{"673518":{"#nid":"673518","#data":{"type":"news","title":"Planned Electrical Outage for Van Leer Building March 16 - 21","body":[{"value":"\u003Cp\u003ERequired electrical work at Van Leer will begin March 16 at 7:00 a.m. Power will be restored to specific areas throughout the week (see details below).\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003E4kV motors lab \u003C\/strong\u003E- restored Monday Noon 3\/18.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ESWB loads\u003C\/strong\u003E - restored Monday Noon 3\/18.\u003C\/p\u003E\r\n\r\n\u003Cul type=\u0022disc\u0022\u003E\r\n\t\u003Cli\u003EInterdisciplinary Design Commons Maker Space (old Rotunda). All floors.\u003C\/li\u003E\r\n\t\u003Cli\u003ELighting for the west half of building- 1st-4th\u0026nbsp;floors.\u003C\/li\u003E\r\n\t\u003Cli\u003ELighting for the 5th\u0026nbsp;floor.\u003C\/li\u003E\r\n\t\u003Cli\u003EW139 Structural and Research Lab.\u003C\/li\u003E\r\n\t\u003Cli\u003EW115 Lab power.\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ENEA loads\u0026nbsp;\u003C\/strong\u003E- restored Tuesday Morning 3\/19.\u003C\/p\u003E\r\n\r\n\u003Cul type=\u0022disc\u0022\u003E\r\n\t\u003Cli\u003ELighting for the east half of building- 1st-4th\u0026nbsp;floors.\u003C\/li\u003E\r\n\t\u003Cli\u003ECleanroom receptacles and equipment.\u003C\/li\u003E\r\n\t\u003Cli\u003ECleanroom lighting, HVAC, and exhaust fans\u003C\/li\u003E\r\n\t\u003Cli\u003ERoom E396E Spectra-Physics DC Power Supply (not in use).\u003C\/li\u003E\r\n\t\u003Cli\u003ERoom C248 furniture receptacles.\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ENWBH loads\u0026nbsp;\u003C\/strong\u003E- restored Tuesday Morning 3\/19.\u003C\/p\u003E\r\n\r\n\u003Cul type=\u0022disc\u0022\u003E\r\n\t\u003Cli\u003EDC generators and W139 Lab.\u003C\/li\u003E\r\n\t\u003Cli\u003EMechanical systems including air-handling units, chilled water, and condensate pumps.\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cul type=\u0022disc\u0022\u003E\r\n\t\u003Cli\u003EEmergency egress lighting (can be supplied by the generator)\u003C\/li\u003E\r\n\t\u003Cli\u003EElevator.\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ENWBL loads\u003C\/strong\u003E - restored Wednesday Morning 3\/20.\u003C\/p\u003E\r\n\r\n\u003Cul type=\u0022disc\u0022\u003E\r\n\t\u003Cli\u003EMain Communications Room W237.\u003C\/li\u003E\r\n\t\u003Cli\u003EW115 Lab power.\u003C\/li\u003E\r\n\t\u003Cli\u003EW116A Shop power.\u003C\/li\u003E\r\n\t\u003Cli\u003EW139 Structural and Research Lab\u003C\/li\u003E\r\n\t\u003Cli\u003ESW Communications Rooms- 2nd\u0026nbsp;- 4th\u0026nbsp;floors.\u003C\/li\u003E\r\n\t\u003Cli\u003EReceptacles for west half of building- 2nd\u0026nbsp;- 4th\u0026nbsp;floor.\u003C\/li\u003E\r\n\t\u003Cli\u003EReceptacles for the 5th floor.\u003C\/li\u003E\r\n\t\u003Cli\u003EElevator machine room air-conditioning.\u003C\/li\u003E\r\n\t\u003Cli\u003ERoof Power\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ESEA loads\u0026nbsp;\u003C\/strong\u003E- restored Thursday Noon 3\/21.\u003C\/p\u003E\r\n\r\n\u003Cul type=\u0022disc\u0022\u003E\r\n\t\u003Cli\u003ECleanroom receptacles and equipment.\u003C\/li\u003E\r\n\t\u003Cli\u003ECleanroom office area receptacles- west side.\u003C\/li\u003E\r\n\t\u003Cli\u003EOffice receptacles- 1st\u0026nbsp;floor east side.\u003C\/li\u003E\r\n\t\u003Cli\u003EMechanical Room- JCI controls, receptacles, and power for 120V pumps.\u003C\/li\u003E\r\n\t\u003Cli\u003EElevator cab lights.\u003C\/li\u003E\r\n\t\u003Cli\u003ESE Communications Rooms- 2nd\u0026nbsp;- 4th\u0026nbsp;floors.\u003C\/li\u003E\r\n\t\u003Cli\u003EReceptacles for east half of building- 2nd\u0026nbsp;- 4th\u0026nbsp;floors.\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EImprovements to the electrical system in the Van Leer Building require a planned outage.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Improvements to the electrical system in the Van Leer Building require a planned outage."}],"uid":"35028","created_gmt":"2024-03-13 22:07:28","changed_gmt":"2024-03-13 22:07:27","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-03-13T00:00:00-04:00","iso_date":"2024-03-13T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"192715","name":"Van Leer Building"},{"id":"193568","name":"Planned Electrical Outage"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EMitchell Shelton\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-351-7746\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["mitchell.shelton@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}