.15.24jpg.jpg","mime":"image\/jpeg","size":376536,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/04\/19\/GT%20East%20Campus%20Phase%202%20Sequencing%20Plan%204.15.24jpg.jpg?itok=bcoC9fal"}}},"media_ids":["673767","673765"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"192184","name":"East Campus Streetscape"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EJerry Young\u003C\/p\u003E\r\n\r\n\u003Cp\u003ELandscape Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design, and Construction | Infrastructure and Sustainability\u003C\/p\u003E\r\n\r\n\u003Cp\u003E404-565-3449\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["jerry.young@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}