{"657971":{"#nid":"657971","#data":{"type":"news","title":"Steam Line Replacement Project Impacts Pedestrian Walkways Beginning May 9.","body":[{"value":"\u003Cp\u003EBeginning Monday, May 9, a steam line replacement project will begin on campus. Fencing will be mobilized to enclose a large section of sidewalk between the Boggs Building, Love Manufacturing Building, the Instructional Center Lawn, and the Manufacturing Related Disciplines Complex.\u0026nbsp;The accompanying plan shows the fence line, sidewalk closures, and alternate paths of travel for pedestrians during construction.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EPending weather, the project is expected to be complete in early August. Any delays to the completion date will be reported to the community as needed.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EFor more information, please contact Jennifer Disotell\u0026nbsp;at 470.378.6894 or email at\u0026nbsp;\u003Ca href=\u0022mailto:jdisotell3@gatech.edu\u0022 rel=\u0022noopener noreferrer\u0022 target=\u0022_blank\u0022\u003Ejdisotell3@gatech.edu\u003C\/a\u003E.\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EPedestrian walkways will be impacted between the Boggs Building, Love Manufacturing Building, the IC Lawn, and the Manufacturing Related Disciplines Complex beginning May 9 for a steam replacement project.\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Pedestrian walkways will be impacted between the Boggs Building, Love Manufacturing Building, the IC Lawn, and the Manufacturing Related Disciplines Complex beginning May 9 for a steam replacement project."}],"uid":"35028","created_gmt":"2022-05-04 19:50:08","changed_gmt":"2022-05-06 17:46:30","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2022-05-04T00:00:00-04:00","iso_date":"2022-05-04T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"657972":{"id":"657972","type":"image","title":"Steam Line Replacement Project Fence Mobilization Plan","body":null,"created":"1651694358","gmt_created":"2022-05-04 19:59:18","changed":"1651697790","gmt_changed":"2022-05-04 20:56:30","alt":"map of fencing plan for steam replacement project","file":{"fid":"249411","name":"steam_replacement_v3.png","image_path":"\/sites\/default\/files\/images\/steam_replacement_v3.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/steam_replacement_v3.png","mime":"image\/png","size":531528,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/steam_replacement_v3.png?itok=_4XRi-b1"}}},"media_ids":["657972"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"190539","name":"steam replacement project"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Ca href=\u0022mailto:jdisotell3@gatech.edu\u0022\u003E\u003Cstrong\u003EJennifer Disotell\u003C\/strong\u003E\u003C\/a\u003E\u003Cbr \/\u003E\r\nSpecial Projects Manager\u003Cbr \/\u003E\r\nInfrastructure \u0026amp; Sustainability\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["jennifer.disotell@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}