{"647954":{"#nid":"647954","#data":{"type":"news","title":"UPDATE: 9th Street Partial Closure 6\/14 - 8\/17 (possibly 8\/23)","body":[{"value":"\u003Cp\u003EThe Paper Tricentennial Chilled Water Project\u0026nbsp;\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThe installation of chilled water piping will begin Monday, June 14 and is expected to continue through Thursday, August 17.\u0026nbsp; Due to changes in the thermal insulation required for the piping, work may continue through August 23. Daily\u0026nbsp;work hours are between 7am and 3:30 pm.\u0026nbsp;Construction activities include saw cutting,\u0026nbsp;removal of asphalt\u0026nbsp;and excavation work for the installation of new chilled water piping.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003EOn Friday June 11,\u0026nbsp;the contractor will restrict access to (8) parking spaces on 9th Street (highlighted in green). The plan is subject to change in case of\u0026nbsp;inclement weather.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EThank you for your patience during this campus improvement.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe installation of chilled water piping will begin Monday, June 14 and is expected to continue through Thursday, August 17.\u0026nbsp; Due to weather delays and changes to the installation of thermal insulation the project may run through 8\/23.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"9th Street Road Closure June 14th - August 17th for chilled water pipe installation"}],"uid":"35028","created_gmt":"2021-06-07 17:54:32","changed_gmt":"2021-08-03 16:01:04","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2021-06-07T00:00:00-04:00","iso_date":"2021-06-07T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"647950":{"id":"647950","type":"image","title":"Paper Tricentennial Chilled Water Project Logistics Plan June 2021","body":null,"created":"1623087704","gmt_created":"2021-06-07 17:41:44","changed":"1623087704","gmt_changed":"2021-06-07 17:41:44","alt":"pic of road closures for paper tri chilled water project","file":{"fid":"245964","name":"Paper Tri chill water piping install june 2021.JPG","image_path":"\/sites\/default\/files\/images\/Paper%20Tri%20chill%20water%20piping%20install%20june%202021.JPG","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/Paper%20Tri%20chill%20water%20piping%20install%20june%202021.JPG","mime":"image\/jpeg","size":63549,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Paper%20Tri%20chill%20water%20piping%20install%20june%202021.JPG?itok=ooTQl4QF"}},"647951":{"id":"647951","type":"image","title":"Paper Tricentennial Chilled Water Project Traffic Flow Plan June 2021","body":null,"created":"1623087816","gmt_created":"2021-06-07 17:43:36","changed":"1623087816","gmt_changed":"2021-06-07 17:43:36","alt":"pic of traffic flow rerouting for Paper Tri chilled water project","file":{"fid":"245965","name":"Paper Tri IPS\u0026T Traffic Rerouting Plan 05032021.png","image_path":"\/sites\/default\/files\/images\/Paper%20Tri%20IPS%26T%20Traffic%20Rerouting%20Plan%2005032021.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/Paper%20Tri%20IPS%26T%20Traffic%20Rerouting%20Plan%2005032021.png","mime":"image\/png","size":2793107,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Paper%20Tri%20IPS%26T%20Traffic%20Rerouting%20Plan%2005032021.png?itok=WI3bk0NP"}}},"media_ids":["647950","647951"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"61411","name":"Campus Construction"},{"id":"66711","name":"Paper Tricentennial Building"},{"id":"187999","name":"chilled water piping"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003EMitchell Shelton\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003EConstruction Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EGeorgia Institute of Technology\u003C\/strong\u003E\u0026nbsp;|\u0026nbsp;Facilities Design \u0026amp; Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003E470-351-7746\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["mitchell.shelton@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}