{"621427":{"#nid":"621427","#data":{"type":"news","title":"Construction Ramps Up for Phase I of Campus Center Project","body":[{"value":"\u003Cp\u003EThose who work and park in the southwest sector of campus will notice more disruption this week as Phase I of construction begins on the Campus Center project.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EA new configuration of the W02 parking deck will go into effect this week. New equipment has been installed that will enable the deck to now function as both permitted and visitor parking.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EA few things to know about the deck changes:\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EThose who park in W02 will now enter the deck from Ferst Drive.\u003C\/li\u003E\r\n\t\u003Cli\u003EThe new exit will be on the eastern side of the deck where the road connects to the Area 2 visitor lot.\u003C\/li\u003E\r\n\t\u003Cli\u003EThe W03 and Area 3 parking lots are now permanently closed.\u003C\/li\u003E\r\n\t\u003Cli\u003EThe W02 parking deck will now have 80 visitors parking spaces to account for some of the loss of the Area 3 visitors lot.\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003EPermit holders assigned to W02 will not see any changes to their access to the deck, but should be mindful of the new equipment and configuration.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EIn addition to the impact on parking in this area, the pedestrian path between Stamps Health Services and the Smithgall Student Services Building (Flag Building) will be closed during Phase I of construction. Members of the community are encouraged to use the sidewalk along Ferst Drive or paths through the Instructional Center quad as detour options. In the early part of the summer, both the bus stop on the east side of Ferst Drive at the Campus Recreation Center and the path between the Instructional Center Lawn and the Ferst Center for the Arts will change temporarily to facilitate construction. Wayfinding signage will be on site, along with additional information on the \u003Ca href=\u0022http:\/\/facilities.gatech.edu\/\u0022\u003EFacilities Construction Notice\u003C\/a\u003E and \u003Ca href=\u0022https:\/\/studentcenter.gatech.edu\/reinnovation\u0022\u003ECampus Center project\u003C\/a\u003E websites.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EMore information about the Campus Center project, including construction site maps and information on the finished facilities, can be found at\u0026nbsp;\u003Ca href=\u0022https:\/\/studentcenter.gatech.edu\/reinnovation\u0022\u003Ereinnovation.studentcenter.gatech.edu\u003C\/a\u003E.\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThose who work and park in the southwest sector of campus will notice more disruption this week as Phase I of construction begins on the Campus Center project.\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Those who work and park in the southwest sector of campus will notice more disruption this week as Phase I of construction begins on the Campus Center project."}],"uid":"27469","created_gmt":"2019-05-07 13:11:15","changed_gmt":"2022-05-26 17:09:36","author":"Kristen Bailey","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2019-05-07T00:00:00-04:00","iso_date":"2019-05-07T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"621426":{"id":"621426","type":"image","title":"Campus Center Project - Phase 1B - May 2019 Map","body":null,"created":"1557234610","gmt_created":"2019-05-07 13:10:10","changed":"1557234610","gmt_changed":"2019-05-07 13:10:10","alt":"Campus Center Project - Phase 1B - May 2019 Map","file":{"fid":"236697","name":"Phase 1B workmap.jpg","image_path":"\/sites\/default\/files\/images\/Phase%201B%20workmap.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/Phase%201B%20workmap.jpg","mime":"image\/jpeg","size":791859,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/Phase%201B%20workmap.jpg?itok=qsjPOChi"}}},"media_ids":["621426"],"related_links":[{"url":"https:\/\/studentcenter.gatech.edu\/reinnovation","title":"Campus Center Project"}],"groups":[{"id":"1294","name":"Auxiliary Services"},{"id":"1214","name":"News Room"},{"id":"64319","name":"Administration and Finance"},{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"176331","name":"Campus Center"},{"id":"1400","name":"Construction"},{"id":"3157","name":"Facilities"},{"id":"166965","name":"Student Center"}],"core_research_areas":[],"news_room_topics":[{"id":"71871","name":"Campus and Community"}],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EStudent Center\u003C\/p\u003E","format":"limited_html"}],"email":["kate.curnow@stucen.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}