{"644576":{"#nid":"644576","#data":{"type":"news","title":"Campus Center Construction Impacts March - April 2021","body":[{"value":"\u003Cp\u003ECampus Center construction logistics for March 2021 through April 2021.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EChanges are minimal, however there are\u0026nbsp;modifications to the fence line.\u0026nbsp; The limits of site disturbance have crept slightly, impacting the corner of Tech Green and extending northwards to the W021 parking lot.\u0026nbsp; This work is to connect in with existing pathways and grades.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EGeneral:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Surface Lot 2 and Student Center parking deck remain open for public use.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Heavy construction traffic in this sector of campus.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Normal working hours are Monday - Saturday 6:00 AM \u0026ndash; 5:30 PM.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EPhase II Building Construction:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Construction fencing is installed around perimeter of the site.\u0026nbsp; Wayfinding signage is installed.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E* Construction of the Stamps Commons building continues.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E* Pedestrians to be aware of high truck traffic leaving the loading dock of the existing Wenn building.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E* Build back of the Wenn Student is underway.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003ECampus Center construction logistics for March 2021 through April 2021.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Campus center construction continues."}],"uid":"35028","created_gmt":"2021-02-23 00:55:37","changed_gmt":"2021-02-23 00:55:37","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2021-02-22T00:00:00-05:00","iso_date":"2021-02-22T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"644575":{"id":"644575","type":"image","title":"Campus Center Construction Impacts - March 2021","body":null,"created":"1614041375","gmt_created":"2021-02-23 00:49:35","changed":"1614041375","gmt_changed":"2021-02-23 00:49:35","alt":"map of campus center contruction activity March - April 2021","file":{"fid":"244729","name":"GTCC Construction Logistics Plan Phase 2 - March 2021 - April 2021.png","image_path":"\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20March%202021%20-%20April%202021.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20March%202021%20-%20April%202021.png","mime":"image\/png","size":648130,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20March%202021%20-%20April%202021.png?itok=q4CGuDC1"}}},"media_ids":["644575"],"related_links":[{"url":"http:\/\/www.studentcenter.gatech.edu\/campus-center","title":"Campus Center "}],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"180766","name":"campus center construction"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003ENicolas Palfrey\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003ECapital Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EGeorgia Institute of Technology\u003C\/strong\u003E\u0026nbsp;|\u0026nbsp;Facilities Design \u0026amp; Construction\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Ca href=\u0022tel:470-363-7520\u0022 rel=\u0022noopener noreferrer\u0022 target=\u0022_blank\u0022\u003E470-363-7520\u003C\/a\u003E\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["nicolas.palfrey@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}