{"670050":{"#nid":"670050","#data":{"type":"news","title":"West Campus Electrical Expansion Project Closes Curran Street October 2 through Mid-December","body":[{"value":"\u003Cp\u003EBeginning October 2, phase 1 of a 6-phase project will commence on West Campus. Phase 1 will consist of work along the center\/east side of Curran Street between 8th\u0026nbsp;and 9th\u0026nbsp;streets. Construction fencing will be in place blocking off access to Curran Street. Traffic will be rerouted through the Woodruff Parking lot as seen on the logistics Plan. Parking in this lot will still be useable. The sidewalk on the west side of Curran Street will still be accessible for pedestrian traffic. Phase 1 duration is ~10 weeks (December 7th). There will be an officer from GTPD on site on Monday, October 2 to help facilitate the detour and confirm all proper barricades and signage is in place for this 10 week project.\u003C\/p\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003ECurran Street will be closed from October 2 through mid-December with traffic detoured through the Woodruff Parking lot.\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Electrical expansion work will affect the east side of Curran Street between 8th and 9th street. "}],"uid":"35028","created_gmt":"2023-09-29 19:50:55","changed_gmt":"2023-09-29 19:53:37","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2023-09-29T00:00:00-04:00","iso_date":"2023-09-29T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"671907":{"id":"671907","type":"image","title":"West Campus Electrical Expansion Project Closes Curran Street October 2 through Mid-December","body":null,"created":"1696016421","gmt_created":"2023-09-29 19:40:21","changed":"1696016721","gmt_changed":"2023-09-29 19:45:21","alt":"Logistics plan for electrical expansion causing closure of Curran Street October 2 through Mid-December","file":{"fid":"255059","name":"Loop B Phase 1 Curran St..png","image_path":"\/sites\/default\/files\/2023\/09\/29\/Loop%20B%20Phase%201%20Curran%20St..png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2023\/09\/29\/Loop%20B%20Phase%201%20Curran%20St..png","mime":"image\/png","size":1546695,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2023\/09\/29\/Loop%20B%20Phase%201%20Curran%20St..png?itok=nkCq2wdS"}}},"media_ids":["671907"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"193112","name":"electrical expansion project"},{"id":"193113","name":"Curran Street"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EChris B. Williams\u003C\/p\u003E\r\n\r\n\u003Cp\u003EProject Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPlanning, Design, and Construction | Infrastructure and Sustainability\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-553-7197\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["cbwilliams@gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}