{"649693":{"#nid":"649693","#data":{"type":"news","title":"City of Atlanta Water Main Installation Impacts Techwood Drive Intermittently Through October","body":[{"value":"\u003Cp\u003EThe City of Atlanta\u0026nbsp;is\u0026nbsp;installing\u0026nbsp;a\u0026nbsp;12-inch\u0026nbsp;water main\u0026nbsp;along\u0026nbsp;Techwood\u0026nbsp;Drive between North Avenue and 3rd\u0026nbsp;Street\/Bobby Dodd Way (adjacent to\u0026nbsp;Bobby Dodd Stadium). The work has paused for the beginning of fall semester but will now resume intermittently\u0026nbsp;through October. During installation, the northbound lane will be closed during normal business hours\u0026nbsp;(approximately 9\u0026nbsp;a.m. -\u0026nbsp;4\u0026nbsp;p.m.)\u0026nbsp;Monday through Friday.\u0026nbsp;The southbound lane will be used to maintain\u0026nbsp;two-way traffic, with traffic controllers, during working hours. Both lanes\u0026nbsp;of\u0026nbsp;Techwood\u0026nbsp;Drive\u0026nbsp;will be open each night.\u0026nbsp;\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe access drives to\u0026nbsp;Brittain\u0026nbsp;Dining Hall\u0026nbsp;and\u0026nbsp;those\u0026nbsp;in between Cloudman and Glenn\u0026nbsp;Residence Halls\u0026nbsp;will\u0026nbsp;remain open. On-street parking in ER51 along\u0026nbsp;Techwood\u0026nbsp;Drive\u0026nbsp;may be limited.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EGeorgia Tech Design \u0026amp; Construction is working closely with the City of Atlanta to ensure campus improvements remain on schedule.\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EWater main installation on Techwood Drive will be ongoing through October 2021.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Water main installation will affect Techwood Drive traffic periodically through October."}],"uid":"35028","created_gmt":"2021-08-16 18:15:18","changed_gmt":"2021-08-16 18:21:15","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2021-08-16T00:00:00-04:00","iso_date":"2021-08-16T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"647960":{"id":"647960","type":"image","title":"Techwood Drive City of Atlanta Water Main installation June 2021","body":null,"created":"1623091041","gmt_created":"2021-06-07 18:37:21","changed":"1623091041","gmt_changed":"2021-06-07 18:37:21","alt":"","file":{"fid":"245970","name":"Techwood Drive Campus Notification June 2021.png","image_path":"\/sites\/default\/files\/images\/Techwood%20Drive%20Campus%20Notification%20June%202021.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/Techwood%20Drive%20Campus%20Notification%20June%202021.png","mime":"image\/png","size":4630199,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Techwood%20Drive%20Campus%20Notification%20June%202021.png?itok=jscrM7td"}}},"media_ids":["647960"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"188001","name":"Techwood Drive"},{"id":"188002","name":"Water Main installation"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Ca href=\u0022mailto:mark.wood@facilities.gatech.edu\u0022\u003EMark Wood\u003C\/a\u003E\u003Cbr \/\u003E\r\nProject Manager\u003Cbr \/\u003E\r\nFacilities Design \u0026amp; Construction\u003C\/p\u003E\r\n","format":"limited_html"}],"email":[],"slides":[],"orientation":[],"userdata":""}}}