{"669493":{"#nid":"669493","#data":{"type":"news","title":"Northside Drive and 10th Street Pylon Signage Replacement Work Begins","body":[{"value":"\u003Cp\u003EBeginning Monday 9\/11 fencing and erosion control for the Northside Dr. \u0026amp; 10th St. Pylon Signage project will begin\u0026nbsp;along the southeast corner of Northside Drive and 10th\u0026nbsp;Street. This site preparation will be followed by demolition and grading of the area\u0026nbsp;where the sidewalk and lanes will be closed along this location. The Planning, Design and Construction department is working closely with the Georgia Department of Transportation and the Atlanta Department of Transporation to coordinate this work.\u0026nbsp;The project is anticipated to run until\u0026nbsp;2\/22\/24.\u003C\/p\u003E\r\n","summary":"","format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EBeginning Monday September 11, work will begin for the Northside Drive and 10th Street pylon signage project.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Fencing and erosion control will begin September 11 in preparation for site work."}],"uid":"35028","created_gmt":"2023-09-06 19:10:35","changed_gmt":"2023-09-06 19:11:03","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2023-09-06T00:00:00-04:00","iso_date":"2023-09-06T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"671619":{"id":"671619","type":"image","title":"Logistics Plan for Northside Dr. and 10th Street pylon signage replacement","body":null,"created":"1694026726","gmt_created":"2023-09-06 18:58:46","changed":"1694026901","gmt_changed":"2023-09-06 19:01:41","alt":"logistics plan for replacing logo monument (pylons) on Northside and 10th Street","file":{"fid":"254713","name":"monuments_northside_tenth.png","image_path":"\/sites\/default\/files\/2023\/09\/06\/monuments_northside_tenth.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/2023\/09\/06\/monuments_northside_tenth.png","mime":"image\/png","size":655347,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/2023\/09\/06\/monuments_northside_tenth.png?itok=attgXqrA"}}},"media_ids":["671619"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"42291","name":"northside drive"},{"id":"14938","name":"10th Street"},{"id":"193023","name":"pylon signage"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EBlake Baklini\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager \/ Planning, Design, and Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cem\u003Ea department of Infrastructure and Sustainability\u003C\/em\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe Georgia Institute of Technology\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["blake.baklini@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}