{"673437":{"#nid":"673437","#data":{"type":"news","title":"Infrastructure Improvements Affect Bobby Dodd Way at Crosland Tower March 18 - August","body":[{"value":"\u003Cp\u003EAs part of the ongoing campus infrastructure upgrades, the sidewalk and a portion of Bobby Dodd Way NW will be closed beginning March 18 and last for approximately 5 months. This project includes the relocation of a gas line and the demolition of the existing steam vault (G9-10), followed by the installation of a larger steam vault.\u003C\/p\u003E\r\n\r\n\u003Cp\u003ESignage will be in place redirecting all traffic as needed.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe Fire Marshal\u2019s office and GTPD has signed off on the proposed logistics plan. All handicap access to Crosland Tower will be maintained. The FDC\u2019s located in the east alley will also have access in the event of a fire emergency.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThank you for your assistance and be mindful of all safety rules around the construction site.\u003C\/p\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EOngoing campus infrastructure upgrades will affect the sidewalk and a portion of Bobby Dodd Way.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Ongoing campus infrastructure upgrades will affect the sidewalk and a portion of Bobby Dodd Way."}],"uid":"35028","created_gmt":"2024-03-09 21:25:07","changed_gmt":"2024-03-09 21:25:07","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-03-09T00:00:00-05:00","iso_date":"2024-03-09T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"673354":{"id":"673354","type":"image","title":"Bobby Dodd Way at Crosland Tower Construction Impacts","body":"\u003Cp\u003ELogistics map indicated construction impact to Bobby Dodd Way at Crosland Tower for relocation of a gas line and demolition of a steam vault.\u003C\/p\u003E\r\n","created":"1710019070","gmt_created":"2024-03-09 21:17:50","changed":"1710019070","gmt_changed":"2024-03-09 21:17:50","alt":"Logistics for Bobby Dodd Way construction March 2024.","file":{"fid":"256739","name":"bobby_dodd_construction_gas_line_steam_vault_march2024.jpg","image_path":"\/sites\/default\/files\/2024\/03\/09\/bobby_dodd_construction_gas_line_steam_vault_march2024.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/03\/09\/bobby_dodd_construction_gas_line_steam_vault_march2024.jpg","mime":"image\/jpeg","size":53675,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/03\/09\/bobby_dodd_construction_gas_line_steam_vault_march2024.jpg?itok=DAwi3-MS"}}},"media_ids":["673354"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"13283","name":"Bobby Dodd Way"},{"id":"193560","name":"steam vault"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EBrian Doles\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager - Special Projects\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-854-8262\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["brian.doles@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}