{"638769":{"#nid":"638769","#data":{"type":"news","title":"Campus Center Construction Impacts - September 2020","body":[{"value":"\u003Cp\u003E\u003Cstrong\u003EGeneral:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Surface Lot 2 and Student Center parking deck remain open for public use.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Heavy construction traffic in this sector of campus.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Normal working hours are Monday - Saturday 6:00 AM \u0026ndash; 5:30 PM.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EArts Plaza Exterior Work:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Pavers and sidewalk in front and around the Ferst Center Arts Plaza is complete.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Fencing has been modified to open up Ferst Center front doors and the connecting pathway around the Ferst Center for the Arts.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EPhase II Building Construction:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003E*Construction fencing is installed around perimeter of the site.\u0026nbsp; Wayfinding signage is installed.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E* Demolition of the Stamps Commons building is ongoing, the above grade structure has been demolished with only the post office and foundations remaining.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E* Pedestrians to be aware of high truck traffic leaving the loading dock of the existing Wenn building as debris is hauled off site.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E* Interior demolition of the Wenn Student is underway.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EPhase II work is underway for the Campus Center project including demolition and rebuild of Stamps Commons and renovation of the Wenn Student Center.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Construction Impacts for Campus Center during the month of September 2020"}],"uid":"35028","created_gmt":"2020-09-03 18:46:04","changed_gmt":"2020-09-03 18:46:04","author":"cbrim3","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2020-09-03T00:00:00-04:00","iso_date":"2020-09-03T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"638768":{"id":"638768","type":"image","title":"Campus Center Construction Impacts - September 2020","body":null,"created":"1599158304","gmt_created":"2020-09-03 18:38:24","changed":"1599158304","gmt_changed":"2020-09-03 18:38:24","alt":"map of campus center construction activity September 2020","file":{"fid":"242890","name":"GTCC Construction Logistics Plan Phase 2 - September 2020.png","image_path":"\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20September%202020.png","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20September%202020.png","mime":"image\/png","size":1989593,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20September%202020.png?itok=3pf4A-DC"}}},"media_ids":["638768"],"related_links":[{"url":"http:\/\/www.studentcenter.gatech.edu\/campus-center","title":"Campus Center "}],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"143221","name":"Facilities-Notices"},{"id":"176331","name":"Campus Center"},{"id":"61411","name":"Campus Construction"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Cstrong\u003ENicolas Palfrey\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cp\u003ECapital Project Manager\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EGeorgia Institute of Technology\u003C\/strong\u003E\u0026nbsp;|\u0026nbsp;Facilities Design \u0026amp; Construction\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["nicolas.palfrey@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}