{"653672":{"#nid":"653672","#data":{"type":"news","title":"Crane Staging Will Close Plant Drive Dec. 20 and Dec. 24","body":[{"value":"\u003Cp\u003EThere will be a\u0026nbsp;\u003Cstrong\u003Eclosure of Plant Drive between the Plant and Daniel \u0026amp; Lyman Hall on Monday, December 20\u003Csup\u003Eth\u003C\/sup\u003E\u0026nbsp;from 7 a.m. to 5 p.m.\u003C\/strong\u003E.\u0026nbsp; Be advised\u0026nbsp;\u003Cstrong\u003Etraffic will be re-routed to\u003C\/strong\u003E\u0026nbsp;the Plant, Lyman and Daniel Hall parking areas via the\u0026nbsp;\u003Cstrong\u003E2\u003Csup\u003End\u003C\/sup\u003E\u0026nbsp;entrance to Plant Drive\u003C\/strong\u003E.\u0026nbsp; Proceed with caution as this is against the normal flow of traffic around the building (although wide enough to accommodate incoming\/outgoing vehicles).\u0026nbsp;\u0026nbsp;A spotter will be posted at the corner rounding North to the section of Plant Drive to the parking lots to slow vehicles down and warn of oncoming traffic. An additional spotter will be placed\u0026nbsp;on Bobby Dodd to direct vehicles to the 2\u003Csup\u003End\u003C\/sup\u003E\u0026nbsp;entrance to Plant Drive.\u003C\/p\u003E\r\n\r\n\u003Cp\u003ENormal access to Plant Drive will resume on December 21\u003Csup\u003Est\u003C\/sup\u003E.\u0026nbsp;\u0026nbsp;\u003Cstrong\u003EA similar shutdown for the crane to demobilize will occur as soon as December 24\u003Csup\u003Eth\u003C\/sup\u003E\u0026nbsp;or as late as Monday, December 27\u003Csup\u003Eth\u003C\/sup\u003E.\u003C\/strong\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThis is Phase I of a project to replace roofing at the Holland Plant. \u0026nbsp;Subsequent phases will follow during the first quarter\u0026nbsp;of 2022.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cbr \/\u003E\r\n\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThere will be a\u0026nbsp;\u003Cstrong\u003Eclosure of Plant Drive between the Plant and Daniel \u0026amp; Lyman Hall on Monday, December 20\u003Csup\u003Eth\u003C\/sup\u003E\u0026nbsp;from 7 a.m. to 5 p.m.\u003C\/strong\u003E.\u0026nbsp; Be advised\u0026nbsp;\u003Cstrong\u003Etraffic will be re-routed to\u003C\/strong\u003E\u0026nbsp;the Plant, Lyman and Daniel Hall parking areas via the\u0026nbsp;\u003Cstrong\u003E2\u003Csup\u003End\u003C\/sup\u003E\u0026nbsp;entrance to Plant Drive\u003C\/strong\u003E.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"There will be a\u00a0closure of Plant Drive between the Plant and Daniel \u0026 Lyman Hall on Monday, December 20th\u00a0from 7 a.m. to 5 p.m."}],"uid":"35028","created_gmt":"2021-12-14 02:12:26","changed_gmt":"2021-12-14 16:33:12","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2021-12-13T00:00:00-05:00","iso_date":"2021-12-13T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"653671":{"id":"653671","type":"image","title":"Holland Plant Roofing Project Logistics Dec. 2021","body":null,"created":"1639447177","gmt_created":"2021-12-14 01:59:37","changed":"1639447177","gmt_changed":"2021-12-14 01:59:37","alt":"map of road closures for crane staging for Holland Plant reroofing project","file":{"fid":"247947","name":"Road Closure Crane Assembly - Holland Plant - Dec2021.jpg","image_path":"\/sites\/default\/files\/images\/Road%20Closure%20Crane%20Assembly%20-%20Holland%20Plant%20-%20Dec2021.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/Road%20Closure%20Crane%20Assembly%20-%20Holland%20Plant%20-%20Dec2021.jpg","mime":"image\/jpeg","size":252003,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Road%20Closure%20Crane%20Assembly%20-%20Holland%20Plant%20-%20Dec2021.jpg?itok=uQgTdAdt"}}},"media_ids":["653671"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"70171","name":"Holland Plant"},{"id":"189522","name":"reroofing project"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EJennifer Disotell\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;Special Projects Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003EInfrastructure \u0026amp; Sustainability \/ Design \u0026amp; Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-378-6894\u003C\/p\u003E\r\n\r\n\u003Cp\u003E151 6th Street NW, Atlanta, GA 30332-0351\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["jennifer.disotell@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}