{"620245":{"#nid":"620245","#data":{"type":"news","title":"Weber Building Re-roof Through July ","body":[{"value":"\u003Cp\u003EBuilding #84 Weber I, located at 281 Ferst Drive NW, is getting a new roof, to be completed by mid-July.\u0026nbsp;Construction will require a portion of the service parking lot, located behind Weber \u0026amp; J.S. Coon buildings, to be cordoned off for a\u0026nbsp;boom crane. Construction is expected to last through mid-July.\u0026nbsp;\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003EProject Impacts:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EFencing around the perimeter of building and a portion of the service parking lot ,(reserved Visitor Parking for J.S. Coon will be maintained)\u003C\/li\u003E\r\n\t\u003Cli\u003EStrategic closing of stairs immediately at the main entrance of the building to funnel pedestrians to safe access at the west\u0026nbsp;end of the building\u003C\/li\u003E\r\n\t\u003Cli\u003EDisplaced service vehicles relocating temporarily to one side of Cherry Street\u0026nbsp;\u003C\/li\u003E\r\n\t\u003Cli\u003EThe side exit of the building, leading out to the bus drop\/pick-up area will be maintained for egress with overhead protection\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EBuilding #84 Weber I, located at 281 Ferst Drive NW, is getting a new roof, to be completed by mid-July.\u0026nbsp;Construction will require a portion of the service parking lot, located behind Weber \u0026amp; J.S. Coon buildings, to be cordoned off for a\u0026nbsp;boom crane. Construction is expected to last through mid-July.\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Building #84 Weber I, located near the Historic Hill, is getting a new roof, to be completed by mid-July."}],"uid":"27705","created_gmt":"2019-04-09 18:43:33","changed_gmt":"2019-05-07 18:32:44","author":"Jessica Rose","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2019-04-09T00:00:00-04:00","iso_date":"2019-04-09T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"621448":{"id":"621448","type":"image","title":"Weber Building sign","body":null,"created":"1557253917","gmt_created":"2019-05-07 18:31:57","changed":"1557253917","gmt_changed":"2019-05-07 18:31:57","alt":"","file":{"fid":"236703","name":"weber bldg sign.jpg","image_path":"\/sites\/default\/files\/images\/weber%20bldg%20sign.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/weber%20bldg%20sign.jpg","mime":"image\/jpeg","size":916911,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/weber%20bldg%20sign.jpg?itok=an3UlvFb"}}},"media_ids":["621448"],"groups":[{"id":"383831","name":"Facilities Management"}],"categories":[{"id":"129","name":"Institute and Campus"}],"keywords":[{"id":"170033","name":"Weber"},{"id":"143221","name":"Facilities-Notices"}],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003EJessica Rose, Facilities Communications\u003C\/p\u003E\r\n\r\n\u003Cp\u003EJennifer Disotell, Construction Manager\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"email":["jennifer.disotell@facilities.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}