{"672690":{"#nid":"672690","#data":{"type":"news","title":"Construction Begins for Celebrating Women at Georgia Tech Installation Near the Student Center Pathways","body":[{"value":"\u003Cp\u003EBeginning February 19, 2024, construction and infrastructure work will begin for the Celebrating Women at Georgia Tech installation.\u0026nbsp; Normal work hours will be Monday - Friday 6:30 a.m. to 5:30 p.m.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction fencing will be installed around the site perimeter and a section of the sidewalk with direct paths to the John Lewis Student Center and the Ferst Center for the Arts will be temporary closed. All pedestrian traffic will be re-routed around these two buildings to the routes shown in the logistics plan below.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThis project installation is expected to be complete in early October 2024. Click \u003Ca href=\u0022https:\/\/facilities.gatech.edu\/exterior-projects\u0022\u003Ehere\u003C\/a\u003E for more information.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe Celebrating Women installation will illuminate the history of women at Georgia Tech, including staff, faculty, and alumnae. Fencing will be installed around the installation site.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Fencing installed near the Student Center for the construction of the Women\u0027s Walk."}],"uid":"35028","created_gmt":"2024-02-01 22:48:52","changed_gmt":"2024-02-27 17:16:44","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2024-02-01T00:00:00-05:00","iso_date":"2024-02-01T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"672937":{"id":"672937","type":"image","title":"Campus Impacts for Construction of Women\u0027s Walk","body":"\u003Cp\u003Eimage depicting fencing and detours on campus for the Women\u0027s Walk installation\u003C\/p\u003E\r\n","created":"1706826981","gmt_created":"2024-02-01 22:36:21","changed":"1707152184","gmt_changed":"2024-02-05 16:56:24","alt":"image depicting fencing and detours on campus for the Women\u0027s Walk installation","file":{"fid":"256269","name":"womens_walk_fencing_logistics_feb2024.jpg","image_path":"\/sites\/default\/files\/2024\/02\/01\/womens_walk_fencing_logistics_feb2024.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2024\/02\/01\/womens_walk_fencing_logistics_feb2024.jpg","mime":"image\/jpeg","size":106712,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2024\/02\/01\/womens_walk_fencing_logistics_feb2024.jpg?itok=ifVl_uw7"}}},"media_ids":["672937"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"193481","name":"Women\u0027s Walk"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003ECarla Barbour, PMP, LEED AP\u003C\/p\u003E\r\n\r\n\u003Cp\u003ESr. Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design, and Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003EInfrastructure and Sustainability\u003C\/p\u003E\r\n\r\n\u003Cp\u003E404-242-7351\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["carla.barbour@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}