{"674034":{"#nid":"674034","#data":{"type":"news","title":"Ferst Drive Connectivity Plan Necessitates Traffic Changes","body":[{"value":"\u003Cp\u003EBeginning Monday, April 8, the Ferst Drive Connectivity Plan enters phase two, which necessitates a traffic detour to accommodate further infrastructure improvements in the area. The section of Tech Parkway from Means Street\/Regents Drive to the John Lewis Student Center will be closed to vehicular and pedestrian traffic in both directions until late summer.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EVehicular and pedestrian traffic will be diverted from this section of Tech Parkway and allowed to travel along Ferst Drive before reentry onto Tech Parkway. Detour signs will be placed in the area to aid traffic flow.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EFor more information on campus improvement projects, visit \u003Ca href=\u0022https:\/\/facilities.gatech.edu\/exterior-projects\u0022\u003Efacilities.gatech.edu\/exterior-projects\u003C\/a\u003E.\u003C\/p\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EPhase 2 of this campus improvement project begins Monday, April 8.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Phase 2 of this campus improvement project begins Monday, April 8."}],"uid":"35028","created_gmt":"2024-04-05 20:50:54","changed_gmt":"2024-04-05 21:04:21","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-04-05T00:00:00-04:00","iso_date":"2024-04-05T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"673643":{"id":"673643","type":"image","title":"Ferst Drive Connectivity Render-Publish (1) (1).jpg","body":"\u003Cp\u003ERendering of the reimagined Ferst Drive and Tech Parkway near the John C. Lewis Student Center.\u003C\/p\u003E\r\n","created":"1712350713","gmt_created":"2024-04-05 20:58:33","changed":"1712350713","gmt_changed":"2024-04-05 20:58:33","alt":"image of rendering of reimagined Ferst Drive and Tech Parkway near the John C. Lewis Student Center","file":{"fid":"257064","name":"Ferst Drive Connectivity Render-Publish (1) (1).jpg","image_path":"\/sites\/default\/files\/2024\/04\/05\/Ferst%20Drive%20Connectivity%20Render-Publish%20%281%29%20%281%29.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/04\/05\/Ferst%20Drive%20Connectivity%20Render-Publish%20%281%29%20%281%29.jpg","mime":"image\/jpeg","size":292523,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/04\/05\/Ferst%20Drive%20Connectivity%20Render-Publish%20%281%29%20%281%29.jpg?itok=V9fT0dyS"}},"673644":{"id":"673644","type":"image","title":"Ferst Drive Phase 2 Detour Route (004) (2) (1).jpg","body":"\u003Cp\u003EDetour route for Ferst Drive Connectivity construction project.\u003C\/p\u003E\r\n","created":"1712350906","gmt_created":"2024-04-05 21:01:46","changed":"1712350906","gmt_changed":"2024-04-05 21:01:46","alt":"image of detour route for Ferst Drive Connectivity construction","file":{"fid":"257065","name":"Ferst Drive Phase 2 Detour Route (004) (2) (1).jpg","image_path":"\/sites\/default\/files\/2024\/04\/05\/Ferst%20Drive%20Phase%202%20Detour%20Route%20%28004%29%20%282%29%20%281%29.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/04\/05\/Ferst%20Drive%20Phase%202%20Detour%20Route%20%28004%29%20%282%29%20%281%29.jpg","mime":"image\/jpeg","size":5688507,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/04\/05\/Ferst%20Drive%20Phase%202%20Detour%20Route%20%28004%29%20%282%29%20%281%29.jpg?itok=9Oxks3ww"}}},"media_ids":["673643","673644"],"groups":[{"id":"383831","name":"Facilities Management"},{"id":"1214","name":"News Room"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"35921","name":"Facilities Management"},{"id":"193358","name":"Ferst Drive Connectivity Plan"},{"id":"170172","name":"tech parkway"},{"id":"61411","name":"Campus Construction"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EJerry Young\u003C\/p\u003E\r\n\r\n\u003Cp\u003ELandscape Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\r\n\r\n\u003Cp\u003E404-565-3449\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["jerry.young@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}