{"663743":{"#nid":"663743","#data":{"type":"news","title":"East Campus Road Closure - 3rd Street and Williams Street - Begins Dec. 19","body":[{"value":"\u003Cp\u003EUpcoming campus infrastructure improvements will result in traffic impacts to 3\u003Csup\u003Erd\u003C\/sup\u003E\u0026nbsp;St. and Williams St. beginning\u0026nbsp;\u003Cstrong\u003EDec. 19\u003C\/strong\u003E.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe installation of a new electrical duct bank serving\u0026nbsp;the Area 2 residence halls (Hopkins\/Hanson\/Perry\/Matheson\/Field)\u0026nbsp;will begin Dec. 19\u0026nbsp;and continue into the start of spring semester.\u0026nbsp; The installation under the roadway of 3\u003Csup\u003Erd\u003C\/sup\u003E\u0026nbsp;St. will require\u0026nbsp;a\u0026nbsp;\u003Cem\u003Efull closure\u003C\/em\u003E\u0026nbsp;of 3\u003Csup\u003Erd\u003C\/sup\u003E\u0026nbsp;St. (east of Techwood Dr.\u0026nbsp;and Williams St.) up to where it intersects with the North Ave. off-ramp.\u0026nbsp;The closure will occur daily from\u0026nbsp;\u003Cstrong\u003E9:00 a.m. to 4:00 p.m\u003C\/strong\u003E.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe associated\u0026nbsp;maps indicates the\u0026nbsp;approximate path (red line) of the new electrical duct bank.\u0026nbsp;Attached are\u0026nbsp;detailed phasing images\u0026nbsp;showing the area when:\u003C\/p\u003E\r\n\r\n\u003Cp\u003Ea.\u0026nbsp; \u0026nbsp; \u0026nbsp; The road is closed 9:00 a.m. to 4:00 p.m.\u003C\/p\u003E\r\n\r\n\u003Cp\u003Eb.\u0026nbsp; \u0026nbsp; \u0026nbsp; The road is open 4:01 p.m. to 8:59 a.m.\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EA replacement of electrical infrastructure serving the Area 2 residence halls (Hopkins\/Hanson\/Perry\/Matheson\/Field) will\u0026nbsp;begin Dec. 19\u0026nbsp;and continue into the start of the spring semester. This infrastructure update will require a temporary road closure.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":" Upcoming construction work will result in road closure beginning Dec. 19. "}],"uid":"35028","created_gmt":"2022-12-08 17:25:45","changed_gmt":"2022-12-08 17:42:04","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2022-12-08T00:00:00-05:00","iso_date":"2022-12-08T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"663742":{"id":"663742","type":"image","title":"East Campus Road Closure Dec. 19 (3rd St. and Williams St.)","body":null,"created":"1670519340","gmt_created":"2022-12-08 17:09:00","changed":"1670519340","gmt_changed":"2022-12-08 17:09:00","alt":"map of logistics for road closure to install electrical duct bank 3rd St. and Williams St.","file":{"fid":"251235","name":"electrical_duct_bank_dec22.png","image_path":"\/sites\/default\/files\/images\/electrical_duct_bank_dec22.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/electrical_duct_bank_dec22.png","mime":"image\/png","size":892088,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/electrical_duct_bank_dec22.png?itok=3lMm0p-d"}},"663745":{"id":"663745","type":"image","title":"3rd Street Road Closure - When Road is Closed 9am-4pm","body":null,"created":"1670521061","gmt_created":"2022-12-08 17:37:41","changed":"1670521061","gmt_changed":"2022-12-08 17:37:41","alt":"logistics map road closure","file":{"fid":"251237","name":"3rd St Road Closure_page2_Page_1.jpg","image_path":"\/sites\/default\/files\/images\/3rd%20St%20Road%20Closure_page2_Page_1.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/3rd%20St%20Road%20Closure_page2_Page_1.jpg","mime":"image\/jpeg","size":793526,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/3rd%20St%20Road%20Closure_page2_Page_1.jpg?itok=3woUS3Ju"}},"663746":{"id":"663746","type":"image","title":"3rd Street Road Closure - When Road is Open","body":null,"created":"1670521177","gmt_created":"2022-12-08 17:39:37","changed":"1670521177","gmt_changed":"2022-12-08 17:39:37","alt":"map of logistics for road closure but when road is open after hours","file":{"fid":"251238","name":"3rd St Road Closure_page2_Page_2.jpg","image_path":"\/sites\/default\/files\/images\/3rd%20St%20Road%20Closure_page2_Page_2.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/3rd%20St%20Road%20Closure_page2_Page_2.jpg","mime":"image\/jpeg","size":767897,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/3rd%20St%20Road%20Closure_page2_Page_2.jpg?itok=kUXV0UlJ"}}},"media_ids":["663742","663745","663746"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"10969","name":"road closure"},{"id":"191724","name":"3rd St."},{"id":"191723","name":"Williams Street"}],"core_research_areas":[],"news_room_topics":[{"id":"71871","name":"Campus and Community"}],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EBrad Morris\u003C\/p\u003E\r\n\r\n\u003Cp\u003EDirector, Capital Projects\u003C\/p\u003E\r\n\r\n\u003Cp\u003EDesign \u0026amp; Construction \/ Campus Services\u003C\/p\u003E\r\n\r\n\u003Cp\u003E678.618.2092\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["Brad.Morris@aux.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}