<nodes> <node id="688803">  <title><![CDATA[Paver Repair Planned for Atlantic Drive near Krone Building]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Replacement of the damaged pavers along Atlantic Drive in front of the Krone Engineered Biosystems Building will begin on Tuesday, March 10 and is expected to be completed by Friday, March 20. Access along Atlantic Drive will remain open throughout the project.</p><p>The pavers will be replaced in two phases, completing one half of the walkway before reopening and proceeding to the second half.&nbsp;</p><p>Please refer to the attached plan for additional details. We appreciate your patience as we complete this campus improvement project.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1772832232</created>  <gmt_created>2026-03-06 21:23:52</gmt_created>  <changed>1772832363</changed>  <gmt_changed>2026-03-06 21:26:03</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Broken pavers will be replaced beginning March 10.]]></teaser>  <type>news</type>  <sentence><![CDATA[Broken pavers will be replaced beginning March 10.]]></sentence>  <summary><![CDATA[<p>Broken pavers will be replaced beginning March 10.</p>]]></summary>  <dateline>2026-03-06T00:00:00-05:00</dateline>  <iso_dateline>2026-03-06T00:00:00-05:00</iso_dateline>  <gmt_dateline>2026-03-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>679544</item>      </media>  <hg_media>          <item>          <nid>679544</nid>          <type>image</type>          <title><![CDATA[EBB-PAVERS.jpg]]></title>          <body><![CDATA[<p>Image of map of paver replacement on Atlantic Drive March 10 through March 20.</p>]]></body>                      <image_name><![CDATA[EBB-PAVERS.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2026/03/06/EBB-PAVERS.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2026/03/06/EBB-PAVERS.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2026/03/06/EBB-PAVERS.jpg?itok=vI544vdg]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Image of map of paver replacement on Atlantic Drive March 10 through March 20.]]></image_alt>                    <created>1772832255</created>          <gmt_created>2026-03-06 21:24:15</gmt_created>          <changed>1772832255</changed>          <gmt_changed>2026-03-06 21:24:15</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="106251"><![CDATA[atlantic drive]]></keyword>          <keyword tid="174788"><![CDATA[krone building]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="688543">  <title><![CDATA[Road Paving Work Planned for Bobby Dodd Way and Brittain Drive]]></title>  <uid>35028</uid>  <body><![CDATA[<p>As construction of the Thomas A. Fanning Student-Athlete Performance Center enters its final stages, road paving improvements on Bobby Dodd Way and Brittain Drive are expected to begin Monday, March 2, and continue through Friday, March 6. Timing of this work is contingent on weather conditions.&nbsp;</p><p>Sections of these roads will be closed during the paving project.&nbsp;</p><ul><li>The work on Bobby Dodd Way will take place between Techwood Drive and Brittain Drive. </li><li>On Brittain Drive, paving will occur from the Peters Parking Deck entrance down to Bobby Dodd Way.</li></ul><p>The attached map highlights the areas affected.</p><p>Thank you for your patience as we enhance the road surfaces in these key campus areas.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1772123740</created>  <gmt_created>2026-02-26 16:35:40</gmt_created>  <changed>1772213844</changed>  <gmt_changed>2026-02-27 17:37:24</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[As the construction of the Student Athlete Performance Center enters its final stages, road paving improvements are planned for early March.]]></teaser>  <type>news</type>  <sentence><![CDATA[As the construction of the Student Athlete Performance Center enters its final stages, road paving improvements are planned for early March.]]></sentence>  <summary><![CDATA[<p>As the construction of the Student Athlete Performance Center enters its final stages, road paving improvements around the area are expected to begin on March 2.</p>]]></summary>  <dateline>2026-02-26T00:00:00-05:00</dateline>  <iso_dateline>2026-02-26T00:00:00-05:00</iso_dateline>  <gmt_dateline>2026-02-26 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[heather.hardie@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:heather.hardie@facilities.gatech.edu">Heather Hardie</a><br>Senior Construction Manager<br>Planning, Design, and Construction</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>679456</item>      </media>  <hg_media>          <item>          <nid>679456</nid>          <type>image</type>          <title><![CDATA[2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg]]></title>          <body><![CDATA[<p>Map indicating road closures for Bobby Dodd Way and Brittain Drive March 2 through 6. Dependent upon weather.</p>]]></body>                      <image_name><![CDATA[2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2026/02/26/2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2026/02/26/2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2026/02/26/2026-Road-Closure-Bobby-Dodd-Paving_Page_2.jpg?itok=2cz8baqa]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Image of map indicating road closures for Bobby Dodd Way and Brittain Drive March 2 - 6]]></image_alt>                    <created>1772126965</created>          <gmt_created>2026-02-26 17:29:25</gmt_created>          <changed>1772126965</changed>          <gmt_changed>2026-02-26 17:29:25</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="13283"><![CDATA[Bobby Dodd Way]]></keyword>          <keyword tid="188429"><![CDATA[Brittain Drive]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="688455">  <title><![CDATA[Drainage Improvements Begin Near Ferst Center and Smithgall Student Services Building]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Phase One of the Ferst Center drainage improvement project begins Monday, Feb. 23. The attached map indicates the construction/laydown area between the Ferst Center and the Smithgall Student Services building.&nbsp;</p><p>Thank you for your patience during this campus enhancement project.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1771629921</created>  <gmt_created>2026-02-20 23:25:21</gmt_created>  <changed>1771866959</changed>  <gmt_changed>2026-02-23 17:15:59</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Phase one of landscape enhancements will begin Monday, Feb. 23.]]></teaser>  <type>news</type>  <sentence><![CDATA[Phase one of landscape enhancements will begin Monday, Feb. 23.]]></sentence>  <summary><![CDATA[<p>Phase one of landscape enhancements will begin Monday, Feb. 23.</p>]]></summary>  <dateline>2026-02-20T00:00:00-05:00</dateline>  <iso_dateline>2026-02-20T00:00:00-05:00</iso_dateline>  <gmt_dateline>2026-02-20 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>679392</item>      </media>  <hg_media>          <item>          <nid>679392</nid>          <type>image</type>          <title><![CDATA[Ferst Center Drainage Improvement Project Feb 23, 2026]]></title>          <body><![CDATA[<p>image of map with logistics for drainage project near the Ferst Center and the Smithgall Building</p>]]></body>                      <image_name><![CDATA[Ferst-Center-Drainage-Improvement-Project-Feb-23-2026.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2026/02/23/Ferst-Center-Drainage-Improvement-Project-Feb-23-2026.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2026/02/23/Ferst-Center-Drainage-Improvement-Project-Feb-23-2026.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2026/02/23/Ferst-Center-Drainage-Improvement-Project-Feb-23-2026.png?itok=163Hc9_V]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[image of map with logistics for drainage project near the Ferst Center and the Smithgall Building]]></image_alt>                    <created>1771866862</created>          <gmt_created>2026-02-23 17:14:22</gmt_created>          <changed>1771866920</changed>          <gmt_changed>2026-02-23 17:15:20</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="260"><![CDATA[Ferst Center]]></keyword>          <keyword tid="170786"><![CDATA[smithgall]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="688241">  <title><![CDATA[Additional Pedestrian and Bike Signals Added to Fifth Street, Bobby Dodd Way, and Techwood Drive Intersections]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Additional pedestrian and bike signalization heads will be added to intersection of Fifth Street and Techwood Drive on Friday, Feb. 13. Concurrently, the pedestrian and bike signalization heads at Techwood Drive and Bobby Dodd Way will be tested and adjusted.&nbsp;</p><p>During the installation and adjustments, the intersection may default to a four way stop with work lasting 2-3 hours. Traffic patterns will remain as is during the work.</p><p>Thank you for your patience as we continue to make enhancements to campus safety.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1770994207</created>  <gmt_created>2026-02-13 14:50:07</gmt_created>  <changed>1771262961</changed>  <gmt_changed>2026-02-16 17:29:21</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Additional safety measures installed at three campus intersections.]]></teaser>  <type>news</type>  <sentence><![CDATA[Additional safety measures installed at three campus intersections.]]></sentence>  <summary><![CDATA[<p>Additional safety measures installed at three campus intersections.</p>]]></summary>  <dateline>2026-02-13T00:00:00-05:00</dateline>  <iso_dateline>2026-02-13T00:00:00-05:00</iso_dateline>  <gmt_dateline>2026-02-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>679295</item>      </media>  <hg_media>          <item>          <nid>679295</nid>          <type>image</type>          <title><![CDATA[Fifth Street Bike Signals Feb. 13 2026]]></title>          <body><![CDATA[<p>Additional Pedestrian/Bike signalization heads to be added at 5th and Techwood Drive 2/13. Pedestrian/Bike signalization heads at Bobby Dodd Way and Techwood Drive will be tested and adjusted 2/13.</p>]]></body>                      <image_name><![CDATA[Fifth-Street-Bike-Signals-Feb.-13-2026_0.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2026/02/16/Fifth-Street-Bike-Signals-Feb.-13-2026_0.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2026/02/16/Fifth-Street-Bike-Signals-Feb.-13-2026_0.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2026/02/16/Fifth-Street-Bike-Signals-Feb.-13-2026_0.png?itok=5nEjkZEE]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Additional Pedestrian/Bike signalization heads to be added at 5th and Techwood Drive 2/13. Pedestrian/Bike signalization heads at Bobby Dodd Way and Techwood Drive will be tested and adjusted 2/13.]]></image_alt>                    <created>1771262878</created>          <gmt_created>2026-02-16 17:27:58</gmt_created>          <changed>1771262923</changed>          <gmt_changed>2026-02-16 17:28:43</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="188001"><![CDATA[Techwood Drive]]></keyword>          <keyword tid="13283"><![CDATA[Bobby Dodd Way]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="686761">  <title><![CDATA[Techwood Drive Lane Closures Jan. 8 through Jan. 10 for Baptist Collegiate Ministries Crane Staging Near Bobby Dodd Way ]]></title>  <uid>35028</uid>  <body><![CDATA[<div><p lang="EN-US"><strong>UPDATE Thursday, Jan. 8:</strong> Due to scheduling conflicts, the road closure on Techwood Drive will now begin on Thursday, Jan. 8, and continue through Saturday, Jan. 10. Traffic should resume on Sunday, Jan. 11. Dates are subject to weather conditions and may change.&nbsp;</p><p lang="EN-US">************</p><p lang="EN-US">To allow for the installation of a crane on the Baptist Collegiate Ministries property, Techwood Drive between Bobby Dodd Way and Fourth Street will be closed to vehicular and pedestrian traffic beginning Wednesday, Dec. 17. This section will be closed 24 hours a day and is expected to reopen to traffic on Saturday, Dec. 20. Detour signage will be installed around the location for the duration of the closure.&nbsp;</p></div><div><p lang="EN-US">Georgia Tech is not managing this construction project. However, Infrastructure and Sustainability will coordinate with the Baptist Collegiate Ministries' construction team throughout the project.&nbsp;</p></div><div><p lang="EN-US">Thank you for your patience as this campus addition progresses. <a href="https://christianindex.org/stories/new-ministry-center-and-student-housing-planned-for-georgia-tech-bcm-site,102423" rel="noreferrer noopener" target="_blank">Learn more about the project.</a>&nbsp;</p></div>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1764968078</created>  <gmt_created>2025-12-05 20:54:38</gmt_created>  <changed>1767905484</changed>  <gmt_changed>2026-01-08 20:51:24</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Lane closures of a section of Techwood Drive will occur for three days.]]></teaser>  <type>news</type>  <sentence><![CDATA[Lane closures of a section of Techwood Drive will occur for three days.]]></sentence>  <summary><![CDATA[<p>Lane closures of a section of Techwood Drive will occur for three days.</p>]]></summary>  <dateline>2025-12-05T00:00:00-05:00</dateline>  <iso_dateline>2025-12-05T00:00:00-05:00</iso_dateline>  <gmt_dateline>2025-12-05 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cathy.brim@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Cathy Brim</p><p>Communications Officer II</p><p>Institute Communications/Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>678828</item>      </media>  <hg_media>          <item>          <nid>678828</nid>          <type>image</type>          <title><![CDATA[baptist_techwood_closure_dec2025.png]]></title>          <body><![CDATA[<p>Image of Techwood Drive lane closure Dec. 17 through Dec. 20.</p>]]></body>                      <image_name><![CDATA[baptist_techwood_closure_dec2025.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/12/11/baptist_techwood_closure_dec2025.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/12/11/baptist_techwood_closure_dec2025.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/12/11/baptist_techwood_closure_dec2025.png?itok=BZLS8SID]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Image of Techwood Drive lane closure Dec. 17 through Dec. 20.]]></image_alt>                    <created>1765471116</created>          <gmt_created>2025-12-11 16:38:36</gmt_created>          <changed>1765471116</changed>          <gmt_changed>2025-12-11 16:38:36</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="185151"><![CDATA[Georgia Tech Baptist Collegiate Ministry]]></keyword>          <keyword tid="10641"><![CDATA[buidling construction]]></keyword>          <keyword tid="188001"><![CDATA[Techwood Drive]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="686747">  <title><![CDATA[Underground Utility Investigations Between Pettit Building and College of Computing Begin Dec. 9]]></title>  <uid>35028</uid>  <body><![CDATA[<p>As part of the due diligence to replace chilled water piping serving the College of Computing and the Pettit Microelectronics Building, investigative excavations, roughly 12" square with depths to be determined, will be conducted by hand or with small portable equipment.</p><p>Project activity will start Dec. 9 and occur between 8 a.m. and 6 p.m. daily. No interference with Commencement ceremonies, Dec. 11 – 13, is expected. Safety barriers will be erected around each excavation and the work utilizing heavier equipment is scheduled to occur after Dec. 15. Expect some pedestrian disruption in the affected areas. Detours will be established as needed, most likely directing foot traffic to Ferst Drive.</p><p>Following all Commencement activities, additional work such as cutting sidewalks will be necessary, and appropriate detours will be available. Project activity is scheduled for completion by Jan. 6.&nbsp;</p><p>The campus community's patience and understanding are appreciated during this campus improvement project.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1764884101</created>  <gmt_created>2025-12-04 21:35:01</gmt_created>  <changed>1764964086</changed>  <gmt_changed>2025-12-05 19:48:06</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Small, investigative excavations will determine precise locations for future chilled water piping.]]></teaser>  <type>news</type>  <sentence><![CDATA[Small, investigative excavations will determine precise locations for future chilled water piping.]]></sentence>  <summary><![CDATA[<p>Small, investigative excavations will determine precise locations for future chilled water piping.</p>]]></summary>  <dateline>2025-12-04T00:00:00-05:00</dateline>  <iso_dateline>2025-12-04T00:00:00-05:00</iso_dateline>  <gmt_dateline>2025-12-04 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Nicholas Palfrey NCARB, PMP, CDT, LEED AP</p><p>Senior Project Manager</p><p>Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>678761</item>      </media>  <hg_media>          <item>          <nid>678761</nid>          <type>image</type>          <title><![CDATA[pettit_computing_utilitywork_dec2025.png]]></title>          <body><![CDATA[<p>Map of utility project planned underground investigations.</p>]]></body>                      <image_name><![CDATA[pettit_computing_utilitywork_dec2025.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/12/04/pettit_computing_utilitywork_dec2025.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/12/04/pettit_computing_utilitywork_dec2025.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/12/04/pettit_computing_utilitywork_dec2025.png?itok=m1iOrCjo]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Image of planned investigative work between the Pettit Building and the College of Computing Building.]]></image_alt>                    <created>1764884230</created>          <gmt_created>2025-12-04 21:37:10</gmt_created>          <changed>1764884230</changed>          <gmt_changed>2025-12-04 21:37:10</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="194870"><![CDATA[Pettit Building]]></keyword>          <keyword tid="654"><![CDATA[College of Computing]]></keyword>          <keyword tid="193308"><![CDATA[Utility work]]></keyword>          <keyword tid="187999"><![CDATA[chilled water piping]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="686373">  <title><![CDATA[Fifth Street Road Striping Planned for Nov. 12]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Permanent roadway striping will resume on&nbsp;<strong>Wednesday, November 12th.</strong></p><ul><li><strong>Location</strong>: Fifth Street between Spring Street and West Peachtree Street.</li><li>The road will remain open with flagmen around the workers.</li><li>Parallel parking in this location will be unavailable.</li></ul><p>We appreciate your patience during this campus improvement project. Should you have any questions, please feel free to reach out.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1762885992</created>  <gmt_created>2025-11-11 18:33:12</gmt_created>  <changed>1762885992</changed>  <gmt_changed>2025-11-11 18:33:12</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Fifth Street, between Spring Street and W. Peachtree, will undergo road striping.]]></teaser>  <type>news</type>  <sentence><![CDATA[Fifth Street, between Spring Street and W. Peachtree, will undergo road striping.]]></sentence>  <summary><![CDATA[<p>Fifth Street, between Spring Street and W. Peachtree, will undergo road striping.</p>]]></summary>  <dateline>2025-11-11T00:00:00-05:00</dateline>  <iso_dateline>2025-11-11T00:00:00-05:00</iso_dateline>  <gmt_dateline>2025-11-11 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cathy.brim@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Cathy Brim</p><p>Communications Officer II</p><p>Institute Communications</p><p>Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="194686"><![CDATA[Fifth Street]]></keyword>          <keyword tid="192181"><![CDATA[Tech Square Phase 3]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="686153">  <title><![CDATA[Communication Box Replacement at Sixth Street and Fowler Street Nov. 3 – 5]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Starting Monday, Nov. 3, the southeast corner of Sixth Street and Fowler Street will be closed to install a new communication box. Pedestrians should use indicated detours to traverse the area. The project is expected to be complete by close of business Wednesday, Nov. 5. Please see the attached graphic for detours.&nbsp;</p><p>Thank you for your patience during this campus improvement project.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1762194114</created>  <gmt_created>2025-11-03 18:21:54</gmt_created>  <changed>1762194394</changed>  <gmt_changed>2025-11-03 18:26:34</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The southeast corner of the intersection will be closed for campus improvements. ]]></teaser>  <type>news</type>  <sentence><![CDATA[The southeast corner of the intersection will be closed for campus improvements. ]]></sentence>  <summary><![CDATA[<p>The southeast corner of the intersection will be closed for campus improvements.&nbsp;</p>]]></summary>  <dateline>2025-11-03T00:00:00-05:00</dateline>  <iso_dateline>2025-11-03T00:00:00-05:00</iso_dateline>  <gmt_dateline>2025-11-03 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>678522</item>      </media>  <hg_media>          <item>          <nid>678522</nid>          <type>image</type>          <title><![CDATA[6th-and-Fowler-Communication-Box-Replacement.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[6th-and-Fowler-Communication-Box-Replacement.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/11/03/6th-and-Fowler-Communication-Box-Replacement.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/11/03/6th-and-Fowler-Communication-Box-Replacement.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/11/03/6th-and-Fowler-Communication-Box-Replacement.jpg?itok=oaJEIAob]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of project work for Sixth and Fowler communication box replacement]]></image_alt>                    <created>1762194260</created>          <gmt_created>2025-11-03 18:24:20</gmt_created>          <changed>1762194260</changed>          <gmt_changed>2025-11-03 18:24:20</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="685988">  <title><![CDATA[Helicopter-Assisted Light Pole Installation at Peters Parking Deck]]></title>  <uid>35028</uid>  <body><![CDATA[<div><p lang="EN-US">A construction&nbsp;helicopter, or heli-crane, will be used to assist with the installation of new light poles atop the Peters Parking Deck on Wednesday, Nov. 5. The poles will be assembled on the deck and then lifted into place by the helicopter. When one pole is installed, the helicopter will move to the next pole for a total of 12&nbsp;poles. Helicopter activity will occur during the entire time frame. &nbsp;</p></div><div><p lang="EN-US">Flaggers will be on site to manage traffic and pedestrian flow on the roads surrounding the deck. &nbsp;</p><p lang="EN-US">Full parking access will resume at the conclusion of the installation.&nbsp;&nbsp;</p><p lang="EN-US">Light rain will not affect the project. Should anything change, information will be updated.</p><p lang="EN-US">Thank you for your cooperation as we implement this campus improvement project.&nbsp;</p></div><div><p lang="EN-US"><strong>Details:</strong>&nbsp;</p></div><div><ul><li><p lang="EN-US"><strong>Time:</strong> 9 a.m. – 1 p.m.&nbsp;</p></li></ul></div><div><ul><li><p lang="EN-US"><strong>Noise Alert:</strong> Expect elevated noise levels during this period.&nbsp;</p></li></ul></div><div><ul><li><p lang="EN-US"><strong>Parking Advisory:</strong>&nbsp;The middle-level uncovered parking zones of Peters Deck will be restricted during this time. Notifications will be sent directly to those affected.&nbsp;</p></li></ul></div><div><ul><li><p lang="EN-US"><strong>Avoid the following areas</strong> <strong>surrounding the deck:</strong>&nbsp;</p></li></ul></div><div><ul><li><p lang="EN-US">Fowler Street&nbsp;</p></li><li><p lang="EN-US">Brittain Drive</p></li><li><p lang="EN-US">Fourth Street</p></li><li><p lang="EN-US">Bobby Dodd Way</p></li></ul></div>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1761330042</created>  <gmt_created>2025-10-24 18:20:42</gmt_created>  <changed>1762186659</changed>  <gmt_changed>2025-11-03 16:17:39</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[A large helicopter will assist in the installation of upgraded lighting on the roof of Peters Parking Deck.]]></teaser>  <type>news</type>  <sentence><![CDATA[A large helicopter will assist in the installation of upgraded lighting on the roof of Peters Parking Deck.]]></sentence>  <summary><![CDATA[<p>A large helicopter will assist in the installation of upgraded lighting on the roof of Peters Parking Deck.</p>]]></summary>  <dateline>2025-10-24T00:00:00-04:00</dateline>  <iso_dateline>2025-10-24T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-10-24 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[bmorris30@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:bmorris30@gatech.edu">Brad Morris</a></p><p>Capital Projects Director</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>678449</item>      </media>  <hg_media>          <item>          <nid>678449</nid>          <type>image</type>          <title><![CDATA[helicopter_lightpole_installation.png]]></title>          <body><![CDATA[<p>Logistics plan for parking restriction during helicopter assisted light pole installation on Peters parking deck.</p>]]></body>                      <image_name><![CDATA[helicopter_lightpole_installation.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/10/24/helicopter_lightpole_installation.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/10/24/helicopter_lightpole_installation.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/10/24/helicopter_lightpole_installation.png?itok=OSVfqoMy]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Logistics plan for parking restriction during helicopter assisted light pole installation on Peters parking deck.]]></image_alt>                    <created>1761330203</created>          <gmt_created>2025-10-24 18:23:23</gmt_created>          <changed>1761330203</changed>          <gmt_changed>2025-10-24 18:23:23</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="685450">  <title><![CDATA[Tech Square Phase 3 Paving This Month]]></title>  <uid>35028</uid>  <body><![CDATA[<p>During October, the following paving activity will occur on the streets surrounding Tech Square Phase 3:</p><ul><li><strong>Monday, Oct. 6, and Tuesday, Oct. 7</strong>: Paving of the intersection of West Peachtree and Fifth streets. During this time, two lanes of West Peachtree Street at a time will be closed between 7 a.m. and 5 p.m. Fifth Street will be open for traffic and parking. Expect delays turning onto West Peachtree.</li><li><strong>Wednesday, Oct. 8 – Friday, Oct. 10</strong>: Fifth Street will be closed 24 hours a day between West Peachtree Street and Spring Street.</li><li><strong>Saturday, Oct. 11, and Sunday, Oct. 12</strong>: Fifth Street will be open for the weekend, including Saturday’s 3:30 p.m. football game vs. Virginia Tech.</li><li><strong>Monday, Oct. 13, and Tuesday, Oct. 14</strong>: Fifth Street will be closed 24 hours a day between West Peachtree Street and Spring Street.</li><li><strong>Wednesday, Oct. 15 – Friday, Oct. 17</strong>: Paving of the current pedestrian walkway along the east side of Spring Street.</li></ul><p>Thank you for your patience as we enter the home stretch of the exterior improvements surrounding Tech Square Phase 3.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1759354417</created>  <gmt_created>2025-10-01 21:33:37</gmt_created>  <changed>1759497256</changed>  <gmt_changed>2025-10-03 13:14:16</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Paving activity will occur at various locations surrounding the new buildings.]]></teaser>  <type>news</type>  <sentence><![CDATA[Paving activity will occur at various locations surrounding the new buildings.]]></sentence>  <summary><![CDATA[<p>Paving activity will occur at various locations surrounding the new buildings.</p>]]></summary>  <dateline>2025-10-01T00:00:00-04:00</dateline>  <iso_dateline>2025-10-01T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-10-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Lindsey Cottingham, PE, LEED AP</strong><br>Associate Director – Construction Services<br>Planning, Design, and Construction/Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>676417</item>      </media>  <hg_media>          <item>          <nid>676417</nid>          <type>image</type>          <title><![CDATA[Tech Square]]></title>          <body><![CDATA[<p>Pedestrians in Tech Square</p>]]></body>                      <image_name><![CDATA[19C10400-P4-005-Web-Use---1-000px-Wide.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/02/26/19C10400-P4-005-Web-Use---1-000px-Wide.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/02/26/19C10400-P4-005-Web-Use---1-000px-Wide.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/02/26/19C10400-P4-005-Web-Use---1-000px-Wide.jpg?itok=3IQbZWjU]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Tech Square]]></image_alt>                    <created>1740620858</created>          <gmt_created>2025-02-27 01:47:38</gmt_created>          <changed>1740620858</changed>          <gmt_changed>2025-02-27 01:47:38</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="64319"><![CDATA[Administration and Finance]]></group>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="192181"><![CDATA[Tech Square Phase 3]]></keyword>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="684433">  <title><![CDATA[Baptist Collegiate Ministry Utility Work Planned for Sept. 8 – 15]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Georgia Power will continue work along Techwood Drive for the Baptist Campus Ministry project (not a Georgia Tech project) over the next two weeks. They anticipate minimal impact on pedestrian and vehicular traffic flow. They will have traffic control personnel on-site to manage and maintain the flow and ensure smooth movement. They are coordinating efforts with GTPD. The work they will be doing and timing:</p><ul type="disc"><li><strong>Week of September 8</strong>: Installation of road crossings for underground cable</li><li><strong>Week of September 15</strong>: Energizing underground cable and removal of overhead lines</li></ul><p>Thank you for your patience as this project progresses.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1757084927</created>  <gmt_created>2025-09-05 15:08:47</gmt_created>  <changed>1757084927</changed>  <gmt_changed>2025-09-05 15:08:47</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Utility infrastructure work will be ongoing during this timeframe.]]></teaser>  <type>news</type>  <sentence><![CDATA[Utility infrastructure work will be ongoing during this timeframe.]]></sentence>  <summary><![CDATA[<p>Utility infrastructure work will be ongoing during this timeframe.</p>]]></summary>  <dateline>2025-09-05T00:00:00-04:00</dateline>  <iso_dateline>2025-09-05T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-09-05 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[amandamewborn@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Amanda Mewborn</p><p>Associate Vice President</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="188464"><![CDATA[Baptist College Ministries]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="684303">  <title><![CDATA[Sidwalk Repairs at Sixth Street and Fowler Street]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Tuesday, Sept. 2, repairs will replace the corner panel of the sidewalk at Sixth and Fowler Streets. Work will include correcting ADA pavers and replacing poorly finished concrete. Please see the attached graphic for pedestrian detour routes. Work is expected to be complete by Friday, Sept. 5. Thank you for your patience as we make this campus improvement.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1756496973</created>  <gmt_created>2025-08-29 19:49:33</gmt_created>  <changed>1756497160</changed>  <gmt_changed>2025-08-29 19:52:40</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Repair work will be ongoing from Sept. 2 through Sept. 5.]]></teaser>  <type>news</type>  <sentence><![CDATA[Repair work will be ongoing from Sept. 2 through Sept. 5.]]></sentence>  <summary><![CDATA[<p>Repair work will be ongoing from Sept. 2 through Sept. 5.</p>]]></summary>  <dateline>2025-08-29T00:00:00-04:00</dateline>  <iso_dateline>2025-08-29T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-08-29 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>677864</item>      </media>  <hg_media>          <item>          <nid>677864</nid>          <type>image</type>          <title><![CDATA[6th_and_Fowler_Aug2025jpgs_Page_2.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[6th_and_Fowler_Aug2025jpgs_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/08/29/6th_and_Fowler_Aug2025jpgs_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/08/29/6th_and_Fowler_Aug2025jpgs_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/08/29/6th_and_Fowler_Aug2025jpgs_Page_2.jpg?itok=kxWUorXA]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Photo of sidewalk corner where repair work will occur Sept. 2 - 5.]]></image_alt>                    <created>1756497054</created>          <gmt_created>2025-08-29 19:50:54</gmt_created>          <changed>1756497054</changed>          <gmt_changed>2025-08-29 19:50:54</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="172519"><![CDATA[Sixth Street]]></keyword>          <keyword tid="193397"><![CDATA[Fowler street]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="684081">  <title><![CDATA[Utility Work for the Baptist Collegiate Ministry Construction Project Begins Mon. Aug. 25]]></title>  <uid>35028</uid>  <body><![CDATA[<p>In preparation for the construction of a new building for the Baptist Collegiate Ministry (BCM), the installation of temporary utility poles-will begin along the west side of Techwood Drive on Mon. Aug. 25. Flagging crews will be on site to assist with traffic management. Please note this is not a Georgia Tech-owned construction project.&nbsp;</p><p>Georgia Power targets an anticipated completion date of September 5th. Below is a tentative schedule of activities during this period:</p><ul><li><strong>Week of August 25:</strong>&nbsp;Installation of new poles in preparation for underground work</li><li><strong>Week of September 1:</strong>&nbsp;Boring of conduit and installation of underground cable</li><li><strong>By September 5:</strong>&nbsp;Energizing underground cable and removal of overhead lines</li></ul><p>Once the vendors involved are finished with their work, Georgia Power will return to remove the temporary utility poles.&nbsp; &nbsp;</p><p>Further details to come as they are received. Thank you for your understanding and patience as this project progresses.</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1755880776</created>  <gmt_created>2025-08-22 16:39:36</gmt_created>  <changed>1756130770</changed>  <gmt_changed>2025-08-25 14:06:10</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[As the Baptist Collegiate Ministry prepares to construct a new building on its current footprint, initial utility work begins.]]></teaser>  <type>news</type>  <sentence><![CDATA[As the Baptist Collegiate Ministry prepares to construct a new building on its current footprint, initial utility work begins.]]></sentence>  <summary><![CDATA[<p>As the Baptist Collegiate Ministry prepares to construct a new building on its current footprint, initial utility work begins.</p>]]></summary>  <dateline>2025-08-22T00:00:00-04:00</dateline>  <iso_dateline>2025-08-22T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-08-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[amandamewborn@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Amanda Mewborn</p><p>Associate Vice President</p><p>Planning, Design, and Construction | Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="185151"><![CDATA[Georgia Tech Baptist Collegiate Ministry]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="683746">  <title><![CDATA[Curran and Ninth Streets Closed Through Early October for Residence Hall Continued Construction]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Curran and Ninth Streets will be closed beginning Monday, Aug. 18 and continue through early October. Please use alternate routes for bus, vehicular, and pedestrian traffic, similar to the routes used during the summer. Thank you for your cooperation as we continue to make progress on the new residence hall.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1755022855</created>  <gmt_created>2025-08-12 18:20:55</gmt_created>  <changed>1755288881</changed>  <gmt_changed>2025-08-15 20:14:41</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[As work continues on the new residence hall, street closures will continue into fall.]]></teaser>  <type>news</type>  <sentence><![CDATA[As work continues on the new residence hall, street closures will continue into fall.]]></sentence>  <summary><![CDATA[<p>As work continues on the new residence hall, street closures will continue into fall.</p>]]></summary>  <dateline>2025-08-12T00:00:00-04:00</dateline>  <iso_dateline>2025-08-12T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-08-12 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><br><strong>Chris B. Williams</strong></p><p>Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;&nbsp;</p><p>(c)&nbsp;470.553.7197&nbsp;&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>677663</item>      </media>  <hg_media>          <item>          <nid>677663</nid>          <type>image</type>          <title><![CDATA[Curran-Street-Closure-2025.08.18.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Curran-Street-Closure-2025.08.18.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/08/12/Curran-Street-Closure-2025.08.18.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/08/12/Curran-Street-Closure-2025.08.18.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/08/12/Curran-Street-Closure-2025.08.18.jpg?itok=1c2ckNGz]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of road closures for the continued construction work for Curran Street Residence Hall.]]></image_alt>                    <created>1755023057</created>          <gmt_created>2025-08-12 18:24:17</gmt_created>          <changed>1755023057</changed>          <gmt_changed>2025-08-12 18:24:17</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="194376"><![CDATA[Curran Street Residence Hall]]></keyword>          <keyword tid="190118"><![CDATA[road closures]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="683207">  <title><![CDATA[Fifth Street Closure Between Spring St. and Williams St. for Pedestrian Crosswalk Repair]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Repair work on the mid-block raised pedestrian crosswalk will take place beginning Monday, July 28 through Friday, August 1. Fifth Street will be closed in this section and all traffic will detour around the project site. Please see attached map for detour details.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1753132854</created>  <gmt_created>2025-07-21 21:20:54</gmt_created>  <changed>1753133203</changed>  <gmt_changed>2025-07-21 21:26:43</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Repairs will be made to the Fifth Street raised pedestrian crosswalk between Spring Street and Williams Street.]]></teaser>  <type>news</type>  <sentence><![CDATA[Repairs will be made to the Fifth Street raised pedestrian crosswalk between Spring Street and Williams Street.]]></sentence>  <summary><![CDATA[<p>Repairs will be made to the Fifth Street raised pedestrian crosswalk between Spring Street and Williams Street.</p>]]></summary>  <dateline>2025-07-21T00:00:00-04:00</dateline>  <iso_dateline>2025-07-21T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-07-21 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jason.gregory@cpsm.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jason Gregory</p><p>Institute Landscape Architect</p><p>Planning, Design, and Construction</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>677463</item>      </media>  <hg_media>          <item>          <nid>677463</nid>          <type>image</type>          <title><![CDATA[5TH_ST_CLOSED_SPRING--WILLIAMS-Traffic-Control-Pln_JUly2025.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[5TH_ST_CLOSED_SPRING--WILLIAMS-Traffic-Control-Pln_JUly2025.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/07/21/5TH_ST_CLOSED_SPRING--WILLIAMS-Traffic-Control-Pln_JUly2025.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/07/21/5TH_ST_CLOSED_SPRING--WILLIAMS-Traffic-Control-Pln_JUly2025.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/07/21/5TH_ST_CLOSED_SPRING--WILLIAMS-Traffic-Control-Pln_JUly2025.jpg?itok=UhEdc81f]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for detour around Fifth Street closed area between Spring and W. Peachtree]]></image_alt>                    <created>1753132911</created>          <gmt_created>2025-07-21 21:21:51</gmt_created>          <changed>1753132911</changed>          <gmt_changed>2025-07-21 21:21:51</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="194686"><![CDATA[Fifth Street]]></keyword>          <keyword tid="194687"><![CDATA[crosswalk repair]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="683096">  <title><![CDATA[Ferst Drive Realignment Project – Upcoming Construction Activities]]></title>  <uid>27164</uid>  <body><![CDATA[<div><p>As part of the ongoing Ferst Drive Realignment Project, the following work will affect vehicular and pedestrian circulation in the areas noted below. No road closures are planned; however, traffic will be flagged through active work zones. Commuters should expect delays.&nbsp;&nbsp;</p></div><div><p><strong>Pedestrian and Roadway Disruptions:</strong>&nbsp;</p></div><div><p><strong>Beginning Friday, July 11</strong>&nbsp;</p></div><div><ul><li>The southeast corner of Fifth Street and Techwood Drive will reopen to pedestrian traffic.&nbsp;</li></ul></div><div><ul><li>Demolition will begin on the southwest corner of Fifth Street and Techwood Drive.&nbsp;</li></ul></div><div><ul><li>The sidewalk on the south side of Fifth Street between Techwood Drive and Fowler Street will close through <strong>July 25.</strong>&nbsp;</li></ul></div><div><p><strong>Monday, July 14, Through Wednesday, July 23</strong>&nbsp;</p></div><div><ul><li>Milling operations will take place along Fifth Street and Ferst Drive, from Russ Chandler Stadium to the Fifth Street Bridge, <strong>July 14 – 16.</strong>&nbsp;</li></ul></div><div><ul><li>Milling of failing sections of asphalt on Fowler Street and Fourth Street is scheduled for <strong>July 16. </strong>To facilitate this work, parking along Fowler Street will be closed <strong>July</strong> <strong>15 – 23.</strong> Please refer to the map for parking impacts.&nbsp;</li></ul></div><div><ul><li>Paving will occur along Fifth Street and Ferst Drive <strong>July 21 – 23.</strong>&nbsp;</li></ul></div><div><ul><li>Paving will be completed on Fowler Street and Fourth Street on <strong>July 23.</strong>&nbsp;</li></ul></div>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1752181188</created>  <gmt_created>2025-07-10 20:59:48</gmt_created>  <changed>1752184173</changed>  <gmt_changed>2025-07-10 21:49:33</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[As part of the ongoing Ferst Drive Realignment Project, the following work will affect vehicular and pedestrian circulation in the areas noted.]]></teaser>  <type>news</type>  <sentence><![CDATA[As part of the ongoing Ferst Drive Realignment Project, the following work will affect vehicular and pedestrian circulation in the areas noted.]]></sentence>  <summary><![CDATA[<p>As part of the ongoing Ferst Drive Realignment Project, the following work will affect vehicular and pedestrian circulation in the areas noted. No road closures are planned; however, traffic will be flagged through active work zones. Commuters should expect delays.&nbsp;&nbsp;</p>]]></summary>  <dateline>2025-07-10T00:00:00-04:00</dateline>  <iso_dateline>2025-07-10T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-07-10 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jerry Young</strong><br>Landscape Project Manager<br>Planning, Design and Construction<br>Infrastructure and Sustainability&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>677391</item>      </media>  <hg_media>          <item>          <nid>677391</nid>          <type>image</type>          <title><![CDATA[Ferst-Drive-Realignment-upcoming-work-schedule-and-logistics.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst-Drive-Realignment-upcoming-work-schedule-and-logistics.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/07/10/Ferst-Drive-Realignment-upcoming-work-schedule-and-logistics_0.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/07/10/Ferst-Drive-Realignment-upcoming-work-schedule-and-logistics_0.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/07/10/Ferst-Drive-Realignment-upcoming-work-schedule-and-logistics_0.jpg?itok=UjC2eFg_]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of construction on Ferst Drive July 2025]]></image_alt>                    <created>1752184084</created>          <gmt_created>2025-07-10 21:48:04</gmt_created>          <changed>1752184084</changed>          <gmt_changed>2025-07-10 21:48:04</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://facilities.gatech.edu/construction-updates]]></url>        <title><![CDATA[Construction Updates]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="682976">  <title><![CDATA[East Campus Streetscapes Continue Through July 3]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The following work will occur this week along Techwood and Ferst Drives.</p><ol><li>&nbsp;Manhole cover adjustments at 801 Techwood Drive and near the drive entrance to Brittain Hall loading dock. The traffic lane will be coned and traffic directed around the work area July 2 – 3.</li><li>The Fowler Street and Ferst Drive traffic signal pull box relocation and rewiring. The pull box containing traffic signal cables at the southeast corner of Fowler and Ferst Dive will be relocated on July 3 and the traffic signal will be out of service until 4 p.m. July 3. The installation of temporary stop signs will create a four-way stop for the duration of work.</li></ol><p>&nbsp;See attached graphic for additional information and if you have any questions or concerns, please let me know.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1751403460</created>  <gmt_created>2025-07-01 20:57:40</gmt_created>  <changed>1751403871</changed>  <gmt_changed>2025-07-01 21:04:31</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Roadway work will affect Techwood near Brittain and the intersection of Fowler and Ferst.]]></teaser>  <type>news</type>  <sentence><![CDATA[Roadway work will affect Techwood near Brittain and the intersection of Fowler and Ferst.]]></sentence>  <summary><![CDATA[<p>Roadway work will affect Techwood near Brittain and the intersection of Fowler and Ferst.</p>]]></summary>  <dateline>2025-07-01T00:00:00-04:00</dateline>  <iso_dateline>2025-07-01T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-07-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="682876">  <title><![CDATA[Work Continues at Western End of Bobby Dodd Way]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning June 24, the southern lane of Bobby Dodd Way will be closed from the Library to the intersection of Power Plant Drive.&nbsp;This project is to install a duct bank for OIT to connect the interconnect to a vault near the Daniel Laboratory Building.&nbsp;The project is scheduled to be complete by August 1.&nbsp;</p><p>Please note this project has been on hold pending completion of the steam vault work which closed the northern lane of Bobby Dodd.&nbsp; That work is now complete and the fencing removed. One lane access is maintained to the library.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1750786082</created>  <gmt_created>2025-06-24 17:28:02</gmt_created>  <changed>1750786314</changed>  <gmt_changed>2025-06-24 17:31:54</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Ductbank installation will close the southern lane of Bobby Dodd Way from the Library to Power Plant Drive.]]></teaser>  <type>news</type>  <sentence><![CDATA[Ductbank installation will close the southern lane of Bobby Dodd Way from the Library to Power Plant Drive.]]></sentence>  <summary><![CDATA[<p>Ductbank installation will close the southern lane of Bobby Dodd Way from the Library to Power Plant Drive.</p>]]></summary>  <dateline>2025-06-24T00:00:00-04:00</dateline>  <iso_dateline>2025-06-24T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-06-24 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Nicola Palfrey</p><p>NCARB, PMP, CDT, LEED AP</p><p>Senior Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>677273</item>      </media>  <hg_media>          <item>          <nid>677273</nid>          <type>image</type>          <title><![CDATA[ductbank_install_june2025.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[ductbank_install_june2025.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/06/24/ductbank_install_june2025.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/06/24/ductbank_install_june2025.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/06/24/ductbank_install_june2025.png?itok=q9VO4So0]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Map of lane closure of Bobby Dodd Way for installation of ductbank]]></image_alt>                    <created>1750786194</created>          <gmt_created>2025-06-24 17:29:54</gmt_created>          <changed>1750786194</changed>          <gmt_changed>2025-06-24 17:29:54</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>          <keyword tid="13283"><![CDATA[Bobby Dodd Way]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="682717">  <title><![CDATA[Ferst Drive Realignment Project Continues Through June]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The following construction activity will occur from June 11 to June 27:&nbsp;</p><ul><li><strong>Wednesday, June 11</strong><ul><li>Traffic signal cabinet work on 5th Street and Techwood Drive will commence and delays through that intersection and the surrounding areas may occur. Police will assist with directing traffic at the intersection during the replacement of the traffic cabinet.</li></ul></li><li><strong>Monday, June 17 – Friday, June 24</strong><ul><li><p>Milling and paving will occur at the following locations - Ferst Drive from 6th Street to Tech Parkway; and Means Street from Tech Parkway to Marietta Street. The roadway will remain open with flagmen and traffic control devices diverting traffic around the areas.&nbsp;</p><p>See attached graphic for additional information.</p></li></ul></li></ul>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1749221776</created>  <gmt_created>2025-06-06 14:56:16</gmt_created>  <changed>1749236412</changed>  <gmt_changed>2025-06-06 19:00:12</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Traffic signal replacement and paving work will affect travel on campus.]]></teaser>  <type>news</type>  <sentence><![CDATA[Traffic signal replacement and paving work will affect travel on campus.]]></sentence>  <summary><![CDATA[<p>Traffic signal replacement and paving work will affect travel on campus.</p>]]></summary>  <dateline>2025-06-06T00:00:00-04:00</dateline>  <iso_dateline>2025-06-06T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-06-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>677201</item>      </media>  <hg_media>          <item>          <nid>677201</nid>          <type>image</type>          <title><![CDATA[Screenshot-2025-06-05-155022.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Screenshot-2025-06-05-155022.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/06/06/Screenshot-2025-06-05-155022.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/06/06/Screenshot-2025-06-05-155022.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/06/06/Screenshot-2025-06-05-155022.jpg?itok=hPjqd6ev]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics plan for milling and paving of Ferst Drive]]></image_alt>                    <created>1749236302</created>          <gmt_created>2025-06-06 18:58:22</gmt_created>          <changed>1749236302</changed>          <gmt_changed>2025-06-06 18:58:22</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="192185"><![CDATA[Ferst Drive Realignment and Cycle Track]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="682510">  <title><![CDATA[Vehicular Detour for Raised Crosswalk Reconstruction Near Student Center Planned for May 27 – 30]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Vehicular detours will be in place for the week of May 27 – May 30 for the demolition and reconstruction of the raised crosswalk on Ferst Drive near the John C. Lewis Student Center. The reconstruction will occur in two phases. Eastbound traffic will be detoured around the crosswalk via the newly completed bus drop off area. Westbound traffic will detour according to which half of the crosswalk is not under reconstruction. Barring any weather interruptions, Ferst Drive will reopen May 31. Please view the attached logistics map for further details. We appreciate your patience while this campus improvement project continues.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1747949694</created>  <gmt_created>2025-05-22 21:34:54</gmt_created>  <changed>1747950124</changed>  <gmt_changed>2025-05-22 21:42:04</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Detours around the construction of the new raised crosswalk will be in place the last week of May.]]></teaser>  <type>news</type>  <sentence><![CDATA[Detours around the construction of the new raised crosswalk will be in place the last week of May.]]></sentence>  <summary><![CDATA[<p>Detours around the construction of the new raised crosswalk will be in place the last week of May.</p>]]></summary>  <dateline>2025-05-22T00:00:00-04:00</dateline>  <iso_dateline>2025-05-22T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-05-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>677118</item>      </media>  <hg_media>          <item>          <nid>677118</nid>          <type>image</type>          <title><![CDATA[Ferst-Drive-raised-crosswalk-reconstruction-vehicular-detour_may2025jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst-Drive-raised-crosswalk-reconstruction-vehicular-detour_may2025jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/05/22/Ferst-Drive-raised-crosswalk-reconstruction-vehicular-detour_may2025jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/05/22/Ferst-Drive-raised-crosswalk-reconstruction-vehicular-detour_may2025jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/05/22/Ferst-Drive-raised-crosswalk-reconstruction-vehicular-detour_may2025jpg.jpg?itok=HrCK3nuZ]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of vehicular detours for raised pedestrian crosswalk on Ferst Drive]]></image_alt>                    <created>1747949862</created>          <gmt_created>2025-05-22 21:37:42</gmt_created>          <changed>1747949862</changed>          <gmt_changed>2025-05-22 21:37:42</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="192185"><![CDATA[Ferst Drive Realignment and Cycle Track]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="682295">  <title><![CDATA[Curran Street Road Closure Expands to Impact Woodruff Hall and Eighth Street Beginning May 12]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The ongoing Curran Street road closure for the construction of the new residence hall now requires additionally blocking access to the back of Woodruff Hall on Eighth Street beginning May 12. This impact will last until approximately June 9.&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><div><p>&nbsp;</p></div>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1746736412</created>  <gmt_created>2025-05-08 20:33:32</gmt_created>  <changed>1746736780</changed>  <gmt_changed>2025-05-08 20:39:40</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[This additional impact is scheduled to last through June 9.]]></teaser>  <type>news</type>  <sentence><![CDATA[This additional impact is scheduled to last through June 9.]]></sentence>  <summary><![CDATA[<p>This additional impact is scheduled to last through June 9.</p>]]></summary>  <dateline>2025-05-08T00:00:00-04:00</dateline>  <iso_dateline>2025-05-08T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-05-08 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Chris B. Williams</strong></p><p>Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>677050</item>      </media>  <hg_media>          <item>          <nid>677050</nid>          <type>image</type>          <title><![CDATA[Curran-Street-Closure-05.12.2025-to-06.09.2025.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Curran-Street-Closure-05.12.2025-to-06.09.2025.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/05/08/Curran-Street-Closure-05.12.2025-to-06.09.2025.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/05/08/Curran-Street-Closure-05.12.2025-to-06.09.2025.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/05/08/Curran-Street-Closure-05.12.2025-to-06.09.2025.jpg?itok=VQp0CoUo]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics map of Curran Street road closure.]]></image_alt>                    <created>1746736560</created>          <gmt_created>2025-05-08 20:36:00</gmt_created>          <changed>1746736560</changed>          <gmt_changed>2025-05-08 20:36:00</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="194376"><![CDATA[Curran Street Residence Hall]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="682203">  <title><![CDATA[Site Work for Tech Square Phase 3 to Close West Lane of West Peachtree Street for Three Weeks]]></title>  <uid>35028</uid>  <body><![CDATA[<p>As Tech Square Phase 3 construction enters the homestretch, site work will affect the west travel lane and parking on West Peachtree Street.</p><p>Beginning May 5, the west lane and parking along West Peachtree will be closed until May 24. After May 24, the travel lane will reopen but the parking and sidewalk will remain closed until late June. The closure will be 24 hours a day.&nbsp;Please see the attached site plan for further details.</p><p>Thank you for your patience as we move closer to finalization of this new campus addition.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1746200631</created>  <gmt_created>2025-05-02 15:43:51</gmt_created>  <changed>1746201128</changed>  <gmt_changed>2025-05-02 15:52:08</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The west lane of West Peachtree Street and the associated parking will be closed from May 5 to May 24.]]></teaser>  <type>news</type>  <sentence><![CDATA[The west lane of West Peachtree Street and the associated parking will be closed from May 5 to May 24.]]></sentence>  <summary><![CDATA[<p>The west lane of West Peachtree Street and the associated parking will be closed from May 5 to May 24.</p>]]></summary>  <dateline>2025-05-02T00:00:00-04:00</dateline>  <iso_dateline>2025-05-02T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-05-02 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Lindsey Cottingham, PE, LEED AP</p><p>Associate Director - Construction Services</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-433-4268</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>677027</item>          <item>677028</item>      </media>  <hg_media>          <item>          <nid>677027</nid>          <type>image</type>          <title><![CDATA[Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_2.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/05/02/Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/05/02/Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/05/02/Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_2.jpg?itok=7ZgvX8DI]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of site plan for closure of west lane of and parking on West Peachtree street ]]></image_alt>                    <created>1746200650</created>          <gmt_created>2025-05-02 15:44:10</gmt_created>          <changed>1746200650</changed>          <gmt_changed>2025-05-02 15:44:10</gmt_changed>      </item>          <item>          <nid>677028</nid>          <type>image</type>          <title><![CDATA[Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_3.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_3.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/05/02/Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_3.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/05/02/Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_3.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/05/02/Tech-Square-3A---Right-of-Way-Construction-Impact_2025-04-28_W-Peachtree-Only_Page_3.jpg?itok=13kEaTBY]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Site plan for closure of parking along West Peachtree Street for Tech Square Phase 3 project.]]></image_alt>                    <created>1746200756</created>          <gmt_created>2025-05-02 15:45:56</gmt_created>          <changed>1746200756</changed>          <gmt_changed>2025-05-02 15:45:56</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="192181"><![CDATA[Tech Square Phase 3]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="194507"><![CDATA[West Peachtree Street]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="682076">  <title><![CDATA[Construction Activity at Regents and Ferst Drive Require Vehicular and Pedestrian Detours]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The following vehicular/pedestrian circulation changes are due to construction activities at the intersection of Regents Drive and Ferst Drive:</p><ol><li>The walkway on the east side of Regents Drive connecting Tech Parkway and Ferst Drive will be closed starting April 30.</li><li>The walkway on the west side of Regents drive connecting Tech Parkway and Ferst Drive will reopen April 30.</li><li>The walkway on the north side of Tech Parkway from Regents Drive to the Exhibition Hall loading dock driveway will be closed starting May 5.</li><li>The walkway on the east side of Ferst Drive from Regents Drive to the Stamps Health Center will be closed starting May 5.</li><li>Regents Drive is expected to reopen May 12 barring any weather delays.</li><li>Ferst Drive will be closed west of Regents Drive to the Exhibition Hall loading dock driveway starting May 12.</li></ol><p>Please see the attached graphics for detour routes. Thank you for your patience as this campus improvement project continues.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1745847793</created>  <gmt_created>2025-04-28 13:43:13</gmt_created>  <changed>1745848160</changed>  <gmt_changed>2025-04-28 13:49:20</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The Ferst Drive Realignment Project is making progress at Regents Drive and will affect vehicle and pedestrian traffic for approximately two weeks.]]></teaser>  <type>news</type>  <sentence><![CDATA[The Ferst Drive Realignment Project is making progress at Regents Drive and will affect vehicle and pedestrian traffic for approximately two weeks.]]></sentence>  <summary><![CDATA[<p>The Ferst Drive Realignment Project is making progress at Regents Drive and will affect vehicle and pedestrian traffic for approximately two weeks beginning April 30.</p>]]></summary>  <dateline>2025-04-28T00:00:00-04:00</dateline>  <iso_dateline>2025-04-28T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-04-28 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>676957</item>          <item>676958</item>      </media>  <hg_media>          <item>          <nid>676957</nid>          <type>image</type>          <title><![CDATA[FERST-DR-STAGE-3-PHASE-E-SIDEWALK-CLOSURE-Pedestrian-Circulation-April-May-2025-jpeg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[FERST-DR-STAGE-3-PHASE-E-SIDEWALK-CLOSURE-Pedestrian-Circulation-April-May-2025-jpeg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/04/28/FERST-DR-STAGE-3-PHASE-E-SIDEWALK-CLOSURE-Pedestrian-Circulation-April-May-2025-jpeg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/04/28/FERST-DR-STAGE-3-PHASE-E-SIDEWALK-CLOSURE-Pedestrian-Circulation-April-May-2025-jpeg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/04/28/FERST-DR-STAGE-3-PHASE-E-SIDEWALK-CLOSURE-Pedestrian-Circulation-April-May-2025-jpeg.jpg?itok=7ZSGnB8H]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of logistics for detours around Regents Drive and Tech Parkway construction.]]></image_alt>                    <created>1745847811</created>          <gmt_created>2025-04-28 13:43:31</gmt_created>          <changed>1745847811</changed>          <gmt_changed>2025-04-28 13:43:31</gmt_changed>      </item>          <item>          <nid>676958</nid>          <type>image</type>          <title><![CDATA[Ferst-Drive-Realignment-Pedestrian-Circulation-changes-at-Regents-Drive-April-May-2025-jpeg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst-Drive-Realignment-Pedestrian-Circulation-changes-at-Regents-Drive-April-May-2025-jpeg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/04/28/Ferst-Drive-Realignment-Pedestrian-Circulation-changes-at-Regents-Drive-April-May-2025-jpeg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/04/28/Ferst-Drive-Realignment-Pedestrian-Circulation-changes-at-Regents-Drive-April-May-2025-jpeg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/04/28/Ferst-Drive-Realignment-Pedestrian-Circulation-changes-at-Regents-Drive-April-May-2025-jpeg.jpg?itok=jExgc0rf]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of signage posted for Ferst Drive realignment project construction activity at Regents Drive.]]></image_alt>                    <created>1745847908</created>          <gmt_created>2025-04-28 13:45:08</gmt_created>          <changed>1745847908</changed>          <gmt_changed>2025-04-28 13:45:08</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="192185"><![CDATA[Ferst Drive Realignment and Cycle Track]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="194488"><![CDATA[Regents Drive]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="681733">  <title><![CDATA[East Campus Streetscapes Work Continues at Techwood Drive and Fifth Street Intersection April 11]]></title>  <uid>35028</uid>  <body><![CDATA[<p>In preparation for the construction of the new bus stop island at Fifth Street and Techwood Drive, as part of the East Campus Streetscapes project, the contractor will be realigning the centerline of Fifth Street, east of Techwood Drive. Flaggers will be directing traffic through the area, so expect minor delays until work is complete. Please see attached graphic for additional information. We appreciate your patience during these important campus improvement projects.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1744329819</created>  <gmt_created>2025-04-11 00:03:39</gmt_created>  <changed>1744382164</changed>  <gmt_changed>2025-04-11 14:36:04</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Contractors will be realigning Fifth Street to allow for construction of the new bus stop island.]]></teaser>  <type>news</type>  <sentence><![CDATA[Contractors will be realigning Fifth Street to allow for construction of the new bus stop island.]]></sentence>  <summary><![CDATA[<p>Contractors will be realigning Fifth Street to allow for construction of the new bus stop island.</p>]]></summary>  <dateline>2025-04-10T00:00:00-04:00</dateline>  <iso_dateline>2025-04-10T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-04-10 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>676815</item>      </media>  <hg_media>          <item>          <nid>676815</nid>          <type>image</type>          <title><![CDATA[Fifth_street_Lane-Modification-april2025jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Fifth_street_Lane-Modification-april2025jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/04/11/Fifth_street_Lane-Modification-april2025jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/04/11/Fifth_street_Lane-Modification-april2025jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/04/11/Fifth_street_Lane-Modification-april2025jpg.jpg?itok=uCgFzMsw]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for realigning Fifth Street at Techwood Drive]]></image_alt>                    <created>1744382042</created>          <gmt_created>2025-04-11 14:34:02</gmt_created>          <changed>1744382042</changed>          <gmt_changed>2025-04-11 14:34:02</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="681172">  <title><![CDATA[Curran and Ninth Street Closed for Residence Hall Infrastructure Work Through August]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Monday, March 24, a section of 9th Street and Curran Street (including sidewalks) will be closed through August 2025 for multiple utility tie-ins and infrastructure work related to the Curran Street Residence Hall. Parking and Transportation Services will be rerouting bus traffic and detour signage will be installed for vehicular and pedestrian traffic. Thank you for your patience and cooperation during this time.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1741988504</created>  <gmt_created>2025-03-14 21:41:44</gmt_created>  <changed>1742514240</changed>  <gmt_changed>2025-03-20 23:44:00</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Road closures are planned to accommodate infrastructure and utility tie-ins.]]></teaser>  <type>news</type>  <sentence><![CDATA[Road closures are planned to accommodate infrastructure and utility tie-ins.]]></sentence>  <summary><![CDATA[<p>Road closures are planned to start March 24 to accommodate infrastructure and utility tie-ins.</p>]]></summary>  <dateline>2025-03-14T00:00:00-04:00</dateline>  <iso_dateline>2025-03-14T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-03-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Chris B. Williams</strong></p><p>Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;&nbsp;</p><p>470-553-7197</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>676632</item>      </media>  <hg_media>          <item>          <nid>676632</nid>          <type>image</type>          <title><![CDATA[Street_closing_thru_Aug2025.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Street_closing_thru_Aug2025.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/03/20/Street_closing_thru_Aug2025.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/03/20/Street_closing_thru_Aug2025.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/03/20/Street_closing_thru_Aug2025.png?itok=Br5IFgcW]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of planned street closures for Curran Street residence hall construction]]></image_alt>                    <created>1742514120</created>          <gmt_created>2025-03-20 23:42:00</gmt_created>          <changed>1742514120</changed>          <gmt_changed>2025-03-20 23:42:00</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="194376"><![CDATA[Curran Street Residence Hall]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="681171">  <title><![CDATA[Techwood Drive Road Striping Between Fourth and Fifth Streets Planned for March 19]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Road striping is planned for Techwood Drive between Fourth and Fifth streets on Wed., March 19. All traffic will be flagged through the construction area so delays can be expected. Additionally, parking in this area will need to relocate for the day. See attached plan for additional information. Thank you for your patience during this campus improvement project.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1741986812</created>  <gmt_created>2025-03-14 21:13:32</gmt_created>  <changed>1741986812</changed>  <gmt_changed>2025-03-14 21:13:32</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[East Campus streetscape work continues with road striping planned for Techwood Drive.]]></teaser>  <type>news</type>  <sentence><![CDATA[East Campus streetscape work continues with road striping planned for Techwood Drive.]]></sentence>  <summary><![CDATA[<p>East Campus streetscape work continues with road striping planned for Techwood Drive.</p>]]></summary>  <dateline>2025-03-14T00:00:00-04:00</dateline>  <iso_dateline>2025-03-14T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-03-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="188001"><![CDATA[Techwood Drive]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="681086">  <title><![CDATA[East Campus Streetscapes Paving for Fourth, 3rd, and Williams Streets Planned for March 13]]></title>  <uid>35028</uid>  <body><![CDATA[<p>On Thursday March 13, from 9 a.m. to noon, 3rd and Williams Streets will be closed to through traffic for paving operations. Additionally, the Techwood Drive and Fourth street intersection paving will occur from noon to 5 p.m. &nbsp;</p><p>All southbound traffic seeking to access North Avenue will be directed to use Techwood Drive. Flagmen will direct north and south bound traffic on Techwood Drive from Bobby Dodd Way to North Avenue utilizing a single lane. Please see attached graphic for additional information.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1741720989</created>  <gmt_created>2025-03-11 19:23:09</gmt_created>  <changed>1741728240</changed>  <gmt_changed>2025-03-11 21:24:00</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Paving work will require a 3rd Street road closure and adjustments to traffic flow on Techwood Drive between Bobby Dodd Way and North Avenue.]]></teaser>  <type>news</type>  <sentence><![CDATA[Paving work will require a 3rd Street road closure and adjustments to traffic flow on Techwood Drive between Bobby Dodd Way and North Avenue.]]></sentence>  <summary><![CDATA[<p>Milling and paving work will require a 3rd Street road closure and adjustments to traffic flow on Techwood Drive between Bobby Dodd Way and North Avenue.</p>]]></summary>  <dateline>2025-03-11T00:00:00-04:00</dateline>  <iso_dateline>2025-03-11T00:00:00-04:00</iso_dateline>  <gmt_dateline>2025-03-11 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>676520</item>      </media>  <hg_media>          <item>          <nid>676520</nid>          <type>image</type>          <title><![CDATA[Third_and_Williams_Paving-Sequencing-Plan-3-13--2-jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Third_and_Williams_Paving-Sequencing-Plan-3-13--2-jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/03/11/Third_and_Williams_Paving-Sequencing-Plan-3-13--2-jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/03/11/Third_and_Williams_Paving-Sequencing-Plan-3-13--2-jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/03/11/Third_and_Williams_Paving-Sequencing-Plan-3-13--2-jpg.jpg?itok=73kRubyC]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of logistics for paving of Third, Fourth, and Williams streets]]></image_alt>                    <created>1741721301</created>          <gmt_created>2025-03-11 19:28:21</gmt_created>          <changed>1741721301</changed>          <gmt_changed>2025-03-11 19:28:21</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>          <keyword tid="188001"><![CDATA[Techwood Drive]]></keyword>          <keyword tid="194324"><![CDATA[Third Street]]></keyword>          <keyword tid="194373"><![CDATA[Fourth Street]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="680935">  <title><![CDATA[Continued Construction on Ferst Drive to Affect Regents Drive and Techwood/Fifth Street Areas Through Early April]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning March 6, and continuing until early April, construction work will be ongoing at Techwood Drive and Ferst Drive. The sidewalk will be closed on the southside of Ferst Drive and 5th&nbsp;Street from Williams Street to the southwest corner of Ferst Drive and Techwood Drive. Pedestrian traffic will follow an indicated detour. The eastbound bus stop located on Ferst Drive (east of Techwood Drive) will be relocated to Ferst Drive (west of Techwood Drive). Signage will be in place for the safety of the campus community. See the attached logistics plan for more information.&nbsp;</p><p>Additionally, beginning March 6, and continuing until early April, Regents Drive will be closed to vehicular traffice. Vehicular traffic will need to detour via the new connection points on Ferst Drive/Tech Parkway at the Student Center Parking Deck entry and/or the Student Center at State Street. See the attached logistics plan for more information.</p><p>Construction in both areas is expected to last for four weeks.</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1741192119</created>  <gmt_created>2025-03-05 16:28:39</gmt_created>  <changed>1741198863</changed>  <gmt_changed>2025-03-05 18:21:03</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The Ferst Drive Realignment and Connectivity Project enters its final phases.]]></teaser>  <type>news</type>  <sentence><![CDATA[The Ferst Drive Realignment and Connectivity Project enters its final phases.]]></sentence>  <summary><![CDATA[<p>The Ferst Drive Realignment and Connectivity Project enters its final phases.</p>]]></summary>  <dateline>2025-03-05T00:00:00-05:00</dateline>  <iso_dateline>2025-03-05T00:00:00-05:00</iso_dateline>  <gmt_dateline>2025-03-05 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong><br>Landscape Project Manager<br>Planning Design &amp; Construction | Infrastructure &amp; Sustainability&nbsp;<br>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>676466</item>          <item>676467</item>          <item>676465</item>      </media>  <hg_media>          <item>          <nid>676466</nid>          <type>image</type>          <title><![CDATA[2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_2.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/03/05/2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/03/05/2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/03/05/2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_2.jpg?itok=z3NbEf1z]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[logistics plan for Techwood and Ferst phase 4 of cycle track]]></image_alt>                    <created>1741192150</created>          <gmt_created>2025-03-05 16:29:10</gmt_created>          <changed>1741192150</changed>          <gmt_changed>2025-03-05 16:29:10</gmt_changed>      </item>          <item>          <nid>676467</nid>          <type>image</type>          <title><![CDATA[2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_3.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_3.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/03/05/2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_3.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/03/05/2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_3.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/03/05/2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_3.jpg?itok=2W6DKzkk]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[logistics plan for regents drive construction ]]></image_alt>                    <created>1741192150</created>          <gmt_created>2025-03-05 16:29:10</gmt_created>          <changed>1741192150</changed>          <gmt_changed>2025-03-05 16:29:10</gmt_changed>      </item>          <item>          <nid>676465</nid>          <type>image</type>          <title><![CDATA[2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_1.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_1.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/03/05/2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/03/05/2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/03/05/2025-march-map-Regents_Ferst-MOT-Exhibit-Updated--1-jpg_Page_1.jpg?itok=hyX_WJDT]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for regents drive, techwood drive, and fifth street]]></image_alt>                    <created>1741192150</created>          <gmt_created>2025-03-05 16:29:10</gmt_created>          <changed>1741192150</changed>          <gmt_changed>2025-03-05 16:29:10</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="192185"><![CDATA[Ferst Drive Realignment and Cycle Track]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="680252">  <title><![CDATA[East Campus Streetscape Project Nears Completion with Milling and Paving Work]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The East Campus Streetscapes Project will require milling and paving during the next few weeks. Attached are graphics depicting the planned areas with corresponding schedules and logistics. &nbsp;</p><p>Additionally, compaction testing will be performed on an area of roadway between Peters Parking Deck Entrance and Fowler Street requiring a road closure from 7:30 a.m. – 1 p.m. Friday, Feb. 7. Please see attached plan indicating alternate routes around this road closure.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1738791392</created>  <gmt_created>2025-02-05 21:36:32</gmt_created>  <changed>1738791741</changed>  <gmt_changed>2025-02-05 21:42:21</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[As the project nears completion, milling and paving work will require temporary road closures.]]></teaser>  <type>news</type>  <sentence><![CDATA[As the project nears completion, milling and paving work will require temporary road closures.]]></sentence>  <summary><![CDATA[<p>As the project nears completion, milling and paving work will require temporary road closures.</p>]]></summary>  <dateline>2025-02-05T00:00:00-05:00</dateline>  <iso_dateline>2025-02-05T00:00:00-05:00</iso_dateline>  <gmt_dateline>2025-02-05 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction&nbsp;</p><p>Infrastructure and Sustainability</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>676223</item>          <item>676224</item>      </media>  <hg_media>          <item>          <nid>676223</nid>          <type>image</type>          <title><![CDATA[East Campus Streetscape paving Feb 2025jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Campus Streetscape paving Feb 2025jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/02/05/East%20Campus%20Streetscape%20paving%20Feb%202025jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/02/05/East%20Campus%20Streetscape%20paving%20Feb%202025jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/02/05/East%2520Campus%2520Streetscape%2520paving%2520Feb%25202025jpg.jpg?itok=dpdNwoqM]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[image of planned road closure for paving]]></image_alt>                    <created>1738791412</created>          <gmt_created>2025-02-05 21:36:52</gmt_created>          <changed>1738791412</changed>          <gmt_changed>2025-02-05 21:36:52</gmt_changed>      </item>          <item>          <nid>676224</nid>          <type>image</type>          <title><![CDATA[East Campus Site Sequencing Plan 2.2.2025jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Campus Site Sequencing Plan 2.2.2025jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/02/05/East%20Campus%20Site%20Sequencing%20Plan%202.2.2025jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/02/05/East%20Campus%20Site%20Sequencing%20Plan%202.2.2025jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/02/05/East%2520Campus%2520Site%2520Sequencing%2520Plan%25202.2.2025jpg.jpg?itok=_O9AGjG8]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[logistics plan for paving and milling for east campus streetscape project]]></image_alt>                    <created>1738791524</created>          <gmt_created>2025-02-05 21:38:44</gmt_created>          <changed>1738791524</changed>          <gmt_changed>2025-02-05 21:38:44</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>          <keyword tid="194310"><![CDATA[milling and paving]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="679604">  <title><![CDATA[Fire Hydrant Installation Corner of Techwood Drive and 4th Street Planned for Jan. 21]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The City of Atlanta Department of Watershed Management will be installing a new fire hydrant at the corner of Techwood Drive and 4th Street on Tues., Jan. 21.&nbsp;</p><p>During the installation process, water service will be shut down in the surrounding area for a few hours between 8 a.m, – 5 p.m.&nbsp;</p><p>Georgia Tech is waiting on confirmation from the City of Atlanta on which buildings will be affected. Per campus records, it appears those affected will be:&nbsp;</p><ul><li>4th Street Housing&nbsp;</li><li>Chi Psi</li><li>162 4th Street</li><li>Phi Kappa Tau&nbsp;</li><li>Sigma Chi&nbsp;</li><li>Delta Sigma Phi&nbsp;</li><li>Lambda Chi Alpha&nbsp;</li><li>Delta Upsilon&nbsp;</li><li>Phi Kappa Sigma&nbsp;</li><li>Kappa Alpha</li><li>Theta Xi&nbsp;</li><li>Christian Campus Fellowship&nbsp;</li></ul><p>Please plan ahead for this disruption in water service. The safety of our campus community is our top priority. We appreciate your patience as we make these infrastructure improvements.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1736903553</created>  <gmt_created>2025-01-15 01:12:33</gmt_created>  <changed>1736982240</changed>  <gmt_changed>2025-01-15 23:04:00</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Due to the installation by the City of Atlanta Watershed Management, water service will be interrupted to buildings in the surrounding area.]]></teaser>  <type>news</type>  <sentence><![CDATA[Due to the installation by the City of Atlanta Watershed Management, water service will be interrupted to buildings in the surrounding area.]]></sentence>  <summary><![CDATA[<p>Due to the installation by the City of Atlanta Watershed Management, water service will be interrupted to buildings in the surrounding area.</p>]]></summary>  <dateline>2025-01-14T00:00:00-05:00</dateline>  <iso_dateline>2025-01-14T00:00:00-05:00</iso_dateline>  <gmt_dateline>2025-01-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction / Infrastructure and Sustainability</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="194219"><![CDATA[fire hydrant]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="679202">  <title><![CDATA[East Campus Streetscapes Milling and Paving of Fourth Street and Techwood Drive Jan. 13 – 17]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Milling and paving of the final section of Techwood Drive and 4th street will occur during the week of Jan. 13 through Jan. 17.</p><p>During paving, the roads will remain open and traffic will be flagged through the construction area.&nbsp;</p><p>Please see attached graphic for additional information.&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1736191985</created>  <gmt_created>2025-01-06 19:33:05</gmt_created>  <changed>1736284256</changed>  <gmt_changed>2025-01-07 21:10:56</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Work continues on the East Campus Streetscape improvement project.]]></teaser>  <type>news</type>  <sentence><![CDATA[Work continues on the East Campus Streetscape improvement project.]]></sentence>  <summary><![CDATA[<p>Work continues on the East Campus Streetscape improvement project.</p>]]></summary>  <dateline>2025-01-06T00:00:00-05:00</dateline>  <iso_dateline>2025-01-06T00:00:00-05:00</iso_dateline>  <gmt_dateline>2025-01-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-565-3449</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>675949</item>      </media>  <hg_media>          <item>          <nid>675949</nid>          <type>image</type>          <title><![CDATA[Dumpster Pad Paving Sequencing Plan 1.3.25 REV_Page_1 (1).jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Dumpster Pad Paving Sequencing Plan 1.3.25 REV_Page_1 (1).jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/01/06/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/01/06/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/01/06/Dumpster%2520Pad%2520Paving%2520Sequencing%2520Plan%25201.3.25%2520REV_Page_1%2520%25281%2529.jpg?itok=IPXNnJIG]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for milling and paving of Techwood and Fourth Street and 3rd Street and Williams work]]></image_alt>                    <created>1736196343</created>          <gmt_created>2025-01-06 20:45:43</gmt_created>          <changed>1736196343</changed>          <gmt_changed>2025-01-06 20:45:43</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="679209">  <title><![CDATA[Third Street and Williams Street Closed Near the Third Street Tunnel for Utility Installation Jan. 16 – 21]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The installation of sanitary lines for a new dumpster pad along Williams Street will require Third Street and Williams Street to close from Jan. 16 – Jan. 21.&nbsp;</p><p>Because Third Street is currently the detour for traffic heading southbound, Techwood Drive will be open between Bobby Dodd Way and North Avenue during this timeframe. Once complete, the southbound lane will reclose for the continuation of work for the Student Athlete Performance Center.</p><p>Please see the attached graphic for additional information.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1736196911</created>  <gmt_created>2025-01-06 20:55:11</gmt_created>  <changed>1736284192</changed>  <gmt_changed>2025-01-07 21:09:52</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Work continues on the East Campus Streetscape project impacting Third and Williams Street.]]></teaser>  <type>news</type>  <sentence><![CDATA[Work continues on the East Campus Streetscape project impacting Third and Williams Street.]]></sentence>  <summary><![CDATA[<p>Work continues on the East Campus Streetscape project impacting Third and Williams Street.</p>]]></summary>  <dateline>2025-01-06T00:00:00-05:00</dateline>  <iso_dateline>2025-01-06T00:00:00-05:00</iso_dateline>  <gmt_dateline>2025-01-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>675949</item>      </media>  <hg_media>          <item>          <nid>675949</nid>          <type>image</type>          <title><![CDATA[Dumpster Pad Paving Sequencing Plan 1.3.25 REV_Page_1 (1).jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Dumpster Pad Paving Sequencing Plan 1.3.25 REV_Page_1 (1).jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2025/01/06/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2025/01/06/Dumpster%20Pad%20Paving%20Sequencing%20Plan%201.3.25%20REV_Page_1%20%281%29.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2025/01/06/Dumpster%2520Pad%2520Paving%2520Sequencing%2520Plan%25201.3.25%2520REV_Page_1%2520%25281%2529.jpg?itok=IPXNnJIG]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for milling and paving of Techwood and Fourth Street and 3rd Street and Williams work]]></image_alt>                    <created>1736196343</created>          <gmt_created>2025-01-06 20:45:43</gmt_created>          <changed>1736196343</changed>          <gmt_changed>2025-01-06 20:45:43</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="679011">  <title><![CDATA[Pedestrian Detour Around Exhibition Hall Bus Stop Due to Ferst Drive Realignment Project]]></title>  <uid>35028</uid>  <body><![CDATA[<p>As the phased Ferst Drive Realignment project progresses, pedestrians will need to detour around the site of the bus pull-off area near the Exhibition Hall and the ISYE. Portions of the newly completed sidewalk area will be open to allow a pathway around the demolition area. Please see the attached graphic for new routes and duration.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1734643877</created>  <gmt_created>2024-12-19 21:31:17</gmt_created>  <changed>1734644135</changed>  <gmt_changed>2024-12-19 21:35:35</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Demolition of existing bus pull-off area near Exhibition Hall will require pedestrian detour around impacted site.]]></teaser>  <type>news</type>  <sentence><![CDATA[Demolition of existing bus pull-off area near Exhibition Hall will require pedestrian detour around impacted site.]]></sentence>  <summary><![CDATA[<p>Demolition of existing bus pull-off area near Exhibition Hall will require pedestrian detour around impacted site.</p>]]></summary>  <dateline>2024-12-19T00:00:00-05:00</dateline>  <iso_dateline>2024-12-19T00:00:00-05:00</iso_dateline>  <gmt_dateline>2024-12-19 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>675898</item>      </media>  <hg_media>          <item>          <nid>675898</nid>          <type>image</type>          <title><![CDATA[Ferst Drive Exhibition Hall Bus pulloff demojpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst Drive Exhibition Hall Bus pulloff demojpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/12/19/Ferst%20Drive%20Exhibition%20Hall%20Bus%20pulloff%20demojpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/12/19/Ferst%20Drive%20Exhibition%20Hall%20Bus%20pulloff%20demojpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/12/19/Ferst%2520Drive%2520Exhibition%2520Hall%2520Bus%2520pulloff%2520demojpg.jpg?itok=mm9Ebs-Z]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics map for pedestrian detour around Ferst Drive bus pull-off during demolition]]></image_alt>                    <created>1734644040</created>          <gmt_created>2024-12-19 21:34:00</gmt_created>          <changed>1734644040</changed>          <gmt_changed>2024-12-19 21:34:00</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="192185"><![CDATA[Ferst Drive Realignment and Cycle Track]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="678866">  <title><![CDATA[Midtown Complete Street Project to Close Fifth Street Week of Dec. 16 – 20]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Milling and paving of Fifth Street will begin Monday, Dec. 16 and last through Friday, Dec. 20. This work is part of the Midtown Complete Street Project. All businesses along Fifth Street have been notified by the contractor. Attached are the logistics plans for traffic and pedestrian detours during this time.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1734293615</created>  <gmt_created>2024-12-15 20:13:35</gmt_created>  <changed>1734368548</changed>  <gmt_changed>2024-12-16 17:02:28</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Fifth Street will be closed to allow for the completion of the Midtown Complete Street Project. ]]></teaser>  <type>news</type>  <sentence><![CDATA[Fifth Street will be closed to allow for the completion of the Midtown Complete Street Project. ]]></sentence>  <summary><![CDATA[<p>Fifth Street will be closed to allow for the completion of the Midtown Complete Street Project.</p>]]></summary>  <dateline>2024-12-15T00:00:00-05:00</dateline>  <iso_dateline>2024-12-15T00:00:00-05:00</iso_dateline>  <gmt_dateline>2024-12-15 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jason.gregory@cpsm.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jason Gregory, LEED AP</p><p>Institute Landscape Architect</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>678-860-1244</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>675855</item>          <item>675856</item>          <item>675857</item>          <item>675858</item>      </media>  <hg_media>          <item>          <nid>675855</nid>          <type>image</type>          <title><![CDATA[5TH ST_sidewalk closure+sidewalk detour_Ph-1-2JPG_Page_1.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[5TH ST_sidewalk closure+sidewalk detour_Ph-1-2JPG_Page_1.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/12/15/5TH%20ST_sidewalk%20closure%2Bsidewalk%20detour_Ph-1-2JPG_Page_1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/12/15/5TH%20ST_sidewalk%20closure%2Bsidewalk%20detour_Ph-1-2JPG_Page_1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/12/15/5TH%2520ST_sidewalk%2520closure%252Bsidewalk%2520detour_Ph-1-2JPG_Page_1.jpg?itok=sb1SRsR4]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Pedestrian detour route for milling and paving of Fifth Street.]]></image_alt>                    <created>1734293658</created>          <gmt_created>2024-12-15 20:14:18</gmt_created>          <changed>1734293658</changed>          <gmt_changed>2024-12-15 20:14:18</gmt_changed>      </item>          <item>          <nid>675856</nid>          <type>image</type>          <title><![CDATA[5TH ST_sidewalk closure+sidewalk detour_Ph-1-2JPG_Page_2.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[5TH ST_sidewalk closure+sidewalk detour_Ph-1-2JPG_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/12/15/5TH%20ST_sidewalk%20closure%2Bsidewalk%20detour_Ph-1-2JPG_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/12/15/5TH%20ST_sidewalk%20closure%2Bsidewalk%20detour_Ph-1-2JPG_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/12/15/5TH%2520ST_sidewalk%2520closure%252Bsidewalk%2520detour_Ph-1-2JPG_Page_2.jpg?itok=I_O8ZLOb]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Pedestrian detour route for milling and paving of Fifth Street.]]></image_alt>                    <created>1734293745</created>          <gmt_created>2024-12-15 20:15:45</gmt_created>          <changed>1734293745</changed>          <gmt_changed>2024-12-15 20:15:45</gmt_changed>      </item>          <item>          <nid>675857</nid>          <type>image</type>          <title><![CDATA[5TH ST_traffic closure+paving detour_Ph-1-2JPG_Page_1.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[5TH ST_traffic closure+paving detour_Ph-1-2JPG_Page_1.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/12/15/5TH%20ST_traffic%20closure%2Bpaving%20detour_Ph-1-2JPG_Page_1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/12/15/5TH%20ST_traffic%20closure%2Bpaving%20detour_Ph-1-2JPG_Page_1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/12/15/5TH%2520ST_traffic%2520closure%252Bpaving%2520detour_Ph-1-2JPG_Page_1.jpg?itok=0WieXEHR]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Traffic detour route for milling and paving of Fifth Street.]]></image_alt>                    <created>1734293835</created>          <gmt_created>2024-12-15 20:17:15</gmt_created>          <changed>1734293835</changed>          <gmt_changed>2024-12-15 20:17:15</gmt_changed>      </item>          <item>          <nid>675858</nid>          <type>image</type>          <title><![CDATA[5TH ST_traffic closure+paving detour_Ph-1-2JPG_Page_2.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[5TH ST_traffic closure+paving detour_Ph-1-2JPG_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/12/15/5TH%20ST_traffic%20closure%2Bpaving%20detour_Ph-1-2JPG_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/12/15/5TH%20ST_traffic%20closure%2Bpaving%20detour_Ph-1-2JPG_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/12/15/5TH%2520ST_traffic%2520closure%252Bpaving%2520detour_Ph-1-2JPG_Page_2.jpg?itok=L5JwhbXE]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Traffic detour route for milling and paving of Fifth Street.]]></image_alt>                    <created>1734293894</created>          <gmt_created>2024-12-15 20:18:14</gmt_created>          <changed>1734293894</changed>          <gmt_changed>2024-12-15 20:18:14</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="194127"><![CDATA[Midtown Complete Street Project]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="678865">  <title><![CDATA[Road Realignment Project Impacts Ferst Drive and Fowler Street]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Monday, Dec. 16 through Dec. 20, the Ferst Drive Realignment construction team will begin modifying the northwest corner of Ferst Drive and Fowler Street. Improvements to curbing and sidewalks will occur and the current traffic control box will be replaced. The traffic signal will now function as a 4-way stop. Please see attached graphic for locations of closed sidewalks and pedestrian detours.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1734292653</created>  <gmt_created>2024-12-15 19:57:33</gmt_created>  <changed>1734292778</changed>  <gmt_changed>2024-12-15 19:59:38</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Beginning Monday, Dec. 16 through Dec. 20, the Ferst Drive Realignment construction team will begin modifying the northwest corner of Ferst Drive and Fowler Street.]]></teaser>  <type>news</type>  <sentence><![CDATA[Beginning Monday, Dec. 16 through Dec. 20, the Ferst Drive Realignment construction team will begin modifying the northwest corner of Ferst Drive and Fowler Street.]]></sentence>  <summary><![CDATA[<p>Beginning Monday, Dec. 16 through Dec. 20, the Ferst Drive Realignment construction team will begin modifying the northwest corner of Ferst Drive and Fowler Street.</p>]]></summary>  <dateline>2024-12-15T00:00:00-05:00</dateline>  <iso_dateline>2024-12-15T00:00:00-05:00</iso_dateline>  <gmt_dateline>2024-12-15 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jeremiah Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-585-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>675854</item>      </media>  <hg_media>          <item>          <nid>675854</nid>          <type>image</type>          <title><![CDATA[Realignment Project Impacts Ferst Drive and Fowler Street]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst And Fowler Costruction Update121624.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/12/15/Ferst%20And%20Fowler%20Costruction%20Update121624.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/12/15/Ferst%20And%20Fowler%20Costruction%20Update121624.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/12/15/Ferst%2520And%2520Fowler%2520Costruction%2520Update121624.jpg?itok=zFKYdV_y]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Construction impact for Ferst Drive Realignment Project during winter break.]]></image_alt>                    <created>1734292016</created>          <gmt_created>2024-12-15 19:46:56</gmt_created>          <changed>1734292291</changed>          <gmt_changed>2024-12-15 19:51:31</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="192185"><![CDATA[Ferst Drive Realignment and Cycle Track]]></keyword>          <keyword tid="176685"><![CDATA[Ferst Drive]]></keyword>          <keyword tid="193397"><![CDATA[Fowler street]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="678592">  <title><![CDATA[East Campus Streetscape Enters Final Phase with Impacts to 4th Street and Techwood Drive Beginning Nov. 25]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Effective Nov. 25, the final phase of the East Campus Streetscape project will begin with construction of new alignment of the intersection at 4th Street and Techwood Drive. Please see bullet points below outlining access and circulation.</p><ul><li>Techwood Drive north and southbound lanes will remain open at all times.</li><li>4th street to be closed to vehicular through traffic east of Brittain Drive to Techwood Drive. Delta Sigma Phi will have access to their parking lot off 0f 4th Street.</li><li>Sidewalks on 4th Street will be closed east of Sigma Chi and Chi Psi. Pedestrian traffic should use alleyways for east/west access through area.</li><li>See attached diagrams for additional information.&nbsp;</li></ul><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1732213153</created>  <gmt_created>2024-11-21 18:19:13</gmt_created>  <changed>1732553070</changed>  <gmt_changed>2024-11-25 16:44:30</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Beginning Nov. 25, the final phase of East Campus Streetscape will begin with construction of new alignment of intersection at 4th Street and Techwood Drive.]]></teaser>  <type>news</type>  <sentence><![CDATA[Beginning Nov. 25, the final phase of East Campus Streetscape will begin with construction of new alignment of intersection at 4th Street and Techwood Drive.]]></sentence>  <summary><![CDATA[<p>Beginning Nov. 25, the final phase of East Campus Streetscape will begin with construction of new alignment of intersection at 4th Street and Techwood Drive.</p>]]></summary>  <dateline>2024-11-21T00:00:00-05:00</dateline>  <iso_dateline>2024-11-21T00:00:00-05:00</iso_dateline>  <gmt_dateline>2024-11-21 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>675711</item>          <item>675709</item>      </media>  <hg_media>          <item>          <nid>675711</nid>          <type>image</type>          <title><![CDATA[East Campus Streetscape 4th Street and Techwood Detour]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GT East Campus  4th and Techwood reconstruction vehicle rerouting (002).jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/11/21/GT%20East%20Campus%20%204th%20and%20Techwood%20reconstruction%20vehicle%20rerouting%20%28002%29.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/11/21/GT%20East%20Campus%20%204th%20and%20Techwood%20reconstruction%20vehicle%20rerouting%20%28002%29.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/11/21/GT%2520East%2520Campus%2520%25204th%2520and%2520Techwood%2520reconstruction%2520vehicle%2520rerouting%2520%2528002%2529.jpg?itok=JkobMDFI]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Detour route for East Campus Streetscape, Techwood Drive and 4th Street work]]></image_alt>                    <created>1732212616</created>          <gmt_created>2024-11-21 18:10:16</gmt_created>          <changed>1732212872</changed>          <gmt_changed>2024-11-21 18:14:32</gmt_changed>      </item>          <item>          <nid>675709</nid>          <type>image</type>          <title><![CDATA[East Campus Streetscape Final Phase Logistics Map]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Campus Streetscape Phase Two_nov2024_schematicjpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/11/21/East%20Campus%20Streetscape%20Phase%20Two_nov2024_schematicjpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/11/21/East%20Campus%20Streetscape%20Phase%20Two_nov2024_schematicjpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/11/21/East%2520Campus%2520Streetscape%2520Phase%2520Two_nov2024_schematicjpg.jpg?itok=ItpMJ39k]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[logistics map for east campus streetscapes phase 2]]></image_alt>                    <created>1732209276</created>          <gmt_created>2024-11-21 17:14:36</gmt_created>          <changed>1732212587</changed>          <gmt_changed>2024-11-21 18:09:47</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="676060">  <title><![CDATA[Harrison Square Chilled Water System Improvements Ongoing Through Fall Semester]]></title>  <uid>35028</uid>  <body><![CDATA[<p>With the resolution of the chilled water outage, the system is stable and all campus buildings are receiving cool air. The repairs and system improvements needed in Harrison Square, the location of the initial disruption, will require construction fencing and detours around the area for several months.&nbsp;</p><p>Wayfinding maps with detailed pedestrian and ADA detour information will be posted at locations surrounding the site.&nbsp;</p><p>The map below indicates the suggested routes to safely navigate the area.&nbsp;</p><p>Thank you for your patience and flexibility as we work to improve our campus infrastructure.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1724077435</created>  <gmt_created>2024-08-19 14:23:55</gmt_created>  <changed>1729884432</changed>  <gmt_changed>2024-10-25 19:27:12</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The required repair and improvements to the chilled water distribution system will take several months.]]></teaser>  <type>news</type>  <sentence><![CDATA[The required repair and improvements to the chilled water distribution system will take several months.]]></sentence>  <summary><![CDATA[<p>The required repair and improvements to the chilled water distribution system will take several months.</p>]]></summary>  <dateline>2024-08-19T00:00:00-04:00</dateline>  <iso_dateline>2024-08-19T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-08-19 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cathy.brim@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Cathy Brim</p><p>Communications Officer II</p><p>Institute Communications | Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674620</item>      </media>  <hg_media>          <item>          <nid>674620</nid>          <type>image</type>          <title><![CDATA[HarrisonSquare-Detour.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[HarrisonSquare-Detour.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/08/19/HarrisonSquare-Detour.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/08/19/HarrisonSquare-Detour.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/08/19/HarrisonSquare-Detour.jpg?itok=-6OXU6vw]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of pedestrian and ADA detours around Harrison Square construction site]]></image_alt>                    <created>1724077513</created>          <gmt_created>2024-08-19 14:25:13</gmt_created>          <changed>1724077513</changed>          <gmt_changed>2024-08-19 14:25:13</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="193865"><![CDATA[Chilled Water Outage]]></keyword>          <keyword tid="193917"><![CDATA[Harrison Square Construction]]></keyword>          <keyword tid="193728"><![CDATA[I&amp;S News]]></keyword>          <keyword tid="35921"><![CDATA[Facilities Management]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="677565">  <title><![CDATA[Curran Street Closure Oct. 14 – Nov. 4 for New Residence Hall Utility Work]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Monday, Oct. 14, Curran Street (and sidewalks) will be closed for a duration of ~3 weeks for underground utility work related to the construction of the Curran St. Residence Hall.&nbsp;</p><p>Please see the attached logistics and traffic control plan. Georgia Tech Police Department, the Georgia Tech Fire Safety Office, Housing and Residence Life, and Parking and Transportation Services have reviewed and approved this closure.&nbsp;</p><p>Pedestrian and vehicular detour signage is in place for safe travel around the project area.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1728919530</created>  <gmt_created>2024-10-14 15:25:30</gmt_created>  <changed>1729014314</changed>  <gmt_changed>2024-10-15 17:45:14</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Curran Street and sidewalks will be closed for underground utility work for the new Curran Street Residence Hall.]]></teaser>  <type>news</type>  <sentence><![CDATA[Curran Street and sidewalks will be closed for underground utility work for the new Curran Street Residence Hall.]]></sentence>  <summary><![CDATA[<p>Curran Street and sidewalks will be closed for underground utility work for the new Curran Street Residence Hall.</p>]]></summary>  <dateline>2024-10-14T00:00:00-04:00</dateline>  <iso_dateline>2024-10-14T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-10-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Project Manager</p><p>Planning, Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;&nbsp;</p><p>(c)&nbsp;470.553.7197&nbsp;&nbsp;&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>675311</item>      </media>  <hg_media>          <item>          <nid>675311</nid>          <type>image</type>          <title><![CDATA[Curran St. Closure 10.14.2024 Logistics Plan.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Curran St. Closure 10.14.2024 Logistics Plan.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/10/14/Curran%20St.%20Closure%2010.14.2024%20Logistics%20Plan.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/10/14/Curran%20St.%20Closure%2010.14.2024%20Logistics%20Plan.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/10/14/Curran%2520St.%2520Closure%252010.14.2024%2520Logistics%2520Plan.jpg?itok=Hla1PiUQ]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of detour logistics for Curran Street road closure.]]></image_alt>                    <created>1728919715</created>          <gmt_created>2024-10-14 15:28:35</gmt_created>          <changed>1728919715</changed>          <gmt_changed>2024-10-14 15:28:35</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193569"><![CDATA[New Residence Hall]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="676638">  <title><![CDATA[Milling and Paving on Centennial Park Drive Happening This Week]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Milling and paving operations for southbound lanes on Centennial Park Drive from North Avenue to Merrits Ave will be occur Tuesday, Sept. 10. The northbound lanes will occur Wednesday, Sept. 11. Attached please find the detour traffic patterns around the closed lanes while construction is in progress. The affected lanes will be closed daily from 9 a.m. to 5 p.m. The project should be complete by Thursday, Sept. 12, barring any weather delays.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1725896303</created>  <gmt_created>2024-09-09 15:38:23</gmt_created>  <changed>1726079004</changed>  <gmt_changed>2024-09-11 18:23:24</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[As part of the East Campus Streetscape project, milling and paving will include Centennial Park Drive this week.]]></teaser>  <type>news</type>  <sentence><![CDATA[As part of the East Campus Streetscape project, milling and paving will include Centennial Park Drive this week.]]></sentence>  <summary><![CDATA[<p>As part of the East Campus Streetscape project, milling and paving will include Centennial Park Drive this week.</p>]]></summary>  <dateline>2024-09-09T00:00:00-04:00</dateline>  <iso_dateline>2024-09-09T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-09-09 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-565-3449</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674894</item>          <item>674896</item>      </media>  <hg_media>          <item>          <nid>674894</nid>          <type>image</type>          <title><![CDATA[Centennial Olympic Park Dr NW Paving (south)png.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Centennial Olympic Park Dr NW Paving (south)png.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/09/09/Centennial%20Olympic%20Park%20Dr%20NW%20Paving%20%28south%29png.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/09/09/Centennial%20Olympic%20Park%20Dr%20NW%20Paving%20%28south%29png.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/09/09/Centennial%2520Olympic%2520Park%2520Dr%2520NW%2520Paving%2520%2528south%2529png.png?itok=D1TaxSSA]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of detour for construction work occurring on Centennial Park Drive]]></image_alt>                    <created>1725896486</created>          <gmt_created>2024-09-09 15:41:26</gmt_created>          <changed>1725896486</changed>          <gmt_changed>2024-09-09 15:41:26</gmt_changed>      </item>          <item>          <nid>674896</nid>          <type>image</type>          <title><![CDATA[Centennial Olympic Park Dr NW Pavingpng.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Centennial Olympic Park Dr NW Pavingpng.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/09/09/Centennial%20Olympic%20Park%20Dr%20NW%20Pavingpng.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/09/09/Centennial%20Olympic%20Park%20Dr%20NW%20Pavingpng.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/09/09/Centennial%2520Olympic%2520Park%2520Dr%2520NW%2520Pavingpng.png?itok=M79I5PSL]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of detour for construction during milling and paving on Centennial Park Drive]]></image_alt>                    <created>1725896570</created>          <gmt_created>2024-09-09 15:42:50</gmt_created>          <changed>1725896570</changed>          <gmt_changed>2024-09-09 15:42:50</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>          <keyword tid="193945"><![CDATA[Camps Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="676184">  <title><![CDATA[Crane for Women's Walk Construction to Mobilize August 28]]></title>  <uid>35028</uid>  <body><![CDATA[<p>As work continues for the Pathway of Progress: Celebrating Georgia Tech Women installation, a crane will be set-up and active on site beginning Wednesday, August 28 &nbsp;through Friday, August 30, from 7 a.m. to 5 p.m. daily, to facilitate the project’s construction.&nbsp; There will be a total of 2 (two) delivery trucks that will enter and exit the barricaded, controlled-access zone daily. &nbsp;Each evening, the crane will remain on site, secured and locked, with red caution tape around the crane’s swing perimeter.</p><p>For the safety of students, faculty and staff, the contractor will have the perimeter of the area barricaded with no pedestrian access. Flaggers will guide both the crane and the delivery trucks as they enter and depart the barricaded area from the parking lot.&nbsp; All pedestrians will be directed to the alternate routes as show in red on the Site Layout &amp; Logistics Plan.</p><p>Below is a diagram of the crane location and pedestrian detour.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1724365767</created>  <gmt_created>2024-08-22 22:29:27</gmt_created>  <changed>1724365949</changed>  <gmt_changed>2024-08-22 22:32:29</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[To continue construction for this campus installation, a crane will be utilized for several days on site.]]></teaser>  <type>news</type>  <sentence><![CDATA[To continue construction for this campus installation, a crane will be utilized for several days on site.]]></sentence>  <summary><![CDATA[<p>To continue construction for this campus installation, a crane will be utilized for several days on site.</p>]]></summary>  <dateline>2024-08-22T00:00:00-04:00</dateline>  <iso_dateline>2024-08-22T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-08-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[carla.barbour@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Carla Barbour, PMP, LEED AP</strong></p><p>&nbsp;Sr. Project Manager | Planning, Design &amp; Construction</p><p>Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674695</item>      </media>  <hg_media>          <item>          <nid>674695</nid>          <type>image</type>          <title><![CDATA[crane_mobilization_logistics.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[crane_mobilization_logistics.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/08/22/crane_mobilization_logistics.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/08/22/crane_mobilization_logistics.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/08/22/crane_mobilization_logistics.png?itok=BCe_xBpw]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of logistics for crane mobilization at Women's Walk site]]></image_alt>                    <created>1724365839</created>          <gmt_created>2024-08-22 22:30:39</gmt_created>          <changed>1724365839</changed>          <gmt_changed>2024-08-22 22:30:39</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://news.gatech.edu/features/2024/03/celebrating-georgia-tech-women?utm_source=newsletter&amp;utm_medium=email&amp;utm_content=Full%20Story%0A&amp;utm_campaign=Daily%20Digest%20-%20March%2027%2C%202024]]></url>        <title><![CDATA[Read more about the Pathway of Progress: Celebrating Georgia Tech Women]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="193775"><![CDATA[Pathway of Progress: Celebrating Georgia Tech Women]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675725">  <title><![CDATA[East Campus Streetscape Paving Project Impacts Techwood Drive and Third Street]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Due to the constraints of the project sites on Techwood Drive and Third Street, current plans will minimize disruption and finalize before east campus Fall move-in on August 10th and 11th.&nbsp;</p><ul type="disc"><li>Paving on Techwood Drive, from Bobby Dodd Way to North Avenue will occur this Saturday, August 3, with <strong>Full</strong> road closure.</li><li>Milling and paving of Third Street will occur on Wednesday, August 7, &nbsp;with full road closure all day.&nbsp;</li><li>While Third Street is closed, traffic on Techwood Drive between Bobby Dodd and North Avenue will only run southbound.</li></ul><p>Thanks for your patience while this work is completed.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1722531086</created>  <gmt_created>2024-08-01 16:51:26</gmt_created>  <changed>1722627968</changed>  <gmt_changed>2024-08-02 19:46:08</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Activity in this area is targeted for completion before Fall move-in.]]></teaser>  <type>news</type>  <sentence><![CDATA[Activity in this area is targeted for completion before Fall move-in.]]></sentence>  <summary><![CDATA[<p>Activity in this area is targeted for completion before Fall move-in.</p>]]></summary>  <dateline>2024-08-01T00:00:00-04:00</dateline>  <iso_dateline>2024-08-01T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-08-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674476</item>          <item>674477</item>      </media>  <hg_media>          <item>          <nid>674476</nid>          <type>image</type>          <title><![CDATA[East Campus Streetscape Aug 1 logisticspng.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Campus Streetscape Aug 1 logisticspng.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/08/01/East%20Campus%20Streetscape%20Aug%201%20logisticspng.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/08/01/East%20Campus%20Streetscape%20Aug%201%20logisticspng.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/08/01/East%2520Campus%2520Streetscape%2520Aug%25201%2520logisticspng.png?itok=F3vvxaha]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[logistics plan for paving Techwood Drive]]></image_alt>                    <created>1722531362</created>          <gmt_created>2024-08-01 16:56:02</gmt_created>          <changed>1722531362</changed>          <gmt_changed>2024-08-01 16:56:02</gmt_changed>      </item>          <item>          <nid>674477</nid>          <type>image</type>          <title><![CDATA[East Campus Streetscape Sequence Plan Aug 1png.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Campus Streetscape Sequence Plan Aug 1png.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/08/01/East%20Campus%20Streetscape%20Sequence%20Plan%20Aug%201png.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/08/01/East%20Campus%20Streetscape%20Sequence%20Plan%20Aug%201png.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/08/01/East%2520Campus%2520Streetscape%2520Sequence%2520Plan%2520Aug%25201png.png?itok=sYWO3-al]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Logistics plan for paving Techwood Drive]]></image_alt>                    <created>1722531481</created>          <gmt_created>2024-08-01 16:58:01</gmt_created>          <changed>1722531481</changed>          <gmt_changed>2024-08-01 16:58:01</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675453">  <title><![CDATA[Portions of Bobby Dodd Way Partially Closed July 15 – August 5 for Student Athlete Performance Center Crane Demobilization and Utilities Work]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning July 15, two phases of construction work for the Student Athlete Performance Center will partially close Bobby Dodd Way in two separate areas.</p><p>Phase 1 (July 15 - 20) will close Bobby Dodd Way from Techwood Drive to just west of Fowler Street.&nbsp;</p><p>Phase 2 (July 20 - August 5) will close Bobby Dodd Way from Techwood Drive to just east of Brittain Drive.&nbsp;</p><p>Please refer to the attached maps for specific details.&nbsp;</p><p>Flaggers and police assistance will ensure the safety of the area during this timeframe.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1721013363</created>  <gmt_created>2024-07-15 03:16:03</gmt_created>  <changed>1722627902</changed>  <gmt_changed>2024-08-02 19:45:02</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Two separate portions of Bobby Dodd Way will be partially closed for ongoing Student Athlete Performance Center construction.]]></teaser>  <type>news</type>  <sentence><![CDATA[Two separate portions of Bobby Dodd Way will be partially closed for ongoing Student Athlete Performance Center construction.]]></sentence>  <summary><![CDATA[<p>Two separate portions of Bobby Dodd Way will be partially closed for ongoing Student Athlete Performance Center construction.</p>]]></summary>  <dateline>2024-07-14T00:00:00-04:00</dateline>  <iso_dateline>2024-07-14T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-07-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Heather.Hardie@faciilties.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Heather Hardie</p><p>Senior Construction Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>470-553-6469</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674345</item>          <item>674346</item>      </media>  <hg_media>          <item>          <nid>674345</nid>          <type>image</type>          <title><![CDATA[2024-07-02 Road Closure Crane Demob  Water  Storm Utility Taps_Page_2.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[2024-07-02 Road Closure Crane Demob  Water  Storm Utility Taps_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/14/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/14/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/14/2024-07-02%2520Road%2520Closure%2520Crane%2520Demob%2520%2520Water%2520%2520Storm%2520Utility%2520Taps_Page_2.jpg?itok=XltubEWM]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics plan for Bobby Dodd Way closure for crane demobilization and utilities work.]]></image_alt>                    <created>1721013902</created>          <gmt_created>2024-07-15 03:25:02</gmt_created>          <changed>1721013902</changed>          <gmt_changed>2024-07-15 03:25:02</gmt_changed>      </item>          <item>          <nid>674346</nid>          <type>image</type>          <title><![CDATA[2024-07-02 Road Closure Crane Demob  Water  Storm Utility Taps_Page_3.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[2024-07-02 Road Closure Crane Demob  Water  Storm Utility Taps_Page_3.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/14/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_3.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/14/2024-07-02%20Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps_Page_3.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/14/2024-07-02%2520Road%2520Closure%2520Crane%2520Demob%2520%2520Water%2520%2520Storm%2520Utility%2520Taps_Page_3.jpg?itok=nla3cYWf]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics for road closure of Bobby Dodd Way for Student Athlete Performance Center construction.]]></image_alt>                    <created>1721014009</created>          <gmt_created>2024-07-15 03:26:49</gmt_created>          <changed>1721014009</changed>          <gmt_changed>2024-07-15 03:26:49</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="187097"><![CDATA[Facilities Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="13283"><![CDATA[Bobby Dodd Way]]></keyword>          <keyword tid="192186"><![CDATA[Student Athlete Performance Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674989">  <title><![CDATA[UPDATE: East Campus Streetscape Project Makes Steady Progress]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>UPDATE:&nbsp;</strong></p><p>The Georgia Department of Transportation (GDOT) approved the permit for the East Campus Streetscapes project to activate at the corners of Techwood Drive and North Avenue. Adjustments are being made to shorten the distance between corners providing a safer route for pedestrians and the cycle track. New curb lines and ADA ramps will also be installed. Work on the northern corners will be complete by July 26 and construction will move to the southern corners. All corners should be open by August 9 barring any weather delays.&nbsp;</p><p>The two north/south crosswalks on North Avenue will be closed and pedestrians will need to cross North Avenue at either Williams Street or in front of the Alumni House.&nbsp;</p><p>Work will occur Monday through Friday from 9 a.m. to 3 p.m. and Saturday/Sunday 4 a.m. to 6 p.m.&nbsp;</p><p>Please see the associated logistics plan for the foot traffic detours for this area of construction.</p><p>Concurrent to this work (beginning approximately July 17), streetscape improvements will also be made between 4th and 5th Streets (area F1 on the map) in an effort to keep the overall East Campus Streetscapes project schedule intact. Please see the attached updated sequencing plan and traffic plan for these specific construction parameters and timelines. &nbsp;</p><p>Driveway and alleyway access from Techwood Drive for Greek parking will be closed. All traffic will need to enter via the alleyway off of Fowler street. It is imperative that the area in the middle of the Greek lots remain open to allow access to both lots.&nbsp;</p><p>Plans for accessing the dumpster for waste management are in development.</p><p>Please pardon our progress as we make these important campus improvements.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1717515016</created>  <gmt_created>2024-06-04 15:30:16</gmt_created>  <changed>1721771865</changed>  <gmt_changed>2024-07-23 21:57:45</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[This campus improvement project is now active at the corners of Techwood Drive and North Avenue.]]></teaser>  <type>news</type>  <sentence><![CDATA[This campus improvement project is now active at the corners of Techwood Drive and North Avenue.]]></sentence>  <summary><![CDATA[<p>This campus improvement project is now active at the corners of Techwood Drive and North Avenue.&nbsp;</p>]]></summary>  <dateline>2024-06-04T00:00:00-04:00</dateline>  <iso_dateline>2024-06-04T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-06-04 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674135</item>          <item>674364</item>          <item>674370</item>          <item>674365</item>          <item>674415</item>      </media>  <hg_media>          <item>          <nid>674135</nid>          <type>image</type>          <title><![CDATA[East Campus Streetscape Techwood Drive between 4th and 5th Street Traffic Plan]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Campus Streetscape June 3 Traffic Plan Area &#039;F&#039; (1).jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/06/04/East%20Campus%20Streetscape%20June%203%20Traffic%20Plan%20Area%20%27F%27%20%281%29.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/06/04/East%20Campus%20Streetscape%20June%203%20Traffic%20Plan%20Area%20%27F%27%20%281%29.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/06/04/East%2520Campus%2520Streetscape%2520June%25203%2520Traffic%2520Plan%2520Area%2520%2527F%2527%2520%25281%2529.jpg?itok=F81M0RV-]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Traffic Plan for East Campus Streetscape Improvements]]></image_alt>                    <created>1717515602</created>          <gmt_created>2024-06-04 15:40:02</gmt_created>          <changed>1717515749</changed>          <gmt_changed>2024-06-04 15:42:29</gmt_changed>      </item>          <item>          <nid>674364</nid>          <type>image</type>          <title><![CDATA[East Campus Streetscapes_Nort Ave. Foot Traffic Planjpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Campus Streetscapes_Nort Ave. Foot Traffic Planjpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/16/East%20Campus%20Streetscapes_Nort%20Ave.%20Foot%20Traffic%20Planjpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/16/East%20Campus%20Streetscapes_Nort%20Ave.%20Foot%20Traffic%20Planjpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/16/East%2520Campus%2520Streetscapes_Nort%2520Ave.%2520Foot%2520Traffic%2520Planjpg.jpg?itok=BYZJ_R9a]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics plan for foot traffic detour during project work at the northern corners of North Avenue and Techwood Drive.]]></image_alt>                    <created>1721155049</created>          <gmt_created>2024-07-16 18:37:29</gmt_created>          <changed>1721155049</changed>          <gmt_changed>2024-07-16 18:37:29</gmt_changed>      </item>          <item>          <nid>674370</nid>          <type>image</type>          <title><![CDATA[GDOT Permit Sequencing Update JULY_jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GDOT Permit Sequencing Update JULY_jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/17/GDOT%20Permit%20Sequencing%20Update%20JULY_jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/17/GDOT%20Permit%20Sequencing%20Update%20JULY_jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/17/GDOT%2520Permit%2520Sequencing%2520Update%2520JULY_jpg.jpg?itok=Ah8Up6f4]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics for East Campus Streetscapes Techwood and North Avenue area]]></image_alt>                    <created>1721237540</created>          <gmt_created>2024-07-17 17:32:20</gmt_created>          <changed>1721237540</changed>          <gmt_changed>2024-07-17 17:32:20</gmt_changed>      </item>          <item>          <nid>674365</nid>          <type>image</type>          <title><![CDATA[Phase 2 Sequencing Plan JULY_jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Phase 2 Sequencing Plan JULY_jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/16/Phase%202%20Sequencing%20Plan%20JULY_jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/16/Phase%202%20Sequencing%20Plan%20JULY_jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/16/Phase%25202%2520Sequencing%2520Plan%2520JULY_jpg.jpg?itok=9mgsIEQL]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics plan for sequencing of projects along Techwood Drive for East Campus Streetscape projects.]]></image_alt>                    <created>1721158091</created>          <gmt_created>2024-07-16 19:28:11</gmt_created>          <changed>1721158091</changed>          <gmt_changed>2024-07-16 19:28:11</gmt_changed>      </item>          <item>          <nid>674415</nid>          <type>image</type>          <title><![CDATA[East Campus North Avenue Southeast and Southwest Corners Pedestrian routing.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Campus North Avenue Southeast and Southwest Corners Pedestrian routing.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/23/East%20Campus%20North%20Avenue%20Southeast%20and%20Southwest%20Corners%20Pedestrian%20routing.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/23/East%20Campus%20North%20Avenue%20Southeast%20and%20Southwest%20Corners%20Pedestrian%20routing.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/23/East%2520Campus%2520North%2520Avenue%2520Southeast%2520and%2520Southwest%2520Corners%2520Pedestrian%2520routing.jpg?itok=R47QhRK0]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[image of logistics plan for pedestrian detour during construction at North Avenue and Techwood Drive ]]></image_alt>                    <created>1721771266</created>          <gmt_created>2024-07-23 21:47:46</gmt_created>          <changed>1721771266</changed>          <gmt_changed>2024-07-23 21:47:46</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675559">  <title><![CDATA[Phase 3 of the Ferst Drive Realignment and Cycle Track Project Begins]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Ferst Drive realignment, safety, and connectivity project will provide improved bicycle infrastructure and allow for separation between bikes, pedestrians, and vehicles along this campus corridor. This project will also address the realignment of Ferst Drive at Regents Drive, which will ultimately eliminate the traffic signal and enable connectivity to the planned bicycle infrastructure southwest of campus. A cycle track will be installed along Ferst Drive, providing improved safety and separation between cycles and buses at the bus stops.</p><p>Phase 3 begins Monday, July 22. The attached plans signify construction limits and pedestrian circulation routes around the installed construction fencing. As Phase 3 begins, milling and paving operations will continue for Phases 1 and 2. &nbsp;Expect delays traveling through these areas.&nbsp;</p><p>Please pardon our progress as we strive to improve the safety and connectivity of campus.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1721676973</created>  <gmt_created>2024-07-22 19:36:13</gmt_created>  <changed>1721677693</changed>  <gmt_changed>2024-07-22 19:48:13</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction begins for this project in the area of the CRC, Groseclose, the ISYE Annex, and Exhibition Hall.]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction begins for this project in the area of the CRC, Groseclose, the ISYE Annex, and Exhibition Hall.]]></sentence>  <summary><![CDATA[<p>Construction begins for this project in the area of the CRC, Groseclose, the ISYE Annex, and Exhibition Hall.</p>]]></summary>  <dateline>2024-07-22T00:00:00-04:00</dateline>  <iso_dateline>2024-07-22T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-07-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674398</item>          <item>674399</item>          <item>674400</item>      </media>  <hg_media>          <item>          <nid>674398</nid>          <type>image</type>          <title><![CDATA[Ferst Dr Render-07-22 Construction zone_july2024jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst Dr Render-07-22 Construction zone_july2024jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/22/Ferst%20Dr%20Render-07-22%20Construction%20zone_july2024jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/22/Ferst%20Dr%20Render-07-22%20Construction%20zone_july2024jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/22/Ferst%2520Dr%2520Render-07-22%2520Construction%2520zone_july2024jpg.jpg?itok=Zm7Hr5H9]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for construction zone Ferst Drive Phase 3]]></image_alt>                    <created>1721677344</created>          <gmt_created>2024-07-22 19:42:24</gmt_created>          <changed>1721677344</changed>          <gmt_changed>2024-07-22 19:42:24</gmt_changed>      </item>          <item>          <nid>674399</nid>          <type>image</type>          <title><![CDATA[Ferst Dr Render-Phases_July2024jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst Dr Render-Phases_July2024jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/22/Ferst%20Dr%20Render-Phases_July2024jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/22/Ferst%20Dr%20Render-Phases_July2024jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/22/Ferst%2520Dr%2520Render-Phases_July2024jpg.jpg?itok=MhjJQ2k5]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of construction phase timeline for Ferst Drive Realignment project]]></image_alt>                    <created>1721677445</created>          <gmt_created>2024-07-22 19:44:05</gmt_created>          <changed>1721677445</changed>          <gmt_changed>2024-07-22 19:44:05</gmt_changed>      </item>          <item>          <nid>674400</nid>          <type>image</type>          <title><![CDATA[Ferst Drive Realignmernt Phase 3 Pedestrian Circulation_july2024jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst Drive Realignmernt Phase 3 Pedestrian Circulation_july2024jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/22/Ferst%20Drive%20Realignmernt%20Phase%203%20Pedestrian%20Circulation_july2024jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/22/Ferst%20Drive%20Realignmernt%20Phase%203%20Pedestrian%20Circulation_july2024jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/22/Ferst%2520Drive%2520Realignmernt%2520Phase%25203%2520Pedestrian%2520Circulation_july2024jpg.jpg?itok=lJAeIAbY]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of pedestrian circulation for Ferst Drive Realignment Project Phase 3]]></image_alt>                    <created>1721677572</created>          <gmt_created>2024-07-22 19:46:12</gmt_created>          <changed>1721677572</changed>          <gmt_changed>2024-07-22 19:46:12</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192185"><![CDATA[Ferst Drive Realignment and Cycle Track]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675070">  <title><![CDATA[UPDATE: FINAL Concrete Pour for the Pathway of Progress: Celebrating Georgia Tech Women Scheduled for July 24]]></title>  <uid>35028</uid>  <body><![CDATA[<p>As the Pathway of Progress: Celebrating Georgia Tech Women project moves forward, a concrete pump is scheduled to be near the Student Center and the Campanile on Wednesday, July 24 for the final concrete pour. There will be a total of 4 concrete trucks that will come in and out of the barricaded controlled access zone. The concrete pour will take place at 10am. The boom truck will sit adjacent to the site for a span of 3–4 hours.&nbsp;</p><p>For the safety or the students and faculty, the contractor will have the perimeter of the area where the pump and concrete trucks will be, barricaded with no pedestrian access. Flaggers will accompany the the trucks as the enter and exit the barricaded area to and from the parking lot. Students and pedestrians will be re-routed to the alternate routes as shown in red on the site layout and logistics plan.</p><p>We appreciate your flexibility and understanding as we move forward on this notable addition to campus.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1718034627</created>  <gmt_created>2024-06-10 15:50:27</gmt_created>  <changed>1721145900</changed>  <gmt_changed>2024-07-16 16:05:00</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The Pathway continues to take shape with upcoming additional concrete pours. ]]></teaser>  <type>news</type>  <sentence><![CDATA[The Pathway continues to take shape with upcoming additional concrete pours. ]]></sentence>  <summary><![CDATA[<p>The Pathway continues to take shape with upcoming additional concrete pours.&nbsp;</p>]]></summary>  <dateline>2024-06-10T00:00:00-04:00</dateline>  <iso_dateline>2024-06-10T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-06-10 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Lindsey Cottingham</strong></p><p>Capital Projects Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability &nbsp;</p><p>404-433-4268</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674192</item>      </media>  <hg_media>          <item>          <nid>674192</nid>          <type>image</type>          <title><![CDATA[Women's Walk Concrete Pour Logistics Plan for June 21 and 28]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[womens_walk_concrete_pour_june2128.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/06/17/womens_walk_concrete_pour_june2128.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/06/17/womens_walk_concrete_pour_june2128.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/06/17/womens_walk_concrete_pour_june2128.jpg?itok=QY6d8Yu7]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of logistics for concrete pour for Pathway to Progress: Celebrating Georgia Tech Women]]></image_alt>                    <created>1718638954</created>          <gmt_created>2024-06-17 15:42:34</gmt_created>          <changed>1718640744</changed>          <gmt_changed>2024-06-17 16:12:24</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://news.gatech.edu/features/2024/03/celebrating-georgia-tech-women]]></url>        <title><![CDATA[Learn More]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="193775"><![CDATA[Pathway of Progress: Celebrating Georgia Tech Women]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675352">  <title><![CDATA[Preparations for Construction of New Residence Hall Begin July 15]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Monday July 15th, 2024, the Woodruff parking lot near Woodruff Hall and the landscape/waste management service yard will be closed for the construction of the new Curran Street Residence Hall.&nbsp;</p><p>Site fencing will be mobilized resulting in no access to these locations other than a slight overlap for the movement of the landscape services lot to their new location.</p><p>The sidewalk on the west side of Curran Street will be closed. Pedestrians can use the sidewalk on the east side of Curran Street &nbsp;Curran Street will be open to vehicular traffic.</p><p>Please reach out to the project manager if you have any immediate concerns. All parking questions regarding the Woodruff lot should be directed to Parking and Transportation Services at <a href="pts.gatech.edu">pts.gatech.edu</a>.</p><p>The relocated landscape and waste management service yard can be found off of Tech Parkway behind the Environmental Health and Safety Building.&nbsp;</p><p>Please pardon our progress as we begin work on this exciting new campus addition.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1720034572</created>  <gmt_created>2024-07-03 19:22:52</gmt_created>  <changed>1720044267</changed>  <gmt_changed>2024-07-03 22:04:27</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The Woodruff parking lot will no longer be accessible due to the construction of the new Curran Street residence hall.]]></teaser>  <type>news</type>  <sentence><![CDATA[The Woodruff parking lot will no longer be accessible due to the construction of the new Curran Street residence hall.]]></sentence>  <summary><![CDATA[<p>The Woodruff parking lot will no longer be accessible due to the construction of the new Curran Street residence hall.</p>]]></summary>  <dateline>2024-07-03T00:00:00-04:00</dateline>  <iso_dateline>2024-07-03T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-07-03 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Chris B. Williams</strong></p><p>Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;&nbsp;</p><p>(c)&nbsp;470.553.7197&nbsp;&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674300</item>          <item>674301</item>          <item>674302</item>      </media>  <hg_media>          <item>          <nid>674300</nid>          <type>image</type>          <title><![CDATA[site_fencing_logistics.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[site_fencing_logistics.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/03/site_fencing_logistics.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/03/site_fencing_logistics.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/03/site_fencing_logistics.png?itok=xl6W_d38]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Logistics plan for site fencing for new residence hall.]]></image_alt>                    <created>1720043558</created>          <gmt_created>2024-07-03 21:52:38</gmt_created>          <changed>1720043558</changed>          <gmt_changed>2024-07-03 21:52:38</gmt_changed>      </item>          <item>          <nid>674301</nid>          <type>image</type>          <title><![CDATA[building_footprint.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[building_footprint.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/03/building_footprint.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/03/building_footprint.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/03/building_footprint.jpg?itok=MZXKscZA]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Outline of building footprint for new residence hall]]></image_alt>                    <created>1720043768</created>          <gmt_created>2024-07-03 21:56:08</gmt_created>          <changed>1720043768</changed>          <gmt_changed>2024-07-03 21:56:08</gmt_changed>      </item>          <item>          <nid>674302</nid>          <type>image</type>          <title><![CDATA[site_plan.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[site_plan.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/03/site_plan.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/03/site_plan.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/03/site_plan.jpg?itok=0sq5o2Qa]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Site plan for construction of new residence hall]]></image_alt>                    <created>1720043880</created>          <gmt_created>2024-07-03 21:58:00</gmt_created>          <changed>1720043880</changed>          <gmt_changed>2024-07-03 21:58:00</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://www.gatech.edu/news/2023/02/16/georgia-tech-moves-forward-plans-construct-new-student-housing]]></url>        <title><![CDATA[Learn more about the new residence hall]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="187097"><![CDATA[Facilities Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="193569"><![CDATA[New Residence Hall]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675287">  <title><![CDATA[Streetscape Improvements To Close Portions of Northside Drive Sidewalk Near 10th Street]]></title>  <uid>35028</uid>  <body><![CDATA[<p>As we work to improve campus infrastructure, a portion of the sidewalk along 10th Street near Northside Drive will be closed to install granite curbing on the back side of the recently installed sidewalk. This work is part of the Northside Drive and 10th Street Monument Entry Sign project.</p><p>&nbsp;The closure will be identical to previous closures, however, this will be sidewalk closure only with no road/lane shutdowns. Traffic patterns will remain normal. The work is expected to take approximately 2-3 weeks pending weather.&nbsp;</p><p>Please contact me if you have any questions or concerns on this project. Thank you for your patience and flexibility as we strive for continuous improvement to campus.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1719855404</created>  <gmt_created>2024-07-01 17:36:44</gmt_created>  <changed>1719855559</changed>  <gmt_changed>2024-07-01 17:39:19</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Beginning Monday, July 8 sidewalk improvements require closure for two to three weeks.]]></teaser>  <type>news</type>  <sentence><![CDATA[Beginning Monday, July 8 sidewalk improvements require closure for two to three weeks.]]></sentence>  <summary><![CDATA[<p>Beginning Monday, July 8 sidewalk improvements require closure for two to three weeks.</p>]]></summary>  <dateline>2024-07-01T00:00:00-04:00</dateline>  <iso_dateline>2024-07-01T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-07-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Chris B. Williams</strong></p><p>Project Manager</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;&nbsp;</p><p>(c)&nbsp;470.553.7197&nbsp;&nbsp;&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674278</item>      </media>  <hg_media>          <item>          <nid>674278</nid>          <type>image</type>          <title><![CDATA[northside_tenth_sidewalk_july2024.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[northside_tenth_sidewalk_july2024.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/07/01/northside_tenth_sidewalk_july2024.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/07/01/northside_tenth_sidewalk_july2024.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/07/01/northside_tenth_sidewalk_july2024.png?itok=3D81HwgA]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[logistics plan for sidewalk work on Northside and 10th street]]></image_alt>                    <created>1719855464</created>          <gmt_created>2024-07-01 17:37:44</gmt_created>          <changed>1719855464</changed>          <gmt_changed>2024-07-01 17:37:44</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="42291"><![CDATA[northside drive]]></keyword>          <keyword tid="14938"><![CDATA[10th Street]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675128">  <title><![CDATA[Tech Square Phase 3 Utility Work Affects Intersection of Fifth Street and Spring Street]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Additional work at the Northeast corner of 5th and Spring Street will commence on <strong>Monday, June 17th.</strong></p><p>&nbsp;Please be aware of the following work and its subsequent impacts:</p><ul type="disc"><li>Traffic patterns will remain unchanged from the current pattern, with no anticipated adjustments. As a reminder, both lanes of 5th street are closed from 7 am to 4 pm.&nbsp;</li><li>The northern sidewalk of 5th Street will now be closed until the building is finished.&nbsp; The southern sidewalk will remain open.</li><li>The bookstore entrance will remain open with localized barricades near the entrance.</li><li>Restaurants will continue to maintain vehicle access from W. Peachtree for deliveries/to-go pick-up.</li><li>Depending on the underground findings, the covered walkway on Spring St may be temporarily closed for safety reasons.<ul type="circle"><li>In such a scenario, barricades and signage will be put in place to communicate this change.</li><li>The police officer will provide guidance for pedestrian traffic.</li></ul></li></ul><p>Additionally, Biltmore Place will be closed 7 a.m. – 4 p.m. through the end of July.</p><p>&nbsp;Should you have any questions or concerns regarding the construction work, please feel free to reach out.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1718648112</created>  <gmt_created>2024-06-17 18:15:12</gmt_created>  <changed>1718908962</changed>  <gmt_changed>2024-06-20 18:42:42</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Storm and telecommunications work will affect the intersection.]]></teaser>  <type>news</type>  <sentence><![CDATA[Storm and telecommunications work will affect the intersection.]]></sentence>  <summary><![CDATA[<p>Storm and telecommunications work will affect the intersection.</p>]]></summary>  <dateline>2024-06-17T00:00:00-04:00</dateline>  <iso_dateline>2024-06-17T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-06-17 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Lindsey Cottingham</p><p>Capital Projects Lead</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-433-4268</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674195</item>      </media>  <hg_media>          <item>          <nid>674195</nid>          <type>image</type>          <title><![CDATA[Tech Square 3A - Utility Impact - Fifth Street_2024-06-12jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Tech Square 3A - Utility Impact - Fifth Street_2024-06-12jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/06/17/Tech%20Square%203A%20-%20Utility%20Impact%20-%20Fifth%20Street_2024-06-12jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/06/17/Tech%20Square%203A%20-%20Utility%20Impact%20-%20Fifth%20Street_2024-06-12jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/06/17/Tech%2520Square%25203A%2520-%2520Utility%2520Impact%2520-%2520Fifth%2520Street_2024-06-12jpg.jpg?itok=_pLnRRqA]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics plan for Tech Square Phase 3 as of 6/17/24.]]></image_alt>                    <created>1718648204</created>          <gmt_created>2024-06-17 18:16:44</gmt_created>          <changed>1718648204</changed>          <gmt_changed>2024-06-17 18:16:44</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="192181"><![CDATA[Tech Square Phase 3]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675122">  <title><![CDATA[Ferst Drive and Tech Parkway Water Line Extension Efforts Begin June 18]]></title>  <uid>35028</uid>  <body><![CDATA[<div>Beginning Tuesday June 18, the contractor will begin installing lateral lines from the new water main on Tech Parkway across Ferst Drive to the existing meter vault location as depicted in the attached traffic plan.&nbsp;</div><div>&nbsp;</div><div>Traffic will be directed around work areas during construction activities then trenches will be plated for off work hours. Expect minor delays as you travel through this area.</div><div>&nbsp;</div><div>The duration of this work is estimated to be 5-7 days. &nbsp;Thank you for your understanding as we improve our campus utility infrastructure.</div><div><br>&nbsp;</div>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1718641309</created>  <gmt_created>2024-06-17 16:21:49</gmt_created>  <changed>1718641550</changed>  <gmt_changed>2024-06-17 16:25:50</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Lateral lines from the new water main on Tech Parkway will be installed during this time.]]></teaser>  <type>news</type>  <sentence><![CDATA[Lateral lines from the new water main on Tech Parkway will be installed during this time.]]></sentence>  <summary><![CDATA[<p>Lateral lines from the new water main on Tech Parkway will be installed during this time.</p>]]></summary>  <dateline>2024-06-17T00:00:00-04:00</dateline>  <iso_dateline>2024-06-17T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-06-17 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Planning Design &amp; Construction | Infrastructure &amp; Sustainability&nbsp;</p><p>404-565-3449</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674193</item>      </media>  <hg_media>          <item>          <nid>674193</nid>          <type>image</type>          <title><![CDATA[FERST DRIVE RUSH WATER CONNECTIONS_june2024jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[FERST DRIVE RUSH WATER CONNECTIONS_june2024jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/06/17/FERST%20DRIVE%20RUSH%20WATER%20CONNECTIONS_june2024jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/06/17/FERST%20DRIVE%20RUSH%20WATER%20CONNECTIONS_june2024jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/06/17/FERST%2520DRIVE%2520RUSH%2520WATER%2520CONNECTIONS_june2024jpg.jpg?itok=bxj7OeNU]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics map of Ferst Drive lateral water line installation]]></image_alt>                    <created>1718641455</created>          <gmt_created>2024-06-17 16:24:15</gmt_created>          <changed>1718641455</changed>          <gmt_changed>2024-06-17 16:24:15</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="193358"><![CDATA[Ferst Drive Connectivity Plan]]></keyword>          <keyword tid="170172"><![CDATA[tech parkway]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675114">  <title><![CDATA[Bobby Dodd Way Near Crosland Tower Road Closure June 14 –August 31]]></title>  <uid>35028</uid>  <body><![CDATA[<div>Campus infrastructure improvements are underway at the corner of Cherry Street and along Bobby Dodd Way from June 14 – August 31. Please note that these closures are only to vehicular traffic. Pedestrian traffic is unaffected. Please view the attached maps for further clarity.</div><div>&nbsp;</div><div><strong>Detailed list of road closures:</strong></div><ul><li>Bobby Dodd Way from Substation Drive west to Cherry Street</li><li>Power Plant Drive from DM Smith north to Bobby Dodd Way</li><li>Cherry Street from DM Smith north to Bobby Dodd Way</li></ul><div>Please pardon our progress as we make these important upgrades. For further information about construction on campus, please view the campus <a href="https://map.gatech.edu/?id=82#!ct/74520,56246,15646,74521,74522,75326?s/" id="OWA04ad50fb-3cf0-fba5-6021-0a519d764468" rel="noopener noreferrer" target="_blank">map</a>.&nbsp;</div><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1718372948</created>  <gmt_created>2024-06-14 13:49:08</gmt_created>  <changed>1718376113</changed>  <gmt_changed>2024-06-14 14:41:53</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Utilities infrastructure improvements will be made during this timeframe.]]></teaser>  <type>news</type>  <sentence><![CDATA[Utilities infrastructure improvements will be made during this timeframe.]]></sentence>  <summary><![CDATA[<p>Utilities infrastructure improvements will be made during this timeframe.</p>]]></summary>  <dateline>2024-06-14T00:00:00-04:00</dateline>  <iso_dateline>2024-06-14T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-06-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[william.varnado@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>William Varnado&nbsp;</p><p>Associate Director-Utilities Maintenance&nbsp;</p><p>Infrastructure and Sustainability</p><p>404-825-6282</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674182</item>          <item>674183</item>      </media>  <hg_media>          <item>          <nid>674182</nid>          <type>image</type>          <title><![CDATA[utilities_june-aug2024.PNG]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[utilities_june-aug2024.PNG]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/06/14/utilities_june-aug2024.PNG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/06/14/utilities_june-aug2024.PNG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/06/14/utilities_june-aug2024.PNG?itok=sswSqqif]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Map of road closures near the area]]></image_alt>                    <created>1718375644</created>          <gmt_created>2024-06-14 14:34:04</gmt_created>          <changed>1718375644</changed>          <gmt_changed>2024-06-14 14:34:04</gmt_changed>      </item>          <item>          <nid>674183</nid>          <type>image</type>          <title><![CDATA[Utilities_june-aug2024_LG.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Utilities_june-aug2024_LG.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/06/14/Utilities_june-aug2024_LG.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/06/14/Utilities_june-aug2024_LG.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/06/14/Utilities_june-aug2024_LG.png?itok=l_JQdN4p]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Map of logistics for Bobby Dodd Way road closure near Crosland Tower]]></image_alt>                    <created>1718375951</created>          <gmt_created>2024-06-14 14:39:11</gmt_created>          <changed>1718375951</changed>          <gmt_changed>2024-06-14 14:39:11</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="13283"><![CDATA[Bobby Dodd Way]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675098">  <title><![CDATA[Bobby Dodd Way Closure Jun 17 - June 30 for Student Athlete Performance Center Utilities Tie-In]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The westbound lane of of Bobby Dodd Way will be closed to vehicular traffic for utility work. Access to Peters parking deck and Greek Housing parking will remain open. Street parking along Brittain and Fowler will remain open.</p><p>We thank you for your flexibility as we work to bring this building to fruition.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1718225449</created>  <gmt_created>2024-06-12 20:50:49</gmt_created>  <changed>1718226010</changed>  <gmt_changed>2024-06-12 21:00:10</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Utility tie-in work will require a two week closure. ]]></teaser>  <type>news</type>  <sentence><![CDATA[Utility tie-in work will require a two week closure. ]]></sentence>  <summary><![CDATA[<p>Utility tie-in work will require a two week closure.&nbsp;</p>]]></summary>  <dateline>2024-06-12T00:00:00-04:00</dateline>  <iso_dateline>2024-06-12T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-06-12 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Heather.Hardie@faciilties.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Heather Hardie&nbsp;</strong></p><p>Senior Construction Manager</p><p>Planning, Design, and Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;</p><p>470.553.6469</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674174</item>      </media>  <hg_media>          <item>          <nid>674174</nid>          <type>image</type>          <title><![CDATA[Road Closure Crane Demob  Water  Storm Utility Taps june2024_Page_2.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Road Closure Crane Demob  Water  Storm Utility Taps june2024_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/06/12/Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps%20june2024_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/06/12/Road%20Closure%20Crane%20Demob%20%20Water%20%20Storm%20Utility%20Taps%20june2024_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/06/12/Road%2520Closure%2520Crane%2520Demob%2520%2520Water%2520%2520Storm%2520Utility%2520Taps%2520june2024_Page_2.jpg?itok=I3LqaGjt]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Road closure logistics for SAPC construction and utility tie-in.]]></image_alt>                    <created>1718225797</created>          <gmt_created>2024-06-12 20:56:37</gmt_created>          <changed>1718225797</changed>          <gmt_changed>2024-06-12 20:56:37</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://ramblinwreck.com/georgia-tech-breaks-ground-on-fanning-center/]]></url>        <title><![CDATA[]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192186"><![CDATA[Student Athlete Performance Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="675011">  <title><![CDATA[Chilled Water System Improvements Along Bobby Dodd Way Ongoing Through August]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The campus chilled water system requires periodic maintenance. Work is underway to replace the water main between the Stephen C. Hall Building and Crosland Tower and install two new chilled water lines. This work requires closure of the westbound lane of Bobby Dodd Way. ADA walkways are available to allow access to buildings.</p><p>Please pardon our progress as we make these important infrastructure upgrades.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1717611605</created>  <gmt_created>2024-06-05 18:20:05</gmt_created>  <changed>1717622825</changed>  <gmt_changed>2024-06-05 21:27:05</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Improvements to the campus chilled water system impact a portion of Bobby Dodd Way through August.]]></teaser>  <type>news</type>  <sentence><![CDATA[Improvements to the campus chilled water system impact a portion of Bobby Dodd Way through August.]]></sentence>  <summary><![CDATA[<p>Improvements to the campus chilled water system impact a portion of Bobby Dodd Way through August.</p>]]></summary>  <dateline>2024-06-05T00:00:00-04:00</dateline>  <iso_dateline>2024-06-05T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-06-05 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[william.varnado@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>William Varnado</p><p>Associate Director&nbsp;</p><p>Utilities Maintenance</p><p>Infrastructure and Sustainability</p><p>404-825-6282</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674145</item>      </media>  <hg_media>          <item>          <nid>674145</nid>          <type>image</type>          <title><![CDATA[Chilled Water System Improvements Along Bobby Dodd May - August 2024]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Chilled Water Bobby Dodd CHW Main- Phase Map (2).jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/06/05/Chilled%20Water%20Bobby%20Dodd%20CHW%20Main-%20Phase%20Map%20%282%29.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/06/05/Chilled%20Water%20Bobby%20Dodd%20CHW%20Main-%20Phase%20Map%20%282%29.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/06/05/Chilled%2520Water%2520Bobby%2520Dodd%2520CHW%2520Main-%2520Phase%2520Map%2520%25282%2529.jpg?itok=9MW8cz0J]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics map for chilled water system improvements summer 2024.]]></image_alt>                    <created>1717611711</created>          <gmt_created>2024-06-05 18:21:51</gmt_created>          <changed>1717611828</changed>          <gmt_changed>2024-06-05 18:23:48</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="192925"><![CDATA[Chilled Water project]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674892">  <title><![CDATA[Watershed Improvements Temporarily Close a Section of Sidewalk and Bike Path along Tech Parkway]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning May 28, a section of the sidewalk and bike path along Tech Parkway will be closed for watershed improvements. The impacted section is located near the new waste management and landscape service yard site. A new storm drain will be tied into the existing system and a new road (path) connection from 3rd St. to Techwood Pkwy will be installed. Sidewalk closed signs and proper fencing and barricades will be in place as seen in the attached logistics map. The sidewalk across the street can be utilized as an alternate during this down time. This closure is expected to last approximately three weeks.&nbsp;</p><p>We appreciate your patience as we make these campus improvements. Please reach out if you have any questions or concerns.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1716568862</created>  <gmt_created>2024-05-24 16:41:02</gmt_created>  <changed>1716576472</changed>  <gmt_changed>2024-05-24 18:47:52</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The sidewalk and bike lane closures will last approximately three weeks.]]></teaser>  <type>news</type>  <sentence><![CDATA[The sidewalk and bike lane closures will last approximately three weeks.]]></sentence>  <summary><![CDATA[<p>The sidewalk and bike lane closures will last approximately three weeks.</p>]]></summary>  <dateline>2024-05-24T00:00:00-04:00</dateline>  <iso_dateline>2024-05-24T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-05-24 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Chris B. Williams</p><p>Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>470-553-7197</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674071</item>      </media>  <hg_media>          <item>          <nid>674071</nid>          <type>image</type>          <title><![CDATA[Bike-path-closureWM LS Service Temp Fence Logistics_Page_2.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Bike-path-closureWM LS Service Temp Fence Logistics_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/05/24/Bike-path-closureWM%20LS%20Service%20Temp%20Fence%20Logistics_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/05/24/Bike-path-closureWM%20LS%20Service%20Temp%20Fence%20Logistics_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/05/24/Bike-path-closureWM%2520LS%2520Service%2520Temp%2520Fence%2520Logistics_Page_2.jpg?itok=4MFTmki3]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics plan for bike path and sidewalk closure along Tech Parkway.]]></image_alt>                    <created>1716568874</created>          <gmt_created>2024-05-24 16:41:14</gmt_created>          <changed>1716568874</changed>          <gmt_changed>2024-05-24 16:41:14</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="193358"><![CDATA[Ferst Drive Connectivity Plan]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674891">  <title><![CDATA[Ferst Drive Water Line Relocation Impacts Means Street]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Tuesday, May 28, the Tech Parkway and <a href="https://facilities.gatech.edu/exterior-projects">Ferst Drive Connectivity Plan</a> associated water line project will install and tap the existing 12” water line on the west side of Means street at Tech Parkway. The southbound lanes of Means street will be closed from 7 a.m. – 5 p.m. and traffic will be diverted to one of the lanes for northbound traffic (see attached plan). Once the contractor installs the water line to the middle of Means Street, the southbound lanes will be closed from 7 a.m. – 5 p.m. and traffic diverted to northbound lanes.&nbsp;</p><p>All temporary lane closures will include flag persons directing traffic around the construction activities. At the end of work hours the open trenches will be plated, and lanes will be reopened to normal traffic patterns. The goal is to complete the intersection work by June 1.</p><p>Thank you for your patience as we continue to make these campus improvements. If you have any questions or concerns, please let me know.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1716564985</created>  <gmt_created>2024-05-24 15:36:25</gmt_created>  <changed>1716566083</changed>  <gmt_changed>2024-05-24 15:54:43</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Beginning May 28, water line installation work will impact Means Street.]]></teaser>  <type>news</type>  <sentence><![CDATA[Beginning May 28, water line installation work will impact Means Street.]]></sentence>  <summary><![CDATA[<p>Beginning May 28, water line installation work will impact Means Street.</p>]]></summary>  <dateline>2024-05-24T00:00:00-04:00</dateline>  <iso_dateline>2024-05-24T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-05-24 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-585-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674070</item>      </media>  <hg_media>          <item>          <nid>674070</nid>          <type>image</type>          <title><![CDATA[Ferst Drive Phase 2 Detour Route plus watershed jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst Drive Phase 2 Detour Route plus watershed jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/05/24/Ferst%20Drive%20Phase%202%20Detour%20Route%20plus%20watershed%20jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/05/24/Ferst%20Drive%20Phase%202%20Detour%20Route%20plus%20watershed%20jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/05/24/Ferst%2520Drive%2520Phase%25202%2520Detour%2520Route%2520plus%2520watershed%2520jpg.jpg?itok=Ac8rpw_3]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics of road detour for water line installation project]]></image_alt>                    <created>1716565009</created>          <gmt_created>2024-05-24 15:36:49</gmt_created>          <changed>1716565009</changed>          <gmt_changed>2024-05-24 15:36:49</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="193358"><![CDATA[Ferst Drive Connectivity Plan]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674723">  <title><![CDATA[Tech Square Phase 3 Utility Work on Biltmore Place to Begin May 20]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Utility work on Fifth St. is underway and based on the receipt of the work permit for Biltmore Place, utility work is anticipated to begin there on Monday, May 20. Work on Biltmore Place will happen concurrently to the work on 5th&nbsp;street.</p><p><strong>BILTMORE UTILITY WORK:</strong></p><ul type="disc"><li>Permit for work on Biltmore Place is pending&nbsp;</li><li>Duration of work will be approximately&nbsp;<strong>4 weeks</strong></li><li><strong>LOGISTICS</strong></li></ul><ul type="disc"><li><ul type="circle"><li>Biltmore Place will be closed from 7 a.m. – 4 p.m. Outside of those hours, it will be open with metal plates on the street.</li><li>Eastbound vehicular traffic will detour to Armstead Place, while westbound vehicular traffic will detour to Abercrombie Place.</li><li>Biltmore Place will be unavailable to bike and pedestrian traffic. All bike and pedestrian traffic between Spring St. and W. Peachtree St. will flow through the sidewalk on the south side of Fifth Street.</li></ul></li></ul><p>We appreciate your patience and flexibility as we move further along in this construction project. Should you have any questions, please reach out.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1715716977</created>  <gmt_created>2024-05-14 20:02:57</gmt_created>  <changed>1715717170</changed>  <gmt_changed>2024-05-14 20:06:10</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Utility implementation surrounding Tech Square Phase 3 continues through June.]]></teaser>  <type>news</type>  <sentence><![CDATA[Utility implementation surrounding Tech Square Phase 3 continues through June.]]></sentence>  <summary><![CDATA[<p>Utility implementation surrounding Tech Square Phase 3 continues through June.</p>]]></summary>  <dateline>2024-05-14T00:00:00-04:00</dateline>  <iso_dateline>2024-05-14T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-05-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Lindsey Cottingham</p><p>Capital Project Lead</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-433-4268</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>674007</item>          <item>674004</item>          <item>674005</item>      </media>  <hg_media>          <item>          <nid>674007</nid>          <type>image</type>          <title><![CDATA[Tech Square Phase 3 - Utility Plan Pedestrian Impact as of May 20]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Tech Square 3A - Utility Plan Impact_2024-05-13_Page_4.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/05/14/Tech%20Square%203A%20-%20Utility%20Plan%20Impact_2024-05-13_Page_4.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/05/14/Tech%20Square%203A%20-%20Utility%20Plan%20Impact_2024-05-13_Page_4.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/05/14/Tech%2520Square%25203A%2520-%2520Utility%2520Plan%2520Impact_2024-05-13_Page_4.jpg?itok=pNkeVOOR]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Construction impact for pedestrians Tech Square Phase 3 beginning May 20.]]></image_alt>                    <created>1715716239</created>          <gmt_created>2024-05-14 19:50:39</gmt_created>          <changed>1715716378</changed>          <gmt_changed>2024-05-14 19:52:58</gmt_changed>      </item>          <item>          <nid>674004</nid>          <type>image</type>          <title><![CDATA[Tech Square Phase 3 - Utility Plan Vehicular Impact as of May 20]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Tech Square 3A - Utility Plan Impact_2024-05-13_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/05/14/Tech%20Square%203A%20-%20Utility%20Plan%20Impact_2024-05-13_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/05/14/Tech%20Square%203A%20-%20Utility%20Plan%20Impact_2024-05-13_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/05/14/Tech%2520Square%25203A%2520-%2520Utility%2520Plan%2520Impact_2024-05-13_Page_2.jpg?itok=4aOovvLF]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Construction impact Tech Square Phase 3 beginning May 20.]]></image_alt>                    <created>1715715764</created>          <gmt_created>2024-05-14 19:42:44</gmt_created>          <changed>1715716077</changed>          <gmt_changed>2024-05-14 19:47:57</gmt_changed>      </item>          <item>          <nid>674005</nid>          <type>image</type>          <title><![CDATA[Tech Square Phase 3 - Utility Plan Bike Impact as of May 20]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Tech Square 3A - Utility Plan Impact_2024-05-13_Page_3.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/05/14/Tech%20Square%203A%20-%20Utility%20Plan%20Impact_2024-05-13_Page_3.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/05/14/Tech%20Square%203A%20-%20Utility%20Plan%20Impact_2024-05-13_Page_3.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/05/14/Tech%2520Square%25203A%2520-%2520Utility%2520Plan%2520Impact_2024-05-13_Page_3.jpg?itok=cTnRP12i]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Construction impact Tech Square Phase 3 beginning May 20.]]></image_alt>                    <created>1715716104</created>          <gmt_created>2024-05-14 19:48:24</gmt_created>          <changed>1715716227</changed>          <gmt_changed>2024-05-14 19:50:27</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="192181"><![CDATA[Tech Square Phase 3]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674602">  <title><![CDATA[500 Tech Parkway Parking Lot Construction Continues Through May 24]]></title>  <uid>35028</uid>  <body><![CDATA[<p>As construction work continues in the 500 Tech Parkway parking lot, there are three important updates:&nbsp;</p><p>&nbsp;<strong>Business Services (711 Marietta Street) Parking Lot Closure in May&nbsp;</strong></p><ul><li><p><strong>Week of May 13-17</strong>: partial parking lot closure; limited parking spaces available&nbsp;</p></li><li><p><strong>Week of May 20-24</strong>: full parking lot closure; no parking spaces available&nbsp;</p></li></ul><p><strong>&nbsp;Alternative Parking Options&nbsp;</strong></p><ul><li><p>Limited spaces at 755 Marietta Street&nbsp;</p></li><li><p>Limited spaces at 811 Marietta Street&nbsp;</p></li><li><p>W02 Student Center Deck is&nbsp;now&nbsp;available for W04 permit holders during the construction period&nbsp;and will be active through August 14.</p></li></ul><p><strong>Permit Information&nbsp;</strong></p><ul><li><p>Refundable permits may be returned for prorated refunds to the PTS office before March 31 each academic year. Permits returned after this date cannot be refunded.&nbsp;</p></li><li><p>Unfortunately, reimbursements for parking costs will not be available.&nbsp;</p></li></ul><p>We apologize for any inconvenience and appreciate your understanding during this time. If you have any questions, please contact the <a href="https://www.pts.gatech.edu/" rel="noreferrer noopener" target="_blank">Parking and Transportation Services</a> (PTS) office at <a href="support@pts.gatech.edu">support@pts.gatech.edu</a> or call 404-385-7275.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1715199260</created>  <gmt_created>2024-05-08 20:14:20</gmt_created>  <changed>1715289493</changed>  <gmt_changed>2024-05-09 21:18:13</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Additional parking lot closures will occur beginning May 13 through May 24.]]></teaser>  <type>news</type>  <sentence><![CDATA[Additional parking lot closures will occur beginning May 13 through May 24.]]></sentence>  <summary><![CDATA[<p>Additional parking lot closures will occur beginning May 13 through May 24.</p>]]></summary>  <dateline>2024-05-08T00:00:00-04:00</dateline>  <iso_dateline>2024-05-08T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-05-08 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[tschneider33@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Thomas Schneider</p><p>Construction Project Manager II</p><p>Planning, Design, and Construction&nbsp;</p><p>Infrastructure and Sustainability</p><p>404-358-3290</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673967</item>      </media>  <hg_media>          <item>          <nid>673967</nid>          <type>image</type>          <title><![CDATA[500 Tech Parkway Pedestrian and Parking Access May 13 - May 24]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[711 Marietta Parking Lot Closure_jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/05/09/711%20Marietta%20Parking%20Lot%20Closure_jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/05/09/711%20Marietta%20Parking%20Lot%20Closure_jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/05/09/711%2520Marietta%2520Parking%2520Lot%2520Closure_jpg.jpg?itok=PMTrWckV]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Image of logistics for parking availability during construction.]]></image_alt>                    <created>1715271348</created>          <gmt_created>2024-05-09 16:15:48</gmt_created>          <changed>1715271653</changed>          <gmt_changed>2024-05-09 16:20:53</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="190282"><![CDATA[administrative Services center]]></keyword>          <keyword tid="179783"><![CDATA[Georgia Tech Human Resources (GTHR)]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674530">  <title><![CDATA[Electrical Infrastructure Upgrade for East Campus Residence Halls Underway until July 31]]></title>  <uid>35028</uid>  <body><![CDATA[<p>An electrical infrastructure upgrade project is taking place in the courtyard between Field, Hopkins, Hanson, and Perry-Matheson Residence Halls.</p><p>The construction work will be contained within the courtyard between the buildings with some activities on the east side of Hanson and the north side of Perry-Matheson.</p><p>Street parking along Bobby Dodd way will be affected. Please see the attached logistics plan.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1715019076</created>  <gmt_created>2024-05-06 18:11:16</gmt_created>  <changed>1715019410</changed>  <gmt_changed>2024-05-06 18:16:50</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Improvements to the campus electrical infrastructure affecting residence halls on the east side of campus will affect street parking along Bobby Dodd Way east of Techwood Drive.]]></teaser>  <type>news</type>  <sentence><![CDATA[Improvements to the campus electrical infrastructure affecting residence halls on the east side of campus will affect street parking along Bobby Dodd Way east of Techwood Drive.]]></sentence>  <summary><![CDATA[<p>Improvements to the campus electrical infrastructure affecting residence halls on the east side of campus will affect street parking along Bobby Dodd Way east of Techwood Drive.</p>]]></summary>  <dateline>2024-05-06T00:00:00-04:00</dateline>  <iso_dateline>2024-05-06T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-05-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[spencer.sheffield@aux.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Spencer Sheffield</p><p>Project Manager Senior</p><p>Campus Services | Student Engagement &amp; Well-being</p><p>404-783-5694</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673952</item>      </media>  <hg_media>          <item>          <nid>673952</nid>          <type>image</type>          <title><![CDATA[Electrical_system_improvements_Area Two Infrastructure Site Logistics Planjpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Electrical_system_improvements_Area Two Infrastructure Site Logistics Planjpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/05/06/Electrical_system_improvements_Area%20Two%20Infrastructure%20Site%20Logistics%20Planjpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/05/06/Electrical_system_improvements_Area%20Two%20Infrastructure%20Site%20Logistics%20Planjpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/05/06/Electrical_system_improvements_Area%2520Two%2520Infrastructure%2520Site%2520Logistics%2520Planjpg.jpg?itok=SXzV25Rr]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Image of logistics plan for electrical system upgrades.]]></image_alt>                    <created>1715019258</created>          <gmt_created>2024-05-06 18:14:18</gmt_created>          <changed>1715019258</changed>          <gmt_changed>2024-05-06 18:14:18</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="193699"><![CDATA[Electrical System upgrades]]></keyword>          <keyword tid="193700"><![CDATA[Infrastructure upgrades]]></keyword>          <keyword tid="13283"><![CDATA[Bobby Dodd Way]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674489">  <title><![CDATA[AE Hanger Construction Affects NARA Campus Parking]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning May 17th&nbsp;the parking lot adjacent to the Tech Way Building / Loading Area and all parking around the Tech Way Circle will be closed due to the construction of the AE Hanger Building and site utilities.</p><p>Thirty-six (36) alternate parking spaces will be available on the east end of the NARA campus for the duration of construction including additional ADA spaces.</p><p>ADA and pedestrian access to the Tech Way Building Loading Area and Facilities has been constructed and will be available for use on Monday May 17.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1714664933</created>  <gmt_created>2024-05-02 15:48:53</gmt_created>  <changed>1714665331</changed>  <gmt_changed>2024-05-02 15:55:31</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Beginning May 17, parking around the Tech Way Circle will be closed due to the construction of the AE Hangar Building.]]></teaser>  <type>news</type>  <sentence><![CDATA[Beginning May 17, parking around the Tech Way Circle will be closed due to the construction of the AE Hangar Building.]]></sentence>  <summary><![CDATA[<p>Beginning May 17, parking around the Tech Way Circle will be closed due to the construction of the AE Hangar Building.</p>]]></summary>  <dateline>2024-05-02T00:00:00-04:00</dateline>  <iso_dateline>2024-05-02T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-05-02 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Michael.Boeckl@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Michael (Micky) Boeckl, RA</p><p>Construction Project Manager</p><p>Planning, Design, and Construction | Infrastructure and Sustainability</p><p>470-295-1757</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673926</item>      </media>  <hg_media>          <item>          <nid>673926</nid>          <type>image</type>          <title><![CDATA[AE Hangar Construction Affects Parking at NARA]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[AE_hangar_may2024.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/05/02/AE_hangar_may2024.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/05/02/AE_hangar_may2024.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/05/02/AE_hangar_may2024.png?itok=CVVHWVE5]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Image of AE Hangar construction and parking logistics.]]></image_alt>                    <created>1714665058</created>          <gmt_created>2024-05-02 15:50:58</gmt_created>          <changed>1714665256</changed>          <gmt_changed>2024-05-02 15:54:16</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="174576"><![CDATA[North Avenue Research Area]]></keyword>          <keyword tid="10010"><![CDATA[aeronautical engineering]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674448">  <title><![CDATA[Crane Staging Requires Partial Closure of Bobby Dodd Way May 6 through 10]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The demolition of the Edge-Rice building is underway in preparation for the construction of the new Fanning Student Athlete Performance Center.&nbsp;To further assist with the removal of the Edge-Rice building, a demolition crane will be assembled on Bobby Dodd Way during the week of May 6 - 10 and a section of Bobby Dodd Way will be closed to traffic and pedestrians.</p><p>The attached maps outline traffic and pedestrian closures and associated detours. Digital signage is in place at the site with notification of the closure.</p><p>Thank you for your continued patience and support as this exciting new project continues to make progress.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1714502314</created>  <gmt_created>2024-04-30 18:38:34</gmt_created>  <changed>1714507150</changed>  <gmt_changed>2024-04-30 19:59:10</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[As deconstruction of the Edge-Rice Building progresses, a demolition crane will be assembled on Bobby Dodd Way.]]></teaser>  <type>news</type>  <sentence><![CDATA[As deconstruction of the Edge-Rice Building progresses, a demolition crane will be assembled on Bobby Dodd Way.]]></sentence>  <summary><![CDATA[<p>As deconstruction of the Edge-Rice Building progresses, a demolition crane will be assembled on Bobby Dodd Way.</p>]]></summary>  <dateline>2024-04-30T00:00:00-04:00</dateline>  <iso_dateline>2024-04-30T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-04-30 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Heather.Hardie@faciilties.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Heather Hardie</p><p>Senior Construction Manager</p><p>Planning, Design, and Construction | Infrastructure and Sustainability</p><p>470-553-6469</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673894</item>          <item>673895</item>          <item>673896</item>      </media>  <hg_media>          <item>          <nid>673894</nid>          <type>image</type>          <title><![CDATA[Bobby Dodd Closure 5.6.24-5.10.24jpg_Page_1.jpg]]></title>          <body><![CDATA[<p>Crane Logistics: Traffic Control on Bobby Dodd Way May 6 - 10</p>]]></body>                      <image_name><![CDATA[Bobby Dodd Closure 5.6.24-5.10.24jpg_Page_1.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/30/Bobby%20Dodd%20Closure%205.6.24-5.10.24jpg_Page_1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/30/Bobby%20Dodd%20Closure%205.6.24-5.10.24jpg_Page_1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/30/Bobby%2520Dodd%2520Closure%25205.6.24-5.10.24jpg_Page_1.jpg?itok=II43IuBY]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for crane staging May 6 - 10 on Bobby Dodd Way]]></image_alt>                    <created>1714503245</created>          <gmt_created>2024-04-30 18:54:05</gmt_created>          <changed>1714503245</changed>          <gmt_changed>2024-04-30 18:54:05</gmt_changed>      </item>          <item>          <nid>673895</nid>          <type>image</type>          <title><![CDATA[Bobby Dodd Closure 5.6.24-5.10.24jpg_Page_2.jpg]]></title>          <body><![CDATA[<p>Crane Logistics: Traffic Control May 6-10 Bobby Dodd Way</p>]]></body>                      <image_name><![CDATA[Bobby Dodd Closure 5.6.24-5.10.24jpg_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/30/Bobby%20Dodd%20Closure%205.6.24-5.10.24jpg_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/30/Bobby%20Dodd%20Closure%205.6.24-5.10.24jpg_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/30/Bobby%2520Dodd%2520Closure%25205.6.24-5.10.24jpg_Page_2.jpg?itok=UOfaCl2A]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for crane staging May 6 - 10 on Bobby Dodd Way]]></image_alt>                    <created>1714503404</created>          <gmt_created>2024-04-30 18:56:44</gmt_created>          <changed>1714503404</changed>          <gmt_changed>2024-04-30 18:56:44</gmt_changed>      </item>          <item>          <nid>673896</nid>          <type>image</type>          <title><![CDATA[Bobby Dodd Closure 5.6.24-5.10.24jpg_Page_3.jpg]]></title>          <body><![CDATA[<p>Pedestrian &amp; ADA Access Control May 6-10 Bobby Dodd Way during crane staging for Student Athlete Performance Center.</p>]]></body>                      <image_name><![CDATA[Bobby Dodd Closure 5.6.24-5.10.24jpg_Page_3.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/30/Bobby%20Dodd%20Closure%205.6.24-5.10.24jpg_Page_3.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/30/Bobby%20Dodd%20Closure%205.6.24-5.10.24jpg_Page_3.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/30/Bobby%2520Dodd%2520Closure%25205.6.24-5.10.24jpg_Page_3.jpg?itok=DmStBQnQ]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for crane staging May 6 - 10 on Bobby Dodd Way]]></image_alt>                    <created>1714503506</created>          <gmt_created>2024-04-30 18:58:26</gmt_created>          <changed>1714503506</changed>          <gmt_changed>2024-04-30 18:58:26</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://ramblinwreck.com/student-athlete-performance-center-to-be-named-in-honor-of-fanning/]]></url>        <title><![CDATA[Learn more about the Student Athlete Performance Center]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="13283"><![CDATA[Bobby Dodd Way]]></keyword>          <keyword tid="192186"><![CDATA[Student Athlete Performance Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674399">  <title><![CDATA[Tech Square Phase 3 Utility Work to Affect Vehicular Traffic on Fifth Street ]]></title>  <uid>27164</uid>  <body><![CDATA[<p>Utility work on Fifth Street is resuming Monday, April 29, and will necessitate the closure of both lanes to vehicular traffic between West Peachtree Street and Spring Street to help ensure the safety of motorists and construction crews as work continues on Tech Square Phase 3. &nbsp;</p><p>This closure is expected to last four to five weeks but will be paused Thursday, May 2, through Sunday, May 5, to accommodate heavy traffic anticipated during Tech’s Commencement ceremonies.&nbsp;</p><p>Details of the closure:&nbsp;</p><ul><li>Fifth Street will be closed between West Peachtree Street and Spring Street Monday through Friday from 7 a.m. to 4 p.m. (Except Thursday, May 2, and Friday, May 3.) Detour signs will be in place to help navigate the change in traffic patterns. Outside of these days and times, metal plates will be in place to allow two-way vehicular traffic.&nbsp;</li><li>Sidewalks to the north and south of Fifth Street will remain open to pedestrians for the next four to five weeks. Sidewalk closures are likely in the future. &nbsp;</li><li>Bicyclists will be required to walk their bikes on the sidewalks during closure times.&nbsp;</li><li>Parallel parking on the south side of Fifth Street will be available outside of the construction hours (Monday through Friday, 7 a.m. to 4 p.m.).&nbsp;</li><li>Changes to Stinger transit services will be posted on the <a href="https://www.pts.gatech.edu/shuttles/stinger/" target="_blank">Parking and Transportation website</a>.&nbsp;</li></ul><p>Please see the attached diagrams for pedestrian, bike, and traffic flow information.&nbsp;</p><p><strong>Scaffolding Over Spring Street Pedestrian Walkway</strong>&nbsp;</p><p>The contractor is currently installing scaffolding over the left lane of Spring Street to enhance pedestrian safety.&nbsp;</p><ul><li>Installation is expected to be complete on Friday, April 26.&nbsp;</li><li>The scaffolding will remain in place for one year.&nbsp;</li><li>During scaffolding installation, pedestrians will be diverted to the west sidewalks on Abercrombie Place and Fifth Street.&nbsp;</li></ul><p>Updates on campus construction projects, including Tech Square Phase 3, can be found on <a href="https://facilities.gatech.edu/news" target="_blank">Infrastructure and Sustainability’s website</a>. &nbsp;</p>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1714136263</created>  <gmt_created>2024-04-26 12:57:43</gmt_created>  <changed>1714142218</changed>  <gmt_changed>2024-04-26 14:36:58</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Both lanes of Fifth Street between West Peachtree Street and Spring Street will be closed to vehicular traffic to ensure safety as utility work continues on Tech Square Phase 3.]]></teaser>  <type>news</type>  <sentence><![CDATA[Both lanes of Fifth Street between West Peachtree Street and Spring Street will be closed to vehicular traffic to ensure safety as utility work continues on Tech Square Phase 3.]]></sentence>  <summary><![CDATA[<p>Both lanes of Fifth Street between West Peachtree Street and Spring Street will be closed to vehicular traffic to ensure safety as utility work continues on Tech Square Phase 3.&nbsp;</p>]]></summary>  <dateline>2024-04-26T00:00:00-04:00</dateline>  <iso_dateline>2024-04-26T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-04-26 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Lindsey Cottingham<br />Capital Projects Lead<br />Infrastructure and Sustainability<br />404-433-4268</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673862</item>          <item>673863</item>          <item>673864</item>      </media>  <hg_media>          <item>          <nid>673862</nid>          <type>image</type>          <title><![CDATA[Vehicular Detour April 2024 Tech Square Phase 3.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Vehicular Detour April 2024 Tech Square Phase 3.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/26/Vehicular%20Detour%20April%202024%20Tech%20Square%20Phase%203.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/26/Vehicular%20Detour%20April%202024%20Tech%20Square%20Phase%203.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/26/Vehicular%2520Detour%2520April%25202024%2520Tech%2520Square%2520Phase%25203.jpg?itok=wbnn7X5m]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of vehicular detour on Fifth Street]]></image_alt>                    <created>1714136619</created>          <gmt_created>2024-04-26 13:03:39</gmt_created>          <changed>1714136619</changed>          <gmt_changed>2024-04-26 13:03:39</gmt_changed>      </item>          <item>          <nid>673863</nid>          <type>image</type>          <title><![CDATA[Pedestrian Detour April 2024 Tech Square Phase 3.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Pedestrian Detour April 2024 Tech Square Phase 3.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/26/Pedestrian%20Detour%20April%202024%20Tech%20Square%20Phase%203.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/26/Pedestrian%20Detour%20April%202024%20Tech%20Square%20Phase%203.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/26/Pedestrian%2520Detour%2520April%25202024%2520Tech%2520Square%2520Phase%25203.jpg?itok=wB8Fri9u]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of pedestrian detour on Fifth Street]]></image_alt>                    <created>1714136691</created>          <gmt_created>2024-04-26 13:04:51</gmt_created>          <changed>1714136691</changed>          <gmt_changed>2024-04-26 13:04:51</gmt_changed>      </item>          <item>          <nid>673864</nid>          <type>image</type>          <title><![CDATA[Bike Detour April 2024 Tech Square Phase 3.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Bike Detour April 2024 Tech Square Phase 3.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/26/Bike%20Detour%20April%202024%20Tech%20Square%20Phase%203.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/26/Bike%20Detour%20April%202024%20Tech%20Square%20Phase%203.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/26/Bike%2520Detour%2520April%25202024%2520Tech%2520Square%2520Phase%25203.jpg?itok=ilYNE8pB]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of bike detour on Fifth Street]]></image_alt>                    <created>1714136758</created>          <gmt_created>2024-04-26 13:05:58</gmt_created>          <changed>1714136758</changed>          <gmt_changed>2024-04-26 13:05:58</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://facilities.gatech.edu/news]]></url>        <title><![CDATA[Campus Construction Notices]]></title>      </link>          <link>        <url><![CDATA[https://www.pts.gatech.edu/shuttles/stinger/]]></url>        <title><![CDATA[Campus Bus - Stinger Routes]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>          <keyword tid="181597"><![CDATA[construction notices construction facilities management]]></keyword>          <keyword tid="193671"><![CDATA[I&amp;S Construction Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674292">  <title><![CDATA[Demolition of Edge-Rice Building Begins Today]]></title>  <uid>27164</uid>  <body><![CDATA[<p>To make way for the new Thomas A. Fanning Student-Athlete Performance Center, construction crews will begin the structural demolition of the Edge-Rice Building today. This work will not affect traffic or pedestrian access beyond the current configuration, but noise and activity at the site will increase.</p><p>Demolition schedule:</p><p><strong>April 22 – May 3:</strong>&nbsp; 9 a.m. to 7 p.m., Monday – Saturday.</p><p><strong>May 3 – end of July</strong>: &nbsp;7 a.m. to 7 p.m., Monday – Saturday.</p><p><a href="https://ramblinwreck.com/georgia-tech-breaks-ground-on-fanning-center/">Learn more</a> about the state-of-the-art facility for Georgia Tech student-athletes scheduled for completion in early 2026. You can also learn more about recent campus improvement projects on the Infrastructure and Sustainability <a href="https://facilities.gatech.edu/news">News and Construction Notices page</a>.</p>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1713559820</created>  <gmt_created>2024-04-19 20:50:20</gmt_created>  <changed>1713794105</changed>  <gmt_changed>2024-04-22 13:55:05</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[To make way for the new Thomas A. Fanning Student-Athlete Performance Center, construction crews will begin the structural demolition of the Edge-Rice Building today. ]]></teaser>  <type>news</type>  <sentence><![CDATA[To make way for the new Thomas A. Fanning Student-Athlete Performance Center, construction crews will begin the structural demolition of the Edge-Rice Building today. ]]></sentence>  <summary><![CDATA[<p>To make way for the new Thomas A. Fanning Student-Athlete Performance Center, construction crews will begin the structural demolition of the Edge-Rice Building today. This work will not affect traffic or pedestrian access beyond the current configuration, but noise and activity at the site will increase.</p>]]></summary>  <dateline>2024-04-22T00:00:00-04:00</dateline>  <iso_dateline>2024-04-22T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-04-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Heather.Hardie@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Heather Hardie</strong></p><p>Senior Construction Manager<br />Planning, Design and Construction<br />Infrastructure and Sustainability&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673789</item>      </media>  <hg_media>          <item>          <nid>673789</nid>          <type>image</type>          <title><![CDATA[Thomas A. Fanning Student-Athlete Performance Center Rendering April 2024.jpg]]></title>          <body><![CDATA[<p>This is an artistic rendering and subject to change.</p>]]></body>                      <image_name><![CDATA[Thomas A. Fanning Student-Athlete Performance Center Rendering April 2024.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/19/Thomas%20A.%20Fanning%20Student-Athlete%20Performance%20Center%20Rendering%20April%202024.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/19/Thomas%20A.%20Fanning%20Student-Athlete%20Performance%20Center%20Rendering%20April%202024.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/19/Thomas%2520A.%2520Fanning%2520Student-Athlete%2520Performance%2520Center%2520Rendering%2520April%25202024.jpg?itok=We0Yv1of]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Thomas A. Fanning Student-Athlete Performance Center Rendering]]></image_alt>                    <created>1713559471</created>          <gmt_created>2024-04-19 20:44:31</gmt_created>          <changed>1713559601</changed>          <gmt_changed>2024-04-19 20:46:41</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://facilities.gatech.edu/news]]></url>        <title><![CDATA[Campus Construction Notices]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="193649"><![CDATA[Thomas A. Fanning Student-Athlete Performance Center]]></keyword>          <keyword tid="193650"><![CDATA[Edge-Rice Building]]></keyword>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>          <keyword tid="181597"><![CDATA[construction notices construction facilities management]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674288">  <title><![CDATA[Structural Demolition Begins on Edge-Rice Building]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Structural demolition of the Edge-Rice building will being on Monday, April 22 (see attached map of location). This work will not affect traffic or pedestrian access beyond the current shut down at this time but there will be an increase in noise and site activity.</p><p>Work hours will be 9 a.m. - 7 p.m. Monday - Saturday, during reading week and finals (April 22 - May 3). After May 3, demolition hours will be 7 a.m. - 7 p.m., Monday - Saturday, and is expected to last through July. All demolition work is being coordinated with campus and athletic activities.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1713552351</created>  <gmt_created>2024-04-19 18:45:51</gmt_created>  <changed>1713788614</changed>  <gmt_changed>2024-04-22 12:23:34</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Demolition efforts will create increased noise and activity in the area.]]></teaser>  <type>news</type>  <sentence><![CDATA[Demolition efforts will create increased noise and activity in the area.]]></sentence>  <summary><![CDATA[<p>Demolition efforts will create increased noise and activity in the area.</p>]]></summary>  <dateline>2024-04-19T00:00:00-04:00</dateline>  <iso_dateline>2024-04-19T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-04-19 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Heather.Hardie@faciilties.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Heather Hardie</p><p>Senior Construction Manager</p><p>Planning, Design, and Construction | Infrastructure and Sustainability</p><p>470-553-6469</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673782</item>      </media>  <hg_media>          <item>          <nid>673782</nid>          <type>image</type>          <title><![CDATA[Edge_Rice Structural Demolition Start_mapjpg.jpg]]></title>          <body><![CDATA[<p>Location of demolition site of Edge-Rice Building.</p>]]></body>                      <image_name><![CDATA[Edge_Rice Structural Demolition Start_mapjpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/19/Edge_Rice%20Structural%20Demolition%20Start_mapjpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/19/Edge_Rice%20Structural%20Demolition%20Start_mapjpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/19/Edge_Rice%2520Structural%2520Demolition%2520Start_mapjpg.jpg?itok=k9bijlsV]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of campus indicating location of demolition site.]]></image_alt>                    <created>1713552363</created>          <gmt_created>2024-04-19 18:46:03</gmt_created>          <changed>1713552363</changed>          <gmt_changed>2024-04-19 18:46:03</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192186"><![CDATA[Student Athlete Performance Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="674276">  <title><![CDATA[East Campus Streetscape Improvements Continue Along Techwood Drive]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The current phase of streetscape construction is ahead of schedule for Area A2 and sidewalks will open to pedestrians this weekend. Fencing will now be shifted to the opposite side of the street and barricades added in the roadway for protection from the incomplete intermediate bike lanes that will be paved at a later date.&nbsp;</p><p>Area G, between Bobby Dodd Way and 4th Street sidewalks and curbs will begin construction with an estimated completion date for this area of May 7. Vehicular traffic north and southbound on Techwood Drive will be designated with centerline and barriers. Please see the attached traffic and sequencing plan for reference.&nbsp;</p><p>If you have any questions or concerns, reach out to Jerry Young, Landscape Project Manager, 404-565-349.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1713538945</created>  <gmt_created>2024-04-19 15:02:25</gmt_created>  <changed>1713541170</changed>  <gmt_changed>2024-04-19 15:39:30</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The phased improvement project is moving along ahead of schedule.]]></teaser>  <type>news</type>  <sentence><![CDATA[The phased improvement project is moving along ahead of schedule.]]></sentence>  <summary><![CDATA[<p>The phased improvement project is moving along ahead of schedule.</p>]]></summary>  <dateline>2024-04-19T00:00:00-04:00</dateline>  <iso_dateline>2024-04-19T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-04-19 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction | Infrastructure and Sustainability</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673767</item>          <item>673765</item>      </media>  <hg_media>          <item>          <nid>673767</nid>          <type>image</type>          <title><![CDATA[GT East Campus Phase 2G NEWjpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GT East Campus Phase 2G NEWjpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/19/GT%20East%20Campus%20Phase%202G%20NEWjpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/19/GT%20East%20Campus%20Phase%202G%20NEWjpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/19/GT%2520East%2520Campus%2520Phase%25202G%2520NEWjpg.jpg?itok=IbkGmyRw]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[image of logistics plan for Phase 2G of East Campus Streetscape project]]></image_alt>                    <created>1713540799</created>          <gmt_created>2024-04-19 15:33:19</gmt_created>          <changed>1713540799</changed>          <gmt_changed>2024-04-19 15:33:19</gmt_changed>      </item>          <item>          <nid>673765</nid>          <type>image</type>          <title><![CDATA[GT East Campus Phase 2 Sequencing Plan 4.15.24jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GT East Campus Phase 2 Sequencing Plan 4.15.24jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/04/19/GT%20East%20Campus%20Phase%202%20Sequencing%20Plan%204.15.24jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/04/19/GT%20East%20Campus%20Phase%202%20Sequencing%20Plan%204.15.24jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/04/19/GT%2520East%2520Campus%2520Phase%25202%2520Sequencing%2520Plan%25204.15.24jpg.jpg?itok=mxTu2HVO]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[image of logistics plan for Phase 2 Sequence East Campus Streetscape]]></image_alt>                    <created>1713540674</created>          <gmt_created>2024-04-19 15:31:14</gmt_created>          <changed>1713540674</changed>          <gmt_changed>2024-04-19 15:31:14</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="673518">  <title><![CDATA[Planned Electrical Outage for Van Leer Building March 16 - 21]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Required electrical work at Van Leer will begin March 16 at 7:00 a.m. Power will be restored to specific areas throughout the week (see details below).</p><p><strong>4kV motors lab </strong>- restored Monday Noon 3/18.</p><p><strong>SWB loads</strong> - restored Monday Noon 3/18.</p><ul type="disc"><li>Interdisciplinary Design Commons Maker Space (old Rotunda). All floors.</li><li>Lighting for the west half of building- 1st-4th&nbsp;floors.</li><li>Lighting for the 5th&nbsp;floor.</li><li>W139 Structural and Research Lab.</li><li>W115 Lab power.</li></ul><p><strong>NEA loads&nbsp;</strong>- restored Tuesday Morning 3/19.</p><ul type="disc"><li>Lighting for the east half of building- 1st-4th&nbsp;floors.</li><li>Cleanroom receptacles and equipment.</li><li>Cleanroom lighting, HVAC, and exhaust fans</li><li>Room E396E Spectra-Physics DC Power Supply (not in use).</li><li>Room C248 furniture receptacles.</li></ul><p><strong>NWBH loads&nbsp;</strong>- restored Tuesday Morning 3/19.</p><ul type="disc"><li>DC generators and W139 Lab.</li><li>Mechanical systems including air-handling units, chilled water, and condensate pumps.</li></ul><ul type="disc"><li>Emergency egress lighting (can be supplied by the generator)</li><li>Elevator.</li></ul><p><strong>NWBL loads</strong> - restored Wednesday Morning 3/20.</p><ul type="disc"><li>Main Communications Room W237.</li><li>W115 Lab power.</li><li>W116A Shop power.</li><li>W139 Structural and Research Lab</li><li>SW Communications Rooms- 2nd&nbsp;- 4th&nbsp;floors.</li><li>Receptacles for west half of building- 2nd&nbsp;- 4th&nbsp;floor.</li><li>Receptacles for the 5th floor.</li><li>Elevator machine room air-conditioning.</li><li>Roof Power</li></ul><p><strong>SEA loads&nbsp;</strong>- restored Thursday Noon 3/21.</p><ul type="disc"><li>Cleanroom receptacles and equipment.</li><li>Cleanroom office area receptacles- west side.</li><li>Office receptacles- 1st&nbsp;floor east side.</li><li>Mechanical Room- JCI controls, receptacles, and power for 120V pumps.</li><li>Elevator cab lights.</li><li>SE Communications Rooms- 2nd&nbsp;- 4th&nbsp;floors.</li><li>Receptacles for east half of building- 2nd&nbsp;- 4th&nbsp;floors.</li></ul>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1710367648</created>  <gmt_created>2024-03-13 22:07:28</gmt_created>  <changed>1710367647</changed>  <gmt_changed>2024-03-13 22:07:27</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Improvements to the electrical system in the Van Leer Building require a planned outage.]]></teaser>  <type>news</type>  <sentence><![CDATA[Improvements to the electrical system in the Van Leer Building require a planned outage.]]></sentence>  <summary><![CDATA[<p>Improvements to the electrical system in the Van Leer Building require a planned outage.</p>]]></summary>  <dateline>2024-03-13T00:00:00-04:00</dateline>  <iso_dateline>2024-03-13T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-03-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mitchell.shelton@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Mitchell Shelton</p><p>Construction Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>470-351-7746</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="192715"><![CDATA[Van Leer Building]]></keyword>          <keyword tid="193568"><![CDATA[Planned Electrical Outage]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="673517">  <title><![CDATA[GTPD Accepting Applications for Spring Citizens Police Academy]]></title>  <uid>27164</uid>  <body><![CDATA[<p><span><span><span><span><span>Registration is now open for the spring semester session of the Georgia Tech Police Department’s (GTPD) Citizens Police Academy.</span></span></span></span></span></p><p><span><span><span><span><span>A five-week program designed to educate and inform Georgia Tech students, faculty, and staff about how GTPD operates and the issues they face, the Citizens Police Academy enrolls 20 attendees each session on a first-come, first-served basis.</span></span></span></span></span></p><p><span><span><span><span><span><span>“This was a unique experience for my cohort and gave us exposure to the inside of policing,” said</span></span><span><span> Tammie Pierce, emergency management coordinator. “I really enjoyed learning about each division within GTPD and how it functions –&nbsp;especially the hands-on training from the forensics session. I feel more connected to our campus officers now that I know about the work they do on a daily basis to protect the community.”&nbsp; </span></span></span></span></span></span></p><p><span><span><span><span><span><span>Sessions provide overviews and firsthand experience in forensics and investigations, digital intelligence, 911 dispatching, firearm training, and more. </span></span></span></span></span></span></p><ul><li><span><span><span><span><span><span><span>Thursday, March 28: Welcome and Introduction to GTPD&nbsp;</span></span></span></span></span></span></span></li><li><span><span><span><span><span><span><span>Tuesday, April 2: Patrol Division, Jeanne Clery Act&nbsp;</span></span></span></span></span></span></span></li><li><span><span><span><span><span><span><span>Thursday, April 4: Use of Force and Judgmental Simulator&nbsp;</span></span></span></span></span></span></span></li><li><span><span><span><span><span><span><span>Tuesday, April 9: Office of Emergency Management and 911 Communications&nbsp;</span></span></span></span></span></span></span></li><li><span><span><span><span><span><span><span>Thursday, April 11: Law Enforcement Technology and Digital Intelligence&nbsp;</span></span></span></span></span></span></span></li><li><span><span><span><span><span><span><span>Monday, April 15: Forensics and Investigations&nbsp;</span></span></span></span></span></span></span></li><li><span><span><span><span><span><span><span>Wednesday, April 17: Special Events and K9 Unit&nbsp;</span></span></span></span></span></span></span></li><li><span><span><span><span><span><span><span>Friday, April 19: Firearms Training (off-site)&nbsp;</span></span></span></span></span></span></span></li><li><span><span><span><span><span><span><span>Tuesday, April 23: Community Engagement&nbsp;</span></span></span></span></span></span></span></li><li><span><span><span><span><span><span><span>Thursday, April 25: Administration and Graduation</span></span></span></span></span></span></span></li></ul><p><span><span><span><span><span><span>All classes (except where noted above) meet from 5:30 to 7:30 p.m. at GTPD headquarters </span></span><strong><span><span><span>on the corner of 10th Street and Hemphill Avenue NW</span></span></span></strong><strong><span><span>.</span></span></strong></span></span></span></span></p><p><span><span><span><span><span><span>Click <a href="https://police.gatech.edu/citizens-police-academy-0">here</a></span></span> <span><span>for more information about the program. To secure your spot, submit an application <a href="https://gatech.co1.qualtrics.com/jfe/form/SV_8Ah8EPLqjmb8mTY">here</a>. &nbsp;</span></span></span></span></span></span></p>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1710367019</created>  <gmt_created>2024-03-13 21:56:59</gmt_created>  <changed>1710367209</changed>  <gmt_changed>2024-03-13 22:00:09</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Registration is now open for the spring semester session of the Georgia Tech Police Department’s (GTPD) Citizens Police Academy.]]></teaser>  <type>news</type>  <sentence><![CDATA[Registration is now open for the spring semester session of the Georgia Tech Police Department’s (GTPD) Citizens Police Academy.]]></sentence>  <summary><![CDATA[<p><span><span><span><span><span>Registration is now open for the spring semester session of the Georgia Tech Police Department’s (GTPD) Citizens Police Academy.</span></span></span></span></span></p>]]></summary>  <dateline>2024-03-13T00:00:00-04:00</dateline>  <iso_dateline>2024-03-13T00:00:00-04:00</iso_dateline>  <gmt_dateline>2024-03-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Outreach@police.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><span><span><span><span>Gena Snead<br />Communications Officer<br />Georgia Tech Police Department</span></span></span></span></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673377</item>      </media>  <hg_media>          <item>          <nid>673377</nid>          <type>image</type>          <title><![CDATA[Soper and pup.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Soper and pup.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/03/13/Soper%20and%20pup.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/03/13/Soper%20and%20pup.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/03/13/Soper%2520and%2520pup.jpg?itok=lvsVY3Z7]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Sgt. Soper with K9]]></image_alt>                    <created>1710341150</created>          <gmt_created>2024-03-13 14:45:50</gmt_created>          <changed>1710340970</changed>          <gmt_changed>2024-03-13 14:42:50</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://police.gatech.edu/citizens-police-academy-0]]></url>        <title><![CDATA[Citizens Police Academy]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="64319"><![CDATA[Administration and Finance]]></group>          <group id="1214"><![CDATA[News Room]]></group>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="220261"><![CDATA[Finance and Planning]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="2543"><![CDATA[GTPD]]></keyword>          <keyword tid="55011"><![CDATA[community building]]></keyword>          <keyword tid="112991"><![CDATA[citizens police academy]]></keyword>          <keyword tid="181597"><![CDATA[construction notices construction facilities management]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="35921"><![CDATA[Facilities Management]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="673437">  <title><![CDATA[Infrastructure Improvements Affect Bobby Dodd Way at Crosland Tower March 18 - August]]></title>  <uid>35028</uid>  <body><![CDATA[<p>As part of the ongoing campus infrastructure upgrades, the sidewalk and a portion of Bobby Dodd Way NW will be closed beginning March 18 and last for approximately 5 months. This project includes the relocation of a gas line and the demolition of the existing steam vault (G9-10), followed by the installation of a larger steam vault.</p><p>Signage will be in place redirecting all traffic as needed.</p><p>The Fire Marshal’s office and GTPD has signed off on the proposed logistics plan. All handicap access to Crosland Tower will be maintained. The FDC’s located in the east alley will also have access in the event of a fire emergency.</p><p>Thank you for your assistance and be mindful of all safety rules around the construction site.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1710019507</created>  <gmt_created>2024-03-09 21:25:07</gmt_created>  <changed>1710019507</changed>  <gmt_changed>2024-03-09 21:25:07</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Ongoing campus infrastructure upgrades will affect the sidewalk and a portion of Bobby Dodd Way.]]></teaser>  <type>news</type>  <sentence><![CDATA[Ongoing campus infrastructure upgrades will affect the sidewalk and a portion of Bobby Dodd Way.]]></sentence>  <summary><![CDATA[<p>Ongoing campus infrastructure upgrades will affect the sidewalk and a portion of Bobby Dodd Way.</p>]]></summary>  <dateline>2024-03-09T00:00:00-05:00</dateline>  <iso_dateline>2024-03-09T00:00:00-05:00</iso_dateline>  <gmt_dateline>2024-03-09 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[brian.doles@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Brian Doles</p><p>Construction Project Manager - Special Projects</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>470-854-8262</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>673354</item>      </media>  <hg_media>          <item>          <nid>673354</nid>          <type>image</type>          <title><![CDATA[Bobby Dodd Way at Crosland Tower Construction Impacts]]></title>          <body><![CDATA[<p>Logistics map indicated construction impact to Bobby Dodd Way at Crosland Tower for relocation of a gas line and demolition of a steam vault.</p>]]></body>                      <image_name><![CDATA[bobby_dodd_construction_gas_line_steam_vault_march2024.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/03/09/bobby_dodd_construction_gas_line_steam_vault_march2024.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/03/09/bobby_dodd_construction_gas_line_steam_vault_march2024.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/03/09/bobby_dodd_construction_gas_line_steam_vault_march2024.jpg?itok=OQ9DH2_p]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics for Bobby Dodd Way construction March 2024.]]></image_alt>                    <created>1710019070</created>          <gmt_created>2024-03-09 21:17:50</gmt_created>          <changed>1710019070</changed>          <gmt_changed>2024-03-09 21:17:50</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="13283"><![CDATA[Bobby Dodd Way]]></keyword>          <keyword tid="193560"><![CDATA[steam vault]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="672599">  <title><![CDATA[East Campus Streetscape Project Enters Phase 2]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Update as of March 9:</p><p>*The Third Street sidewalk will reopen by March 16 and contractor will begin sidewalk, wall, and curb demolition on Techwood Drive in front of Field and Matheson residence halls beginning March 18. This phase is expected to last until early May. Updated logistics and pedestrian detour routes are attached. Once the sidewalk is reopened, the new bus stop will be constructed and traffic lanes will shift south until work is complete.</p><p>***</p><p>Phase 2 of the East Campus Streetscape Project will begin on Feb. 2 addressing Third Street and the entrance to the Third Street tunnel down to the sidewalk at Techwood Drive.&nbsp;Hydro barriers and fencing will be placed and demolition will begin Feb. 5. Once work on Third Street is complete the fencing will be shifted to the sidewalk in front of Field Residence Hall. A detailed traffic and pedestrian circulation plan will be distributed once approval is granted from the City of Atlanta.</p><p>Parking spaces along the north side of Third Street will be unavailable during construction. When work begins on Techwood Drive, a temporary bus stop will be created. Appropriate signage will direct both pedestrian and vehicular traffic.&nbsp;</p><p>Please note the sequencing and corresponding site plan for the East Campus Streetscape project.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1706741906</created>  <gmt_created>2024-01-31 22:58:26</gmt_created>  <changed>1710016655</changed>  <gmt_changed>2024-03-09 20:37:35</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Phase 2 work progresses.]]></teaser>  <type>news</type>  <sentence><![CDATA[Phase 2 work progresses.]]></sentence>  <summary><![CDATA[<p>Phase two of the East Campus Streetscape Project will address Third Street, the area near the Third Street tunnel, and the sidewalk in front of Field Residence Hall.&nbsp;</p>]]></summary>  <dateline>2024-01-31T00:00:00-05:00</dateline>  <iso_dateline>2024-01-31T00:00:00-05:00</iso_dateline>  <gmt_dateline>2024-01-31 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction | Infrastructure and Sustainability</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>672922</item>          <item>673353</item>      </media>  <hg_media>          <item>          <nid>672922</nid>          <type>image</type>          <title><![CDATA[East Campus Streetscape Phase 2 Map]]></title>          <body><![CDATA[<p>Map of logistics and dates for Phase 2 of East Campus Streetscape Project.</p>]]></body>                      <image_name><![CDATA[East Campus Streetscape Phase 2 Sequencing Plan 1.23.24jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/01/31/East%20Campus%20Streetscape%20Phase%202%20Sequencing%20Plan%201.23.24jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/01/31/East%20Campus%20Streetscape%20Phase%202%20Sequencing%20Plan%201.23.24jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/01/31/East%2520Campus%2520Streetscape%2520Phase%25202%2520Sequencing%2520Plan%25201.23.24jpg.jpg?itok=DyoHjac9]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics plan for phase two of East Campus Streetscape project]]></image_alt>                    <created>1706742724</created>          <gmt_created>2024-01-31 23:12:04</gmt_created>          <changed>1706743034</changed>          <gmt_changed>2024-01-31 23:17:14</gmt_changed>      </item>          <item>          <nid>673353</nid>          <type>image</type>          <title><![CDATA[East Campus Phase 2 A2_march2024.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Campus Phase 2 A2_march2024.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/03/09/East%20Campus%20Phase%202%20A2_march2024_0.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/03/09/East%20Campus%20Phase%202%20A2_march2024_0.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/03/09/East%2520Campus%2520Phase%25202%2520A2_march2024_0.jpg?itok=2brYeuwa]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[image of logistics plan for Phase 2 of East Campus Streetscape project]]></image_alt>                    <created>1710016429</created>          <gmt_created>2024-03-09 20:33:49</gmt_created>          <changed>1710016342</changed>          <gmt_changed>2024-03-09 20:32:22</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="672949">  <title><![CDATA[Human Resources Makes Temporary Move]]></title>  <uid>35084</uid>  <body><![CDATA[<p>Human Resource Services provided by the Administrative Services Center (ASC) are temporarily moving&nbsp;from their current location at 500 Tech Parkway across the street to 755 Marietta Street. The move, effective Feb.19, will accommodate&nbsp;renovations taking place in the Human Resources/ASC building. Our goal is to make this transition a seamless one.</p><p lang="EN-US">As part of the ongoing <a href="https://facilities.gatech.edu/node/9205" rel="noreferrer noopener" target="_blank">Campus Connectivity Plan</a>, this closure is necessary as we work towards enhancing our campus facilities for everyone's benefit.</p><p>Although in a new location, GTHR/ASC staff will continue to provide the same services and quality experiences you are used to receiving at 500 Tech Parkway.</p><h4>Services provided at 755 Marietta Street include:</h4><ul><li>Onboarding paperwork and processing (e.g. Form I-9).&nbsp;</li><li lang="EN-US">BuzzCard printing</li><li>Working with international employees and required documents</li><li>Resolving hiring and payment issues</li><li>Approval of name changes&nbsp;</li><li>Completing exit interviews</li><li>Assisting employees with questions and concerns</li></ul><h4>GTHR Visitor Parking</h4><p>Visitor parking spaces are available&nbsp;in the 755 Marietta Street parking lot. The remaining spaces are for permit holders only.&nbsp;Additional options for parking include 711 Marietta Street (Business Services) and 811 Marietta Street.&nbsp;</p><p>&nbsp;</p><h4>GTHR Employee Parking</h4><p>Employees with W04 parking permits can use the available spaces in the 755 Marietta Street parking lot that are not designated for visitors.&nbsp;Employees with W04 parking permits can use the available spaces in the 755 Marietta Street parking lot that are not designated for visitors.&nbsp;</p><p>Employees have the option of securing additional W04 Permit parking at&nbsp;711 Marietta St. Additionally, in&nbsp;case all W04 locations are at capacity, alternative parking options at W01 and W06 are available for W04 permit holders.</p><p>&nbsp;</p>]]></body>  <author>cgrant60</author>  <status>1</status>  <created>1707928621</created>  <gmt_created>2024-02-14 16:37:01</gmt_created>  <changed>1709932390</changed>  <gmt_changed>2024-03-08 21:13:10</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[On Feb.19 Human Resource Services will temporarily relocate.]]></teaser>  <type>news</type>  <sentence><![CDATA[On Feb.19 Human Resource Services will temporarily relocate.]]></sentence>  <summary><![CDATA[<p>The move to 755 Marietta Street is&nbsp;effective Feb. 19, to accommodate&nbsp;renovations to the parking lot and pedestrian walkways.&nbsp;</p>]]></summary>  <dateline>2024-02-14T00:00:00-05:00</dateline>  <iso_dateline>2024-02-14T00:00:00-05:00</iso_dateline>  <gmt_dateline>2024-02-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[In-Person Services Available Next Door at 755 Marietta Street]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="64319"><![CDATA[Administration and Finance]]></group>          <group id="64303"><![CDATA[Human Resources]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="2775"><![CDATA[human resources]]></keyword>          <keyword tid="172304"><![CDATA[GTHR]]></keyword>          <keyword tid="168696"><![CDATA[Georgia Tech Human Resources]]></keyword>          <keyword tid="4210"><![CDATA[move]]></keyword>          <keyword tid="190723"><![CDATA[temporary move to 755]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="672690">  <title><![CDATA[Construction Begins for Celebrating Women at Georgia Tech Installation Near the Student Center Pathways]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning February 19, 2024, construction and infrastructure work will begin for the Celebrating Women at Georgia Tech installation.&nbsp; Normal work hours will be Monday - Friday 6:30 a.m. to 5:30 p.m.</p><p>Construction fencing will be installed around the site perimeter and a section of the sidewalk with direct paths to the John Lewis Student Center and the Ferst Center for the Arts will be temporary closed. All pedestrian traffic will be re-routed around these two buildings to the routes shown in the logistics plan below.&nbsp;</p><p>This project installation is expected to be complete in early October 2024. Click <a href="https://facilities.gatech.edu/exterior-projects">here</a> for more information.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1706827732</created>  <gmt_created>2024-02-01 22:48:52</gmt_created>  <changed>1709054204</changed>  <gmt_changed>2024-02-27 17:16:44</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Fencing installed near the Student Center for the construction of the Women's Walk.]]></teaser>  <type>news</type>  <sentence><![CDATA[Fencing installed near the Student Center for the construction of the Women's Walk.]]></sentence>  <summary><![CDATA[<p>The Celebrating Women installation will illuminate the history of women at Georgia Tech, including staff, faculty, and alumnae. Fencing will be installed around the installation site.</p>]]></summary>  <dateline>2024-02-01T00:00:00-05:00</dateline>  <iso_dateline>2024-02-01T00:00:00-05:00</iso_dateline>  <gmt_dateline>2024-02-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[carla.barbour@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Carla Barbour, PMP, LEED AP</p><p>Sr. Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-242-7351</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>672937</item>      </media>  <hg_media>          <item>          <nid>672937</nid>          <type>image</type>          <title><![CDATA[Campus Impacts for Construction of Women's Walk]]></title>          <body><![CDATA[<p>image depicting fencing and detours on campus for the Women's Walk installation</p>]]></body>                      <image_name><![CDATA[womens_walk_fencing_logistics_feb2024.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/02/01/womens_walk_fencing_logistics_feb2024.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/02/01/womens_walk_fencing_logistics_feb2024.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/02/01/womens_walk_fencing_logistics_feb2024.jpg?itok=gY1AaT_r]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[image depicting fencing and detours on campus for the Women's Walk installation]]></image_alt>                    <created>1706826981</created>          <gmt_created>2024-02-01 22:36:21</gmt_created>          <changed>1707152184</changed>          <gmt_changed>2024-02-05 16:56:24</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="193481"><![CDATA[Women&#039;s Walk]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="672739">  <title><![CDATA[Sidewalk and Lane Closures for Techwood Drive Begin Feb. 7]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The sidewalk along Techwood Drive between North Avenue and Bobby Dodd Way will be unavailable for an extended time beginning Wednesday, Feb. 7, and continuing through early March 2026. &nbsp;</p><p>This two-year timespan is due to construction work beginning on the Thomas A. Fanning Student-Athlete Performance Center, to be built on the footprint of the Edge/Rice Center in the northeast corner of Bobby Dodd Stadium. &nbsp;</p><p>In addition to the sidewalk, the southbound traffic lane of Techwood Drive will also be closed to thru traffic beginning Monday, Feb. 12. Techwood Drive northbound traffic will remain open.&nbsp;</p><p>Additionally, the sidewalk along Bobby Dodd Way adjacent to the stadium will be closed from Feb. 12 through Sept. 1.&nbsp;</p><p>Detour routes and associated signage will be in place to ensure the safety of pedestrian and vehicular movement through the area.&nbsp;</p><p>Read more about the planned Fanning <a href="https://ramblinwreck.com/student-athlete-performance-center-to-be-named-in-honor-of-fanning/" rel="noreferrer noopener" target="_blank">Student-Athlete Performance Center</a>. &nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1707152966</created>  <gmt_created>2024-02-05 17:09:26</gmt_created>  <changed>1707232495</changed>  <gmt_changed>2024-02-06 15:14:55</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Site preparations begin this week for the construction of the Thomas A. Fanning Student-Athlete Performance Center slated to replace the Edge/Rice building. ]]></teaser>  <type>news</type>  <sentence><![CDATA[Site preparations begin this week for the construction of the Thomas A. Fanning Student-Athlete Performance Center slated to replace the Edge/Rice building. ]]></sentence>  <summary><![CDATA[<p>Site preparations begin this week for the construction of the Thomas A. Fanning Student-Athlete Performance Center slated to replace the Edge/Rice building.&nbsp;</p>]]></summary>  <dateline>2024-02-05T00:00:00-05:00</dateline>  <iso_dateline>2024-02-05T00:00:00-05:00</iso_dateline>  <gmt_dateline>2024-02-05 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[heather.hardie@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:heather.hardie@facilities.gatech.edu">Heather Hardie</a></p><p>Senior Construction Manager</p><p>Planning, Design, and Construction | Infrastructure and Sustainability</p><p>470-553-6469</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>672959</item>          <item>672960</item>          <item>672962</item>          <item>672963</item>      </media>  <hg_media>          <item>          <nid>672959</nid>          <type>image</type>          <title><![CDATA[SAPC Construction Techwood Sidewalk Closure]]></title>          <body><![CDATA[<p>Logistics map of sidewalk closure for SAPC construction</p>]]></body>                      <image_name><![CDATA[SAPC_Sidewalk and lane closure_Page_1.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/02/05/SAPC_Sidewalk%20and%20lane%20closure_Page_1.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/02/05/SAPC_Sidewalk%20and%20lane%20closure_Page_1.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/02/05/SAPC_Sidewalk%2520and%2520lane%2520closure_Page_1.png?itok=7iWFEdUI]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of sidewalk closure for SAPC construction]]></image_alt>                    <created>1707151857</created>          <gmt_created>2024-02-05 16:50:57</gmt_created>          <changed>1707152077</changed>          <gmt_changed>2024-02-05 16:54:37</gmt_changed>      </item>          <item>          <nid>672960</nid>          <type>image</type>          <title><![CDATA[SAPC Construction Techwood Sidewalk and Street Closure]]></title>          <body><![CDATA[<p>Map of sidewalk and street closure for SAPC construction.</p>]]></body>                      <image_name><![CDATA[SAPC_Sidewalk and lane closure_Page_2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/02/05/SAPC_Sidewalk%20and%20lane%20closure_Page_2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/02/05/SAPC_Sidewalk%20and%20lane%20closure_Page_2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/02/05/SAPC_Sidewalk%2520and%2520lane%2520closure_Page_2.png?itok=NOmh7PVm]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of sidewalk and southbound lance Techwood Drive closure for SAPC construction]]></image_alt>                    <created>1707152208</created>          <gmt_created>2024-02-05 16:56:48</gmt_created>          <changed>1707152354</changed>          <gmt_changed>2024-02-05 16:59:14</gmt_changed>      </item>          <item>          <nid>672962</nid>          <type>image</type>          <title><![CDATA[SAPC Construction Detour Map]]></title>          <body><![CDATA[<p>Map of detour route for southbound lane closure of Techwood Drive for SAPC construction.</p>]]></body>                      <image_name><![CDATA[SAPC_Sidewalk and lane closure_Page_3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/02/05/SAPC_Sidewalk%20and%20lane%20closure_Page_3.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/02/05/SAPC_Sidewalk%20and%20lane%20closure_Page_3.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/02/05/SAPC_Sidewalk%2520and%2520lane%2520closure_Page_3.png?itok=BcVYapdm]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Map of detour route for southbound lane closure of Techwood Drive for SAPC construction.]]></image_alt>                    <created>1707152377</created>          <gmt_created>2024-02-05 16:59:37</gmt_created>          <changed>1707152511</changed>          <gmt_changed>2024-02-05 17:01:51</gmt_changed>      </item>          <item>          <nid>672963</nid>          <type>image</type>          <title><![CDATA[SAPC Construction Bobby Dodd Way Sidewalk Closure]]></title>          <body><![CDATA[<p>Map of sidewalk closure on Bobby Dodd Way for SAPC construction.</p>]]></body>                      <image_name><![CDATA[SAPC_Sidewalk and lane closure_Page_4.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2024/02/05/SAPC_Sidewalk%20and%20lane%20closure_Page_4.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2024/02/05/SAPC_Sidewalk%20and%20lane%20closure_Page_4.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2024/02/05/SAPC_Sidewalk%2520and%2520lane%2520closure_Page_4.png?itok=jxENuVXP]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Map of sidewalk closure on Bobby Dodd Way for SAPC construction.]]></image_alt>                    <created>1707152523</created>          <gmt_created>2024-02-05 17:02:03</gmt_created>          <changed>1707152710</changed>          <gmt_changed>2024-02-05 17:05:10</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192186"><![CDATA[Student Athlete Performance Center]]></keyword>          <keyword tid="188001"><![CDATA[Techwood Drive]]></keyword>          <keyword tid="13283"><![CDATA[Bobby Dodd Way]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="671571">  <title><![CDATA[Utility Investigation Work Begins Dec. 18 for Tech Square Phase 3]]></title>  <uid>35028</uid>  <body><![CDATA[<p>There is upcoming utility work planned for the Tech Square 3 construction site on Fifth Street between Spring and W Peachtree.&nbsp;</p><p><strong>UPCOMING UTILITY INVESTIGATIVE WORK</strong></p><p>• Below grade investigative work is anticipated to begin on Dec.18 in the South lane of 5th Street. Please note this will result in a lane closure for the south side of Fifth Street between Spring Street and West Peachtree Street for approximately ten days.</p><p>• Upon completion of South Lane investigative work, North Lane investigative work will begin. This will result in a lane closure for the north side of Fifth Street between Spring Street and W. Peachtree Street for approximately ten days.</p><p>• Investigative work will take place from the hours of 9am-4pm ET. Normal traffic will resume outside the hours of 9am - 4pm ET.</p><p>• All of the Fifth Street Investigative work (South and North Lanes) is anticipated to be complete on, or near, Jan. 8, 2024. (A three-moratorium is in effect from the DOT for the holidays during the week of Dec. 25.)</p><p>• Once investigative work has concluded on Fifth Street, additional work will commence on Biltmore Avenue lasting approximately 2 weeks.</p><p>&nbsp;</p><p><strong>UPCOMING UTILITY WORK</strong></p><p>• Georgia Tech anticipates the subsequent installation and utility work in Fifth Street to take place in middle to late January. Precise dates have not been established at this time.</p><p>• The installation and utility work on Fifth Street may result in 24-hour closure of lanes and the north sidewalk. Additional communications will be circulated prior to 24-hour closures.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1702573631</created>  <gmt_created>2023-12-14 17:07:11</gmt_created>  <changed>1704986635</changed>  <gmt_changed>2024-01-11 15:23:55</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Upcoming utility work is planned for Tech Square Phase 3.]]></teaser>  <type>news</type>  <sentence><![CDATA[Upcoming utility work is planned for Tech Square Phase 3.]]></sentence>  <summary><![CDATA[<p>Bike and traffic flow will be affected on Fifth Street around Tech Square Phase 3 construction site for utility investigation work.</p>]]></summary>  <dateline>2023-12-14T00:00:00-05:00</dateline>  <iso_dateline>2023-12-14T00:00:00-05:00</iso_dateline>  <gmt_dateline>2023-12-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Lindsey Cottingham</p><p>Capital Projects Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-433-4268</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>672583</item>      </media>  <hg_media>          <item>          <nid>672583</nid>          <type>image</type>          <title><![CDATA[Utility Work for Tech Square Phase 3]]></title>          <body><![CDATA[<p>Image of vehicular detour for Fifth Street Utility Investigation Work for Tech Square Phase 3</p>]]></body>                      <image_name><![CDATA[Dec 12th Week - TS3 Newsletter - Utility Investigation Plan ImpactJPG_Page_3.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/12/14/Dec%2012th%20Week%20-%20TS3%20Newsletter%20-%20Utility%20Investigation%20Plan%20ImpactJPG_Page_3.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/12/14/Dec%2012th%20Week%20-%20TS3%20Newsletter%20-%20Utility%20Investigation%20Plan%20ImpactJPG_Page_3.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/12/14/Dec%252012th%2520Week%2520-%2520TS3%2520Newsletter%2520-%2520Utility%2520Investigation%2520Plan%2520ImpactJPG_Page_3.jpg?itok=wXXgkCdL]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[image of vehicular detour for Fifth Street Utility Investigation Work for Tech Square Phase 3]]></image_alt>                    <created>1702573779</created>          <gmt_created>2023-12-14 17:09:39</gmt_created>          <changed>1702576226</changed>          <gmt_changed>2023-12-14 17:50:26</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="192181"><![CDATA[Tech Square Phase 3]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="671636">  <title><![CDATA[Electrical Expansion Project Enters Phase 2]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Dec. 18, phase 2 of the Loop B project will begin. A new road detour will be in place. Curran Street and 9th. Street will have traffic flowing in the OPPOSITE direction to avoid the road crossing closure at the Curran Street and the 8th Street intersection. Detour signs will be in place and the Georgia Teach Police Department will be assisting with the traffic detour for the first few days to ensure the detour is efficient and safe. The road will reopen to normal operation for Student Move-in from 1/3/24-1/5/24.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1702994767</created>  <gmt_created>2023-12-19 14:06:07</gmt_created>  <changed>1702994918</changed>  <gmt_changed>2023-12-19 14:08:38</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Road detour required for phase 2 of the Loop B electrical expansion project.]]></teaser>  <type>news</type>  <sentence><![CDATA[Road detour required for phase 2 of the Loop B electrical expansion project.]]></sentence>  <summary><![CDATA[<p>As the campus electrical expansion project continues, Loop B enters phase 2 and will require a road detour.</p>]]></summary>  <dateline>2023-12-19T00:00:00-05:00</dateline>  <iso_dateline>2023-12-19T00:00:00-05:00</iso_dateline>  <gmt_dateline>2023-12-19 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Chris B. Williams</strong></p><p>Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure &amp; Sustainability&nbsp;&nbsp;</p><p>470-553-7197</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>672613</item>      </media>  <hg_media>          <item>          <nid>672613</nid>          <type>image</type>          <title><![CDATA[Electrical Expansion Project - Loop B]]></title>          <body><![CDATA[<p>Detour route for campus electrical expansion project at Curran Street and 9th Street.</p>]]></body>                      <image_name><![CDATA[Loop B Phase 2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/12/19/Loop%20B%20Phase%202.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/12/19/Loop%20B%20Phase%202.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/12/19/Loop%2520B%2520Phase%25202.jpg?itok=KcNcmD0L]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of road detour for electrical expansion project]]></image_alt>                    <created>1702994213</created>          <gmt_created>2023-12-19 13:56:53</gmt_created>          <changed>1702994400</changed>          <gmt_changed>2023-12-19 14:00:00</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="193112"><![CDATA[electrical expansion project]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="671542">  <title><![CDATA[East Campus Streetscape Milling and Paving]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Monday December 18, 4th&nbsp;Street from the Architecture/Library crossing to 100’ west of Techwood Drive will be milled and then paved. One lane of traffic will remain open with flagmen directing cars through the construction area. The entry to the alleyways off of Fowler Street, between 4th&nbsp;and 5th Streets, will be repaved with concrete. The West driveway will be prioritized (highlighted in red) for 12/18 – 12/20.</p><p>Next, milling and paving will occur for the driveway east of Fowler&nbsp;(highlighted in orange) for 12/20 – 12/21. The alleyway on the west side will be inaccessible for the proposed duration. The east alleyway will be accessible via Techwood Drive.</p><p>The new entry and exit way to Peters Parking Deck on Brittain Drive will open Monday, December 18 to accommodate for the 4th street milling and paving.</p><p>If you have any questions or concerns, please contact Jerry Young, Landscape Project Manager, Infrastructure and Sustainability.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1702404481</created>  <gmt_created>2023-12-12 18:08:01</gmt_created>  <changed>1702494763</changed>  <gmt_changed>2023-12-13 19:12:43</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Milling and paving work to occur 12/18 - 12/21.]]></teaser>  <type>news</type>  <sentence><![CDATA[Milling and paving work to occur 12/18 - 12/21.]]></sentence>  <summary><![CDATA[<p>Milling and paving work for the East Campus Streetscape improvement project will occur 12/18 - 12/21.</p>]]></summary>  <dateline>2023-12-12T00:00:00-05:00</dateline>  <iso_dateline>2023-12-12T00:00:00-05:00</iso_dateline>  <gmt_dateline>2023-12-12 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-585-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>672555</item>      </media>  <hg_media>          <item>          <nid>672555</nid>          <type>image</type>          <title><![CDATA[4th Street Paving ]]></title>          <body><![CDATA[<p>Logistics map of planned paving.</p>]]></body>                      <image_name><![CDATA[paving_Fowler_dec2023.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/12/12/paving_Fowler_dec2023.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/12/12/paving_Fowler_dec2023.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/12/12/paving_Fowler_dec2023.png?itok=QGwFloHS]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of planned paving]]></image_alt>                    <created>1702402832</created>          <gmt_created>2023-12-12 17:40:32</gmt_created>          <changed>1702403010</changed>          <gmt_changed>2023-12-12 17:43:30</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="192184"><![CDATA[East Campus Streetscape]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="671242">  <title><![CDATA[Utility Work for Tech Square Phase 3 to Close One Lane of Spring Street From 11/28 - 12/15]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The first phase of utility work for Tech Square Phase 3 will begin in the public right of way on Tuesday, November 28.&nbsp; One lane of Spring Street will be closed at a time at the intersection of Spring Street and Biltmore Place. Work is expected to last approximately 2 - 3 weeks. When impacted, pedestrian traffic will be diverted to the west sidewalk of Spring Street at either Abercrombie Place or Fifth Street crossings. All other lanes of Spring Street remain open. If you are a building manager, please let your building occupants know.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1701108818</created>  <gmt_created>2023-11-27 18:13:38</gmt_created>  <changed>1701114281</changed>  <gmt_changed>2023-11-27 19:44:41</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[One lane of Spring Street will be closed at the intersection of Spring Street and Biltmore Place with work expected to last approximately 2 -3 weeks.]]></teaser>  <type>news</type>  <sentence><![CDATA[One lane of Spring Street will be closed at the intersection of Spring Street and Biltmore Place with work expected to last approximately 2 -3 weeks.]]></sentence>  <summary><![CDATA[<p>The first phase of utility work for Tech Square Phase 3 will begin in the public right of way on Tuesday, November 28.&nbsp; One lane of Spring Street will be closed at a time at the intersection of Spring Street and Biltmore Place</p>]]></summary>  <dateline>2023-11-27T00:00:00-05:00</dateline>  <iso_dateline>2023-11-27T00:00:00-05:00</iso_dateline>  <gmt_dateline>2023-11-27 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Lindsey Cottingham, PE, LEED AP</p><p>Capital Projects Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-433-4268</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>672452</item>      </media>  <hg_media>          <item>          <nid>672452</nid>          <type>image</type>          <title><![CDATA[TS3 - Public ROW Newsletter - 11.22.23_jpg.jpg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[TS3 - Public ROW Newsletter - 11.22.23_jpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/11/27/TS3%20-%20Public%20ROW%20Newsletter%20-%2011.22.23_jpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/11/27/TS3%20-%20Public%20ROW%20Newsletter%20-%2011.22.23_jpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/11/27/TS3%2520-%2520Public%2520ROW%2520Newsletter%2520-%252011.22.23_jpg.jpg?itok=MRDrOX2x]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of planned street closure and accompanying language for Tech Square Phase 3 utility work]]></image_alt>                    <created>1701108847</created>          <gmt_created>2023-11-27 18:14:07</gmt_created>          <changed>1701108847</changed>          <gmt_changed>2023-11-27 18:14:07</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="64319"><![CDATA[Administration and Finance]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="134861"><![CDATA[Institute and Campus]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="182635"><![CDATA[Facilities-Notices; campus construction]]></keyword>          <keyword tid="192181"><![CDATA[Tech Square Phase 3]]></keyword>          <keyword tid="193308"><![CDATA[Utility work]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="671119">  <title><![CDATA[Removal of Large Oak Tree Near Tech Lawn]]></title>  <uid>35028</uid>  <body><![CDATA[<p>After years of careful monitoring, the post oak, or <em>Quercus stellata</em>, near Tech Lawn has been deemed hazardous and must be removed due to the risk of falling. For safety reasons, plans are to remove the tree during the Thanksgiving break. &nbsp;</p><p>“Before removing a tree, we have an outside vendor evaluate the tree to ensure our assessment is correct,” said Quentin Holden, campus tree surgeon. “While we have done everything possible to help the tree survive, the tree is leaning heavily, and a structural issue has been recently discovered at the tree’s base putting it at severe risk of failure. It must be removed for campus safety.”&nbsp;</p><p>The wood from this tree will not be reused as lumber due to the curvature of the tree trunk. Wood harvested for lumber needs to have straight trunks to minimize warping and checking (separating or cracking). With the removal of the oak, multiple trees will be planted on campus, or funds equivalent to the replacement will be provided to the tree bank, in accordance with the Campus Landscape Master Plan and the Tree Care Replacement Policy. Locations for replacement trees will be identified and the trees planted in the appropriate season. Currently, the campus tree count totals more than 15,000 trees with an estimated total replacement value of more than $11 million.&nbsp;</p><p>Institute Landscape Architect Jason Gregory said, “We’re always sad when we have to remove such a large tree on campus, but it is part of the management of our urban forest to maintain a safe environment for everyone.”&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1700158330</created>  <gmt_created>2023-11-16 18:12:10</gmt_created>  <changed>1700189848</changed>  <gmt_changed>2023-11-17 02:57:28</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[A post oak near the drive between Tech Lawn and the adjacent hill will be removed during Thanksgiving break.]]></teaser>  <type>news</type>  <sentence><![CDATA[A post oak near the drive between Tech Lawn and the adjacent hill will be removed during Thanksgiving break.]]></sentence>  <summary><![CDATA[<p>A post oak near the drive between Tech Lawn and the adjacent hill will be removed during Thanksgiving break.</p>]]></summary>  <dateline>2023-11-16T00:00:00-05:00</dateline>  <iso_dateline>2023-11-16T00:00:00-05:00</iso_dateline>  <gmt_dateline>2023-11-16 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cathy.brim@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:cathy.brim@gatech.edu">Cathy Brim</a></p><p>Communications Officer II</p><p>Institute Communications/Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>672399</item>      </media>  <hg_media>          <item>          <nid>672399</nid>          <type>image</type>          <title><![CDATA[Post Oak Removed November 2023]]></title>          <body><![CDATA[<p>The large post oak scheduled to be removed November 2023.</p>]]></body>                      <image_name><![CDATA[MicrosoftTeams-image (10).png]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/11/16/MicrosoftTeams-image%20%2810%29.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/11/16/MicrosoftTeams-image%20%2810%29.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/11/16/MicrosoftTeams-image%2520%252810%2529.png?itok=6_ii7qE4]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[image of post oak tree removed from hill November 2023]]></image_alt>                    <created>1700157832</created>          <gmt_created>2023-11-16 18:03:52</gmt_created>          <changed>1700158109</changed>          <gmt_changed>2023-11-16 18:08:29</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="117621"><![CDATA[landscape services]]></keyword>          <keyword tid="141571"><![CDATA[tree removal]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="670496">  <title><![CDATA[Ground Blasting Work to Begin for Tech Square Phase 3]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Tech Square Phase 3 construction project will require ground blasting to remove granite rock to prepare for the building's foundation. The blasting will begin the week of October 23 and possibly continue for two to four weeks. Blasting is expected to take place on weekdays at approximately 2:15 p.m. during the proposed period.</p><p>Blasting notification for the surrounding area will occur as follows. (Times are approximate.)</p><ul><li><p>At 2:10 p.m., <strong>five</strong>&nbsp;long horns will sound.</p></li><li><p>At 2:14 p.m., <strong>three</strong>&nbsp;horns will sound and then an all-clear horn.</p></li><li><p>In the event that detonation is unsuccessful,&nbsp;the contractor will either attempt the detonation again, before 3:30 p.m., or postpone the blast until the next&nbsp;day.</p></li></ul><p>Due to ground conditions, the horn notification is expected to be more disruptive than the blasting itself.&nbsp; Vibrations will be noticeable in the surrounding areas, and a series of seismographs have been installed in the surrounding buildings to monitor vibrations.</p><p>The Biltmore Place roadway will be closed when blasts are planned for the north end of the construction site. Spring Street, West Peachtree Street, and Fifth Street will remain open to vehicular traffic. Depending upon the blast location within the construction site, pedestrian traffic directly along the fence may be closed in the 10 minutes leading up to the ground blast.</p><ul></ul><p>Ground blasting will occur as needed and may not happen every day. When blasting is planned, Georgia Tech will notify building and facility managers in the vicinity via email within 24 hours of each blast.&nbsp;</p><p>To be added to the blast notification communication list, contact Lindsey Cottingham, senior project manager for Planning, Design, and Construction, at <a href="lindsey.cottingham@facilities.gatech.edu">lindsey.cottingham@facilities.gatech.edu</a>.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1697648249</created>  <gmt_created>2023-10-18 16:57:29</gmt_created>  <changed>1698076515</changed>  <gmt_changed>2023-10-23 15:55:15</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Foundation work for the construction project requires blasting for rock removal.]]></teaser>  <type>news</type>  <sentence><![CDATA[Foundation work for the construction project requires blasting for rock removal.]]></sentence>  <summary><![CDATA[<p>Beginning the week of October 23, and continuing for the next two to four weeks, foundation work for the Tech Square Phase 3 project will require blasting to remove granite rock. Occupants in nearby buildings should anticipate disturbances.</p>]]></summary>  <dateline>2023-10-18T00:00:00-04:00</dateline>  <iso_dateline>2023-10-18T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-10-18 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:Lindsey.cottingham@facilities.gatech.edu">Lindsey Cottingham</a></p><p>Senior Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>672125</item>      </media>  <hg_media>          <item>          <nid>672125</nid>          <type>image</type>          <title><![CDATA[Rendering of Tech Square Phase 3]]></title>          <body><![CDATA[<p>Rendering of Tech Square Phase 3. Image is subject to change as project progresses.</p>]]></body>                      <image_name><![CDATA[23_0707_GTech_CAM001_EXT_DUSK_V954 Graypng.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/10/20/23_0707_GTech_CAM001_EXT_DUSK_V954%20Graypng.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/10/20/23_0707_GTech_CAM001_EXT_DUSK_V954%20Graypng.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/10/20/23_0707_GTech_CAM001_EXT_DUSK_V954%2520Graypng.png?itok=yNaULv0W]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[rendering of Tech Square Phase 3]]></image_alt>                    <created>1697834550</created>          <gmt_created>2023-10-20 20:42:30</gmt_created>          <changed>1698070334</changed>          <gmt_changed>2023-10-23 14:12:14</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://oxblue.com/open/mv/gatechphase3]]></url>        <title><![CDATA[Live webcam of Tech Square Phase 3 construction site.]]></title>      </link>          <link>        <url><![CDATA[https://facilities.gatech.edu/node/9183]]></url>        <title><![CDATA[More information.]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="192181"><![CDATA[Tech Square Phase 3]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="193188"><![CDATA[foundation construction]]></keyword>          <keyword tid="193189"><![CDATA[blasting]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="35921"><![CDATA[Facilities Management]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="670050">  <title><![CDATA[West Campus Electrical Expansion Project Closes Curran Street October 2 through Mid-December]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning October 2, phase 1 of a 6-phase project will commence on West Campus. Phase 1 will consist of work along the center/east side of Curran Street between 8th&nbsp;and 9th&nbsp;streets. Construction fencing will be in place blocking off access to Curran Street. Traffic will be rerouted through the Woodruff Parking lot as seen on the logistics Plan. Parking in this lot will still be useable. The sidewalk on the west side of Curran Street will still be accessible for pedestrian traffic. Phase 1 duration is ~10 weeks (December 7th). There will be an officer from GTPD on site on Monday, October 2 to help facilitate the detour and confirm all proper barricades and signage is in place for this 10 week project.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1696017055</created>  <gmt_created>2023-09-29 19:50:55</gmt_created>  <changed>1696017217</changed>  <gmt_changed>2023-09-29 19:53:37</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Electrical expansion work will affect the east side of Curran Street between 8th and 9th street. ]]></teaser>  <type>news</type>  <sentence><![CDATA[Electrical expansion work will affect the east side of Curran Street between 8th and 9th street. ]]></sentence>  <summary><![CDATA[<p>Curran Street will be closed from October 2 through mid-December with traffic detoured through the Woodruff Parking lot.&nbsp;</p>]]></summary>  <dateline>2023-09-29T00:00:00-04:00</dateline>  <iso_dateline>2023-09-29T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-09-29 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Chris B. Williams</p><p>Project Manager</p><p>Planning, Design, and Construction | Infrastructure and Sustainability</p><p>470-553-7197</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>671907</item>      </media>  <hg_media>          <item>          <nid>671907</nid>          <type>image</type>          <title><![CDATA[West Campus Electrical Expansion Project Closes Curran Street October 2 through Mid-December]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Loop B Phase 1 Curran St..png]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/09/29/Loop%20B%20Phase%201%20Curran%20St..png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/09/29/Loop%20B%20Phase%201%20Curran%20St..png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/09/29/Loop%2520B%2520Phase%25201%2520Curran%2520St..png?itok=-SOnWoHH]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Logistics plan for electrical expansion causing closure of Curran Street October 2 through Mid-December]]></image_alt>                    <created>1696016421</created>          <gmt_created>2023-09-29 19:40:21</gmt_created>          <changed>1696016721</changed>          <gmt_changed>2023-09-29 19:45:21</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="193112"><![CDATA[electrical expansion project]]></keyword>          <keyword tid="193113"><![CDATA[Curran Street]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="669572">  <title><![CDATA[Tech Square Phase 3 Construction Work Begins]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Site fencing has been installed and construction is underway for Tech Square Phase 3. Significant utility work will require some disruption of surrounding streets. Initially one lane of Spring Street will close at a time. All other lanes of Spring Street will remain open. This initial phase is expected to last from mid-September to late October. Monthly updates will be issued as the project progresses.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1694400822</created>  <gmt_created>2023-09-11 02:53:42</gmt_created>  <changed>1694402119</changed>  <gmt_changed>2023-09-11 03:15:19</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Utility work begins requiring one lane of traffic to be closed on Spring Street near Biltmore Place.]]></teaser>  <type>news</type>  <sentence><![CDATA[Utility work begins requiring one lane of traffic to be closed on Spring Street near Biltmore Place.]]></sentence>  <summary><![CDATA[<p>Phased construction work begins this week for Tech Square Phase 3.&nbsp;</p>]]></summary>  <dateline>2023-09-10T00:00:00-04:00</dateline>  <iso_dateline>2023-09-10T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-09-10 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Lindsey.cottingham@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Lindsey Cottingham, PE, LEED AP</p><p>Senior Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404-433-4268</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>671666</item>      </media>  <hg_media>          <item>          <nid>671666</nid>          <type>image</type>          <title><![CDATA[TECH SQUARE 3A - UTILITY PHASING PLAN_2023-09-07_Page_2.jpg]]></title>          <body><![CDATA[<p>Logistics plan for phased construction of Tech Square Phase 3. Mid-September.</p>]]></body>                      <image_name><![CDATA[TECH SQUARE 3A - UTILITY PHASING PLAN_2023-09-07_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/09/10/TECH%20SQUARE%203A%20-%20UTILITY%20PHASING%20PLAN_2023-09-07_Page_2_1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/09/10/TECH%20SQUARE%203A%20-%20UTILITY%20PHASING%20PLAN_2023-09-07_Page_2_1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/09/10/TECH%2520SQUARE%25203A%2520-%2520UTILITY%2520PHASING%2520PLAN_2023-09-07_Page_2_1.jpg?itok=J_aCpLTE]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Logistics plan for construction Tech Square Phase 3]]></image_alt>                    <created>1694401907</created>          <gmt_created>2023-09-11 03:11:47</gmt_created>          <changed>1694401907</changed>          <gmt_changed>2023-09-11 03:11:47</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[entity:node/662433]]></url>        <title><![CDATA[]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="179355"><![CDATA[Building Construction]]></category>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="179355"><![CDATA[Building Construction]]></term>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192181"><![CDATA[Tech Square Phase 3]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="669493">  <title><![CDATA[Northside Drive and 10th Street Pylon Signage Replacement Work Begins]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Monday 9/11 fencing and erosion control for the Northside Dr. &amp; 10th St. Pylon Signage project will begin&nbsp;along the southeast corner of Northside Drive and 10th&nbsp;Street. This site preparation will be followed by demolition and grading of the area&nbsp;where the sidewalk and lanes will be closed along this location. The Planning, Design and Construction department is working closely with the Georgia Department of Transportation and the Atlanta Department of Transporation to coordinate this work.&nbsp;The project is anticipated to run until&nbsp;2/22/24.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1694027435</created>  <gmt_created>2023-09-06 19:10:35</gmt_created>  <changed>1694027463</changed>  <gmt_changed>2023-09-06 19:11:03</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Fencing and erosion control will begin September 11 in preparation for site work.]]></teaser>  <type>news</type>  <sentence><![CDATA[Fencing and erosion control will begin September 11 in preparation for site work.]]></sentence>  <summary><![CDATA[<p>Beginning Monday September 11, work will begin for the Northside Drive and 10th Street pylon signage project.</p>]]></summary>  <dateline>2023-09-06T00:00:00-04:00</dateline>  <iso_dateline>2023-09-06T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-09-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[blake.baklini@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Blake Baklini</p><p>Construction Project Manager / Planning, Design, and Construction</p><p><em>a department of Infrastructure and Sustainability</em></p><p>The Georgia Institute of Technology</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>671619</item>      </media>  <hg_media>          <item>          <nid>671619</nid>          <type>image</type>          <title><![CDATA[Logistics Plan for Northside Dr. and 10th Street pylon signage replacement]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[monuments_northside_tenth.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/09/06/monuments_northside_tenth.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/09/06/monuments_northside_tenth.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/09/06/monuments_northside_tenth.png?itok=7RmGzhKg]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[logistics plan for replacing logo monument (pylons) on Northside and 10th Street]]></image_alt>                    <created>1694026726</created>          <gmt_created>2023-09-06 18:58:46</gmt_created>          <changed>1694026901</changed>          <gmt_changed>2023-09-06 19:01:41</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="42291"><![CDATA[northside drive]]></keyword>          <keyword tid="14938"><![CDATA[10th Street]]></keyword>          <keyword tid="193023"><![CDATA[pylon signage]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="669319">  <title><![CDATA[Veterans Walk of Honor Construction Underway]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The east stairs at the amphitheater between MS&amp;E and ES&amp;T will be closed with all pedestrian traffic routing to the west amphitheater stairs. The upper pedestrian walkway leading to the Veterans Resource Center will detour around the construction site near the northwest corner of ES&amp;T and then transition back to the main walkway. The estimated construction timeline is end of August through November 5th. As construction progresses, areas will reopen.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1693501595</created>  <gmt_created>2023-08-31 17:06:35</gmt_created>  <changed>1693501799</changed>  <gmt_changed>2023-08-31 17:09:59</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction mobilizes on the planned tribute walkway outside the Veterans Resource Center.]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction mobilizes on the planned tribute walkway outside the Veterans Resource Center.]]></sentence>  <summary><![CDATA[<p>The attached logistics and circulation plan outlines the planned fencing installation, walkway closures, and pathway detours while this tribute project is under construction.</p>]]></summary>  <dateline>2023-08-31T00:00:00-04:00</dateline>  <iso_dateline>2023-08-31T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-08-31 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jerry Young</p><p>Landscape Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>404--565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>671558</item>      </media>  <hg_media>          <item>          <nid>671558</nid>          <type>image</type>          <title><![CDATA[Veterans Walk of Honor Construction Logistics Map]]></title>          <body><![CDATA[<p>Map of construction logistics for Veterans Walk of Honor Georgia Tech campus.</p>]]></body>                      <image_name><![CDATA[Veterans_Walk_construction_logisticsjpg.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/08/31/Veterans_Walk_construction_logisticsjpg.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/08/31/Veterans_Walk_construction_logisticsjpg.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/08/31/Veterans_Walk_construction_logisticsjpg.jpg?itok=zP1aL2DC]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Map of construction logistics for Veterans Walk of Honor Georgia Tech campus.]]></image_alt>                    <created>1693500263</created>          <gmt_created>2023-08-31 16:44:23</gmt_created>          <changed>1693501110</changed>          <gmt_changed>2023-08-31 16:58:30</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="191135"><![CDATA[Veterans Walk of Honor]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="668779">  <title><![CDATA[Van Leer Chilled Water Connection Project August 7 - August 17]]></title>  <uid>35028</uid>  <body><![CDATA[<p>A chilled water connection construction project will impact pedestrian traffic near the Van Leer building August 7 - August 17. Please view the attached rerouting and logistics plan.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1691427370</created>  <gmt_created>2023-08-07 16:56:10</gmt_created>  <changed>1692034287</changed>  <gmt_changed>2023-08-14 17:31:27</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[A small section of concrete near the Van Leer building will be replaced during this project.]]></teaser>  <type>news</type>  <sentence><![CDATA[A small section of concrete near the Van Leer building will be replaced during this project.]]></sentence>  <summary><![CDATA[<p>Replacement of concrete adjacent to the Van Leer building will impact pedestrian traffic near the building.</p>]]></summary>  <dateline>2023-08-07T00:00:00-04:00</dateline>  <iso_dateline>2023-08-07T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-08-07 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mshelton35@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Mitchell Shelton</p><p>Construction Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>470-351-7746</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>671324</item>      </media>  <hg_media>          <item>          <nid>671324</nid>          <type>image</type>          <title><![CDATA[van_Leer_chilled_water_aug2023.PNG]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[van_Leer_chilled_water_aug2023.PNG]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/08/07/van_Leer_chilled_water_aug2023.PNG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/08/07/van_Leer_chilled_water_aug2023.PNG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/08/07/van_Leer_chilled_water_aug2023.PNG?itok=EfLxo29u]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[logistics map for pedestrian impact from construction project Van Leer building]]></image_alt>                    <created>1691427389</created>          <gmt_created>2023-08-07 16:56:29</gmt_created>          <changed>1691427389</changed>          <gmt_changed>2023-08-07 16:56:29</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192715"><![CDATA[Van Leer Building]]></keyword>          <keyword tid="192925"><![CDATA[Chilled Water project]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="668780">  <title><![CDATA[School of Architecture East Building Envelope Repair Project August - December 2023]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The School of Architecture is undergoing multiple improvement projects this semester. While the west building is re-roofed, the east building will receive improvements to its exterior envelope. The project timeline is August - December 2023. Please see the logistics maps for further information.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1691429339</created>  <gmt_created>2023-08-07 17:28:59</gmt_created>  <changed>1691429782</changed>  <gmt_changed>2023-08-07 17:36:22</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Repairs to the School of Architecture East Building envelope to occur August - December 2023.]]></teaser>  <type>news</type>  <sentence><![CDATA[Repairs to the School of Architecture East Building envelope to occur August - December 2023.]]></sentence>  <summary><![CDATA[<p>As the School of Architecture West building undergoes a re-reroofing project, the Architecture East building will receive improvements to the building's envelope. A phased project, the improvements will occur from August - December.</p>]]></summary>  <dateline>2023-08-07T00:00:00-04:00</dateline>  <iso_dateline>2023-08-07T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-08-07 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mshelton35@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Mitchell Shelton</p><p>Construction Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>470-351-7746</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>671325</item>          <item>671326</item>      </media>  <hg_media>          <item>          <nid>671325</nid>          <type>image</type>          <title><![CDATA[arch_bldg_ext_envelope_aug_2023.PNG]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[arch_bldg_ext_envelope_aug_2023.PNG]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/08/07/arch_bldg_ext_envelope_aug_2023.PNG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/08/07/arch_bldg_ext_envelope_aug_2023.PNG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/08/07/arch_bldg_ext_envelope_aug_2023.PNG?itok=fojGZOtx]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[logistics map for architecture east envelope improvements]]></image_alt>                    <created>1691429352</created>          <gmt_created>2023-08-07 17:29:12</gmt_created>          <changed>1691429352</changed>          <gmt_changed>2023-08-07 17:29:12</gmt_changed>      </item>          <item>          <nid>671326</nid>          <type>image</type>          <title><![CDATA[arch_bldg_ext_envelope_aug_2023_page2.PNG]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[arch_bldg_ext_envelope_aug_2023_page2.PNG]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/08/07/arch_bldg_ext_envelope_aug_2023_page2.PNG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/08/07/arch_bldg_ext_envelope_aug_2023_page2.PNG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/08/07/arch_bldg_ext_envelope_aug_2023_page2.PNG?itok=mJX_htvc]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[logistics map for improvements to building exterior envelope architecture building east]]></image_alt>                    <created>1691429590</created>          <gmt_created>2023-08-07 17:33:10</gmt_created>          <changed>1691429590</changed>          <gmt_changed>2023-08-07 17:33:10</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="167177"><![CDATA[School of Architecture]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="668707">  <title><![CDATA[Campus Improvements to Impact Pedestrian Paths Between MARC and MRDC July - November 2023]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The replacement of steam and condensate lines for the Manufacturing Research Center (MARC) and the Manufacturing Related Disciplines Complex (MRDC) will impact pedestrian pathways between the two buildings from August through mid-November 2023. The egress from the ground level of MRDC will have a fence in place allowing for safe entry to and exit from the building. The main pedestrian path south of MARC will be the path to and from the construction site. Please use caution when traveling this path. The attached aerial maps outline the impacted areas.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1691010775</created>  <gmt_created>2023-08-02 21:12:55</gmt_created>  <changed>1691011787</changed>  <gmt_changed>2023-08-02 21:29:47</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[To replace steam and condensate lines for the MARC and MRDC buildings, construction will affect pedestrian pathways.]]></teaser>  <type>news</type>  <sentence><![CDATA[To replace steam and condensate lines for the MARC and MRDC buildings, construction will affect pedestrian pathways.]]></sentence>  <summary><![CDATA[<p>The replacement of the steam and condensate lines for the MARC and the MRDC buildings will affect pedestrian pathways.</p>]]></summary>  <dateline>2023-08-02T00:00:00-04:00</dateline>  <iso_dateline>2023-08-02T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-08-02 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[brian.doles@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Brian Doles</p><p>Construction Project Manager</p><p>Planning, Design, and Construction</p><p>470-854-8262</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>671306</item>          <item>671307</item>      </media>  <hg_media>          <item>          <nid>671306</nid>          <type>image</type>          <title><![CDATA[Proposed Construction Fence Layout MARC MRDC steam condensate replacement_page 1png_Page_1.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Proposed Construction Fence Layout MARC MRDC steam condensate replacement_page 1png_Page_1.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/08/02/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%201png_Page_1.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/08/02/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%201png_Page_1.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/08/02/Proposed%2520Construction%2520Fence%2520Layout%2520MARC%2520MRDC%2520steam%2520condensate%2520replacement_page%25201png_Page_1.png?itok=xjK_JtWB]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Pedestrian pathways affected by construction near MARC and MRDC Georgia Tech campus]]></image_alt>                    <created>1691010858</created>          <gmt_created>2023-08-02 21:14:18</gmt_created>          <changed>1691010858</changed>          <gmt_changed>2023-08-02 21:14:18</gmt_changed>      </item>          <item>          <nid>671307</nid>          <type>image</type>          <title><![CDATA[Proposed Construction Fence Layout MARC MRDC steam condensate replacement_page 2png_Page_2.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Proposed Construction Fence Layout MARC MRDC steam condensate replacement_page 2png_Page_2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/08/02/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%202png_Page_2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/08/02/Proposed%20Construction%20Fence%20Layout%20MARC%20MRDC%20steam%20condensate%20replacement_page%202png_Page_2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/08/02/Proposed%2520Construction%2520Fence%2520Layout%2520MARC%2520MRDC%2520steam%2520condensate%2520replacement_page%25202png_Page_2.png?itok=zrcY3r_u]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Layout of impacted pedestrian pathways around MARC and MRDC on Georgia Tech campus]]></image_alt>                    <created>1691011027</created>          <gmt_created>2023-08-02 21:17:07</gmt_created>          <changed>1691011027</changed>          <gmt_changed>2023-08-02 21:17:07</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="66601"><![CDATA[Manufacturing Research Center (MARC)]]></keyword>          <keyword tid="13944"><![CDATA[manufacturing related disciplines complex]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="668597">  <title><![CDATA[Ninth Street and Hemphill Avenue Paving 7/24 - 7/27]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Paving the entrance to Ninth Street along Hemphill Avenue will take place July 24 - 27. Limited access to the adjacent areas will remain available via Center Street. Please see the diagram for more information.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1690321342</created>  <gmt_created>2023-07-25 21:42:22</gmt_created>  <changed>1690321922</changed>  <gmt_changed>2023-07-25 21:52:02</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Paving the entrance to Ninth Street along Hemphill Avenue will take place July 24 - 27.]]></teaser>  <type>news</type>  <sentence><![CDATA[Paving the entrance to Ninth Street along Hemphill Avenue will take place July 24 - 27.]]></sentence>  <summary><![CDATA[<p>Paving the entrance to Ninth Street along Hemphill Avenue will take place July 24 - 27. Limited access to the adjacent areas will remain available via Center Street. Please see the diagram for more information.</p>]]></summary>  <dateline>2023-07-25T00:00:00-04:00</dateline>  <iso_dateline>2023-07-25T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-07-25 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[blake.baklini@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Blake Baklini</p><p>Construction Project Manager</p><p>Planning, Design, and Construction</p><p>Infrastructure and Sustainability</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>671232</item>      </media>  <hg_media>          <item>          <nid>671232</nid>          <type>image</type>          <title><![CDATA[Ninth Street and Hemphill Asphalt Paving logistics map]]></title>          <body><![CDATA[<p>Map indicating location of paving.</p>]]></body>                      <image_name><![CDATA[hemphill_ninth_street_paving_0.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/07/25/hemphill_ninth_street_paving_0.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/07/25/hemphill_ninth_street_paving_0.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/07/25/hemphill_ninth_street_paving_0.png?itok=Qyh9p3Zb]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[image of map indicating where paving will occur]]></image_alt>                    <created>1690320981</created>          <gmt_created>2023-07-25 21:36:21</gmt_created>          <changed>1690321121</changed>          <gmt_changed>2023-07-25 21:38:41</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="192899"><![CDATA[Ninth Street]]></keyword>          <keyword tid="192900"><![CDATA[Hemphill Avenue]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="668441">  <title><![CDATA[School of Architecture Re-Roof Project Summer 2023]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The project work area encompasses the courtyard between Architecture east and west buildings</p><div>with a fenced area. (see photo). Cones and signage will be placed at all walking path locations that intersect this area well as signage posted on the building doors. Please avoid the area during construction.</div>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1689120216</created>  <gmt_created>2023-07-12 00:03:36</gmt_created>  <changed>1689120543</changed>  <gmt_changed>2023-07-12 00:09:03</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The Architecture West reroofing project is ongoing until mid-August.]]></teaser>  <type>news</type>  <sentence><![CDATA[The Architecture West reroofing project is ongoing until mid-August.]]></sentence>  <summary><![CDATA[<p>Re-roofing is underway for the School of Architecture (west building).</p>]]></summary>  <dateline>2023-07-11T00:00:00-04:00</dateline>  <iso_dateline>2023-07-11T00:00:00-04:00</iso_dateline>  <gmt_dateline>2023-07-11 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[blake.baklini@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Blake Baklini</p><p>Construction Project Manager</p><p>Planning, Design, and Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>671153</item>      </media>  <hg_media>          <item>          <nid>671153</nid>          <type>image</type>          <title><![CDATA[architecture_west_reroof_summer2023.png]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[architecture_west_reroof_summer2023.png]]></image_name>            <image_path><![CDATA[/sites/default/files/2023/07/11/architecture_west_reroof_summer2023_0.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/2023/07/11/architecture_west_reroof_summer2023_0.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/2023/07/11/architecture_west_reroof_summer2023_0.png?itok=_HkB54bm]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[image of construction work for the roof of the architecture west building georgia tech campus]]></image_alt>                    <created>1689120232</created>          <gmt_created>2023-07-12 00:03:52</gmt_created>          <changed>1689120232</changed>          <gmt_changed>2023-07-12 00:03:52</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="167177"><![CDATA[School of Architecture]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="665884">  <title><![CDATA[Utility Location project in effect February 16 - February 27]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Utility location effort will cause partial lane closures throughout campus from February 16 through February 27. The attached logistics plan outlines the schedule. Parking &amp;&nbsp;Transportation will reroute busses accordingly based on the day and closure and the contractor&nbsp;will handle all other traffic control. The proposed plan is as follows pending weather:</p><ul><li>Closure #1 &ndash; 2/16/23 &ndash; 1 day (10 Hours) starting 7am</li><li>Closure #2 &ndash; 2/17/23 &ndash; 1 day (10 Hours) starting 7am</li><li>Closure #3 &ndash; 2/18/23 &ndash; 1 day (10 Hours) starting 7am</li><li>Closure #4 &ndash; 2/20/23 &ndash; 1 day (10 Hours) starting 7am</li><li>Closure #5 (Curran) 2/21/23 &ndash; 1 day (10 Hours) starting 7am</li><li>Closure #5a (Turner) &ndash; 2/22&nbsp;- 2/23/23 &ndash; 2 days (10 Hours each) starting 7am</li><li>Closure #6 &ndash; 2/24/23 &ndash; 1 day (10 Hours) starting 7am</li><li>Closure #7 &ndash; 2/25/23 &ndash; 1 day (10 Hours) starting 7am</li><li>Closure #8 &ndash; 2/27/23 &ndash; 1 day (10 Hours) starting 7am</li></ul><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1676587610</created>  <gmt_created>2023-02-16 22:46:50</gmt_created>  <changed>1676588146</changed>  <gmt_changed>2023-02-16 22:55:46</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The location project will last 10 days.]]></teaser>  <type>news</type>  <sentence><![CDATA[The location project will last 10 days.]]></sentence>  <summary><![CDATA[<p>Utility location effort will cause partial lane closures throughout campus from February 16 through February 27.</p>]]></summary>  <dateline>2023-02-16T00:00:00-05:00</dateline>  <iso_dateline>2023-02-16T00:00:00-05:00</iso_dateline>  <gmt_dateline>2023-02-16 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cbwilliams@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Chris B. Williams</strong></p><p>Project Manager II</p><p>Planning Design &amp; Construction |&nbsp;Infrastructure &amp; Sustainability&nbsp;&nbsp;</p><p>Georgia&nbsp;Institute of&nbsp;Technology&nbsp;&nbsp;</p><p>(c)&nbsp;470.553.7197&nbsp;&nbsp;&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>665885</item>          <item>665886</item>      </media>  <hg_media>          <item>          <nid>665885</nid>          <type>image</type>          <title><![CDATA[Utility location effort logistics plan page 1]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Potholing-Lane-Closure-Logistics-Plan-021423_Page_1.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Potholing-Lane-Closure-Logistics-Plan-021423_Page_1.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Potholing-Lane-Closure-Logistics-Plan-021423_Page_1.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Potholing-Lane-Closure-Logistics-Plan-021423_Page_1.png?itok=SicHkrg5]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of logistics for utlity locating]]></image_alt>                    <created>1676588016</created>          <gmt_created>2023-02-16 22:53:36</gmt_created>          <changed>1677186369</changed>          <gmt_changed>2023-02-23 21:06:09</gmt_changed>      </item>          <item>          <nid>665886</nid>          <type>image</type>          <title><![CDATA[Utility location project logistics map page 2]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Potholing-Lane-Closure-Logistics-Plan-021423_Page_2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Potholing-Lane-Closure-Logistics-Plan-021423_Page_2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Potholing-Lane-Closure-Logistics-Plan-021423_Page_2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Potholing-Lane-Closure-Logistics-Plan-021423_Page_2.png?itok=fXwrVxhr]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Potholing lane closure]]></image_alt>                    <created>1676588110</created>          <gmt_created>2023-02-16 22:55:10</gmt_created>          <changed>1677186253</changed>          <gmt_changed>2023-02-23 21:04:13</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="665034">  <title><![CDATA[O'Keefe Gym Roof Replacement Project January 24 - April 30]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The O&rsquo;Keefe Gym Roof Replacement Project&nbsp;will begin on&nbsp;1/24 and run through the end of April. During the construction period please be aware of the following:</p><ul><li>A stair tower will be erected in the Northwest corner of the golf cart parking/charging area (highlighted in blue).&nbsp; 2-3 carts will have to be relocated to the South side of the parking/charging area.</li><li>Scaffolding will be erected on the East side of the Gym (highlighted in red).&nbsp; Pedestrian and cart travel in this area will be restricted during the construction period.</li><li>The contractor will erect a safety barricade at the Northwest corner of the Storeroom (highlighted in red).&nbsp; Access will be provided for daily deliveries to the Storeroom.&nbsp; A trash dumpster (highlighted in green) will be placed inside the fenced area.&nbsp; Several I&amp;S (formerly Facilities Management) reserved parking spaces within the barricade will need to be relocated during the construction period.</li></ul><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1674515142</created>  <gmt_created>2023-01-23 23:05:42</gmt_created>  <changed>1674515172</changed>  <gmt_changed>2023-01-23 23:06:12</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The O'Keefe gym will receive a new roof this semester.]]></teaser>  <type>news</type>  <sentence><![CDATA[The O'Keefe gym will receive a new roof this semester.]]></sentence>  <summary><![CDATA[<p>Work will begin on the new roof for the O&#39;Keefe gym in late January.</p>]]></summary>  <dateline>2023-01-23T00:00:00-05:00</dateline>  <iso_dateline>2023-01-23T00:00:00-05:00</iso_dateline>  <gmt_dateline>2023-01-23 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Mitchell.Shelton@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Mitchell Shelton</strong></p><p>Construction Project Manager</p><p><strong>Plann, Design, and Construction&nbsp;</strong></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>665033</item>      </media>  <hg_media>          <item>          <nid>665033</nid>          <type>image</type>          <title><![CDATA[O"Keefe Gym Roof Replacement ]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Logistics Plan with Dates_Okeefe_gym_png.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Logistics%20Plan%20with%20Dates_Okeefe_gym_png.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Logistics%20Plan%20with%20Dates_Okeefe_gym_png.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Logistics%2520Plan%2520with%2520Dates_Okeefe_gym_png.png?itok=0oYQ-Akg]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[pic of logistics for O"keefe gym roof replacement]]></image_alt>                    <created>1674514730</created>          <gmt_created>2023-01-23 22:58:50</gmt_created>          <changed>1674514730</changed>          <gmt_changed>2023-01-23 22:58:50</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="191969"><![CDATA[O&#039;Keefe gym roof]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="663743">  <title><![CDATA[East Campus Road Closure - 3rd Street and Williams Street - Begins Dec. 19]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Upcoming campus infrastructure improvements will result in traffic impacts to 3<sup>rd</sup>&nbsp;St. and Williams St. beginning&nbsp;<strong>Dec. 19</strong>.&nbsp;</p><p>The installation of a new electrical duct bank serving&nbsp;the Area 2 residence halls (Hopkins/Hanson/Perry/Matheson/Field)&nbsp;will begin Dec. 19&nbsp;and continue into the start of spring semester.&nbsp; The installation under the roadway of 3<sup>rd</sup>&nbsp;St. will require&nbsp;a&nbsp;<em>full closure</em>&nbsp;of 3<sup>rd</sup>&nbsp;St. (east of Techwood Dr.&nbsp;and Williams St.) up to where it intersects with the North Ave. off-ramp.&nbsp;The closure will occur daily from&nbsp;<strong>9:00 a.m. to 4:00 p.m</strong>.</p><p>The associated&nbsp;maps indicates the&nbsp;approximate path (red line) of the new electrical duct bank.&nbsp;Attached are&nbsp;detailed phasing images&nbsp;showing the area when:</p><p>a.&nbsp; &nbsp; &nbsp; The road is closed 9:00 a.m. to 4:00 p.m.</p><p>b.&nbsp; &nbsp; &nbsp; The road is open 4:01 p.m. to 8:59 a.m.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1670520345</created>  <gmt_created>2022-12-08 17:25:45</gmt_created>  <changed>1670521324</changed>  <gmt_changed>2022-12-08 17:42:04</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[ Upcoming construction work will result in road closure beginning Dec. 19. ]]></teaser>  <type>news</type>  <sentence><![CDATA[ Upcoming construction work will result in road closure beginning Dec. 19. ]]></sentence>  <summary><![CDATA[<p>A replacement of electrical infrastructure serving the Area 2 residence halls (Hopkins/Hanson/Perry/Matheson/Field) will&nbsp;begin Dec. 19&nbsp;and continue into the start of the spring semester. This infrastructure update will require a temporary road closure.</p>]]></summary>  <dateline>2022-12-08T00:00:00-05:00</dateline>  <iso_dateline>2022-12-08T00:00:00-05:00</iso_dateline>  <gmt_dateline>2022-12-08 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Brad.Morris@aux.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Brad Morris</p><p>Director, Capital Projects</p><p>Design &amp; Construction / Campus Services</p><p>678.618.2092</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>663742</item>          <item>663745</item>          <item>663746</item>      </media>  <hg_media>          <item>          <nid>663742</nid>          <type>image</type>          <title><![CDATA[East Campus Road Closure Dec. 19 (3rd St. and Williams St.)]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[electrical_duct_bank_dec22.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/electrical_duct_bank_dec22.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/electrical_duct_bank_dec22.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/electrical_duct_bank_dec22.png?itok=i9iEMcrK]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of logistics for road closure to install electrical duct bank 3rd St. and Williams St.]]></image_alt>                    <created>1670519340</created>          <gmt_created>2022-12-08 17:09:00</gmt_created>          <changed>1670519340</changed>          <gmt_changed>2022-12-08 17:09:00</gmt_changed>      </item>          <item>          <nid>663745</nid>          <type>image</type>          <title><![CDATA[3rd Street Road Closure - When Road is Closed 9am-4pm]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[3rd St Road Closure_page2_Page_1.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/3rd%20St%20Road%20Closure_page2_Page_1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/3rd%20St%20Road%20Closure_page2_Page_1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/3rd%2520St%2520Road%2520Closure_page2_Page_1.jpg?itok=IvIKDEy4]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[logistics map road closure]]></image_alt>                    <created>1670521061</created>          <gmt_created>2022-12-08 17:37:41</gmt_created>          <changed>1670521061</changed>          <gmt_changed>2022-12-08 17:37:41</gmt_changed>      </item>          <item>          <nid>663746</nid>          <type>image</type>          <title><![CDATA[3rd Street Road Closure - When Road is Open]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[3rd St Road Closure_page2_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/3rd%20St%20Road%20Closure_page2_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/3rd%20St%20Road%20Closure_page2_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/3rd%2520St%2520Road%2520Closure_page2_Page_2.jpg?itok=vmRGQkP0]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of logistics for road closure but when road is open after hours]]></image_alt>                    <created>1670521177</created>          <gmt_created>2022-12-08 17:39:37</gmt_created>          <changed>1670521177</changed>          <gmt_changed>2022-12-08 17:39:37</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="10969"><![CDATA[road closure]]></keyword>          <keyword tid="191724"><![CDATA[3rd St.]]></keyword>          <keyword tid="191723"><![CDATA[Williams Street]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="661177">  <title><![CDATA[Van Leer Chilled Water Project Underway]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Van Leer Chilled Water Project is underway. Please&nbsp;note the following details:</p><ol><li>Daily work hours are 6:00AM to 3:30PM.</li><li>Estimated completion date of Thursday, November 10th.</li><li>Construction activities include saw cutting / removal of asphalt and excavation work for installation of new chilled water piping.</li><li>Schedule is weather permitting and subject to change.</li><li>Sidewalk closure signage will be provided at both ends of the pedestrian walkway.&nbsp;Construction signage will be posted at regular intervals along the temporary fencing.</li></ol>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1663100678</created>  <gmt_created>2022-09-13 20:24:38</gmt_created>  <changed>1663101586</changed>  <gmt_changed>2022-09-13 20:39:46</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The Van Leer Chilled Water Project will be actively under construction until early November.]]></teaser>  <type>news</type>  <sentence><![CDATA[The Van Leer Chilled Water Project will be actively under construction until early November.]]></sentence>  <summary><![CDATA[<p>The Van Leer Chilled Water Project will be actively under construction until early November.</p>]]></summary>  <dateline>2022-09-13T00:00:00-04:00</dateline>  <iso_dateline>2022-09-13T00:00:00-04:00</iso_dateline>  <gmt_dateline>2022-09-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Mitchell.Shelton@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Mitchell Shelton</strong></p><p>Construction Project Manager</p><p><strong>Planning,&nbsp;</strong>Design and&nbsp;Construction</p><p>470-351-7746</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>661128</item>      </media>  <hg_media>          <item>          <nid>661128</nid>          <type>image</type>          <title><![CDATA[Van Leer Chilled Water Connection Logistics Plan]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Van Leer CHW Connection Logistics Plan_Page_2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Van%20Leer%20CHW%20Connection%20Logistics%20Plan_Page_2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Van%20Leer%20CHW%20Connection%20Logistics%20Plan_Page_2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Van%2520Leer%2520CHW%2520Connection%2520Logistics%2520Plan_Page_2.png?itok=SS6mKV7Y]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of  logitistics for  Van Leer chilled water connection]]></image_alt>                    <created>1663014090</created>          <gmt_created>2022-09-12 20:21:30</gmt_created>          <changed>1663014090</changed>          <gmt_changed>2022-09-12 20:21:30</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="187194"><![CDATA[chilled water]]></keyword>          <keyword tid="125081"><![CDATA[Van Leer]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="660385">  <title><![CDATA[What’s Happening in Campus Construction ]]></title>  <uid>27164</uid>  <body><![CDATA[<p>2022 has been a pivotal year for Infrastructure and Sustainability (I&amp;S), the unit behind many of the campus improvement projects under construction on the Georgia Tech campus. I&amp;S welcomed its first vice president, Maria Cimilluca, in January; integrated the Office of Capital Planning and Space Management into the department of Design and Construction; and appointed Gilbert Delgado as the assistant vice president for the newly created department of Planning, Design, and Construction. With this strengthened leadership and renewed vision, existing construction on campus forged ahead, new projects broke ground, and design work for future transformative projects continues.</p><p>&nbsp;</p><h5>COMPLETE OR SOON TO WRAP UP</h5><p><strong>Campus Center</strong><br />The John Lewis Student Center and Stamps Commons opened the week of August 1. As part of the <a href="https://studentcenter.gatech.edu/campus-center-project">Campus Center Project</a>, this final phase consisted of the renovation of the original part of the Student Center building, the addition of a brand new three-story building in place of the original Stamps Commons, and upgrades to the Kessler Campanile and its surrounding plaza.</p><p>The iconic Campanile and surrounding plaza are being reconfigured to improve the accessibility around the site. Its water feature will be updated to become more sustainable so that beloved campus traditions that occur in that space can safely continue. These improvements are on track for completion later this fall.</p><p><strong>10<sup>th</sup> Street Electrical Substation&nbsp;Improvements &ndash; Phase 2</strong><br />Improvements have increased the electrical resiliency of the plant by upgrading its four electrical substations to protect capacity required for campus cooling. This electrical substation powers the 10<sup>th</sup>&nbsp;Street chiller plant that provides chilled water to the campus and currently operates 24 hours a day, 365 days a year. Originally constructed in 1995, the plant has been expanded and currently houses seven chillers with a total capacity of more than 15,000 tons.</p><p><strong>828/830 West Peachtree Demolition</strong><br />The demolition of two buildings along West Peachtree is complete, and the space is currently being used for campus parking. During the fall semester, the space will house food trucks and serve as additional parking for gameday visitors.</p><p><strong>Howey Physics &ndash; Lecture Hall 5 Renovation</strong><br />Following the successful renovation of the four large lecture halls in the building, Lecture Hall 5 is now complete. Flexible seating was installed along with new windows to allow daylight into the revitalized space.</p><h5>IN PROGRESS</h5><p><strong>Ramblin&rsquo; Wreck Garage</strong><br />Constructed to house and display the Institute&rsquo;s mechanical mascot, the nearly all-glass structure with showroom-quality lighting and rooftop solar array will foster community spirit in the heart of campus. The garage houses a tool bench, vehicle turntable, and lift for students to maintain the Wreck. Located near the Campus Center and the Campanile Plaza, the garage will showcase the Ramblin&rsquo; Wreck and offer outdoor programmable space. The Wreck will also be in a direct line of sight from the Little Theatre in the Student Center, where prospective student tours depart, reinforcing the connection between the students and Georgia Tech&rsquo;s rich traditions.</p><p><strong>Gilbert Hillhouse Boggs Building Electrical Project</strong><br />This resiliency project will replace the existing network transformers, panels, and switchgear that support the electrical distribution systems throughout the facility that houses laboratories and offices spaces for the College of Sciences. The upgraded system will increase preparedness and the ability to respond to electrical disruptions. The expected completion date is May 2023.</p><p><strong>Coliseum Annex Renovation</strong><br />Adjacent to McCamish Pavilion, the Coliseum Annex will undergo renovations to its student-athlete Track and Field and Cross Country locker rooms, coaches&rsquo; locker rooms, the training room, and storage and support spaces. A lounge, nutrition space, and hydrotherapy space are also planned. The third-floor renovation will consist of two new smaller locker rooms for officials and visiting teams. Project completion is slated for year-end 2022.</p><p><strong>Access Control Upgrade</strong><br />In progress since 2015, the implementation of a single, campuswide physical access control service is planned for completion by the end of the year. The scope of work includes the replacement of existing access-control hardware systems for an estimated&nbsp; 4,000 entrances to academic buildings, research space, and athletic facilities.</p><p><strong>Community and Chefs Garden Expansion</strong><br />The Community Garden, located on the east side of the Instruction Center, will be upgraded to add accessible pathways and garden plots as well as increase the number of individual plots. The installation of cooking instruction tables and facilities will allow for chef demonstrations. More trees will be planted in the orchard area, and there will also be the installation of a new composting area, shed, and fencing. This project is scheduled to be complete in October.</p><p>&nbsp;</p><h5>JUST GETTING STARTED</h5><p><strong>Science Square</strong><br />Twenty acres of mostly undeveloped land just off North Avenue near Northside Drive will be <a href="https://news.gatech.edu/news/2022/08/18/georgia-tech-breaks-ground-science-square-announces-fund-connecting-local-community">transformed into a new research community</a>. Science Square will expand the biotech and life science research space and help revitalize and nurture new opportunities on Atlanta&#39;s west side. A 13-story tower will feature labs, clean rooms, and research space as well as retail space and affordable housing. A $500,000 grant will kickstart job training so people in this community will be able to learn, work, and research here. Science Square is slated to open in 2024.</p><p><strong>Aerospace Engineering Aircraft Hangar</strong><br />The Aircraft Hangar facility is proposed to be in the North Avenue Research Area (NARA) adjacent to the Techway building complex. This project will primarily focus on creating a facility to house small aircraft for the Daniel Guggenheim School of Aerospace Engineering research. The facility will be approximately 10,000 gross square feet and consist of two floors. Design planning is underway.</p><p><strong>D.M. Smith Building Renewal</strong><br />Renovations will include several upgrades to the building&rsquo;s infrastructure, including strengthening compliance with the Americans with Disabilities Act of 1990 by creating a permanent wheelchair access feature and adding an elevator. New mechanical, electrical, and plumbing systems will increase occupants&rsquo; health and comfort, as well as the building&rsquo;s energy efficiency. A virtual lab and hoteling spaces will be created for members of the School of Public Policy. The outer structure will remain largely intact, and all proposed changes will respect the historical character of the building. Renovations to the building are planned to begin in late 2023 and conclude in Spring 2025.</p><p><strong>Georgia Tech Veterans Walk of Honor</strong><br />Located outside the Veterans Resource Center, this tribute project will honor all Georgia Tech alumni, students, and staff who have answered the call to service in the United States armed forces. The walkway leading to the Veterans Resource Center will feature granite inlays and mounted wall plaques recognizing the six branches of the armed forces. Each inlay will include a portion of morse code representing the branch&rsquo;s slogan, encouraging discovery and reflection. Adjacent elevated signage will display the core values of military service: honor, courage, commitment, respect, duty, valor, service, and integrity. An upper plaza reflection area will feature an American flag and overlook Griffin Track and McCamish Pavilion, with the city skyline in the distance.</p><p>&nbsp;</p><h5>COMING SOON</h5><p><strong>Student Athlete Performance Center</strong><br />The 115,000-square-foot facility will be built in the footprint of the current Edge/Rice Center in the northeast corner of Bobby Dodd Stadium. The Center will house strength and conditioning, nutrition, sports medicine, ticket sales, and academic support. It will also include new expanded space for Georgia Tech football, featuring a dedicated football-only strength-and-conditioning area, players&rsquo; lounge, and meeting spaces. The student-athlete performance center will also include premium seating for Georgia Tech football games and other events held inside Bobby Dodd Stadium. The estimated completion date is early 2026.</p><p><strong>East Campus Streetscape</strong><br />Renovation of sidewalks and roadways will improve pedestrian and cycle access, safety, and connectivity to the east side of campus and Tech Square. Current&nbsp;sidewalks, curbing, and roadway paving will be improved. Designs are underway with phased construction planned for next summer and full completion projected for Fall 2024.</p><p><strong>Ferst Drive Realignment and Cycle Track</strong><br />Realignment of Ferst Drive at Regents Drive will allow the elimination of the traffic signal and enable connectivity to the planned bicycle infrastructure southwest of campus. A cycle track will be installed along Ferst Drive, providing improved safety and separation between cycles and buses at the bus stops. This project is also in the design phase, with construction planned for next summer.</p>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1661195031</created>  <gmt_created>2022-08-22 19:03:51</gmt_created>  <changed>1662042845</changed>  <gmt_changed>2022-09-01 14:34:05</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[2022 has been a pivotal year for the Georgia Tech campus as existing construction on campus forged ahead, new projects broke ground, and design work for future transformative projects continues.]]></teaser>  <type>news</type>  <sentence><![CDATA[2022 has been a pivotal year for the Georgia Tech campus as existing construction on campus forged ahead, new projects broke ground, and design work for future transformative projects continues.]]></sentence>  <summary><![CDATA[<p>2022 has been a pivotal year for the Georgia Tech campus as existing construction on campus forged ahead, new projects broke ground, and design work for future transformative projects continues.</p>]]></summary>  <dateline>2022-08-22T00:00:00-04:00</dateline>  <iso_dateline>2022-08-22T00:00:00-04:00</iso_dateline>  <gmt_dateline>2022-08-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>In addition to the larger and more visible projects featured here, there are more than 150 smaller projects in progress across campus. These include roof replacements, HVAC upgrades, and chilled water line connections. A great number of projects also take place inside campus buildings such as classroom and academic office renovations, lighting improvements, restroom upgrades, floor replacements and lab fit-ups.</p>]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:cathy.brim@gatech.edu">Cathy Brim</a><br />Institute Communications</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>660437</item>          <item>660436</item>          <item>660438</item>      </media>  <hg_media>          <item>          <nid>660437</nid>          <type>image</type>          <title><![CDATA[Rendering of Aerospace Hangar]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[ae_hangar.PNG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/ae_hangar.PNG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/ae_hangar.PNG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/ae_hangar.PNG?itok=-1ggW9E3]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[rendering of the exterior of the aerospace hangar]]></image_alt>                    <created>1661277542</created>          <gmt_created>2022-08-23 17:59:02</gmt_created>          <changed>1661279888</changed>          <gmt_changed>2022-08-23 18:38:08</gmt_changed>      </item>          <item>          <nid>660436</nid>          <type>image</type>          <title><![CDATA[Ramblin' Wreck Garage Interior Rendering ]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[ramblin_garage_interior_for_hg.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/ramblin_garage_interior_for_hg.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/ramblin_garage_interior_for_hg.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/ramblin_garage_interior_for_hg.png?itok=mPhym2eS]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[interior rendering for the ramblin' wreck garage]]></image_alt>                    <created>1661277410</created>          <gmt_created>2022-08-23 17:56:50</gmt_created>          <changed>1661279855</changed>          <gmt_changed>2022-08-23 18:37:35</gmt_changed>      </item>          <item>          <nid>660438</nid>          <type>image</type>          <title><![CDATA[Veterans Walk of Honor Plaza Overlook Rendering]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[veterans_walk_render.PNG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/veterans_walk_render.PNG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/veterans_walk_render.PNG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/veterans_walk_render.PNG?itok=f8-REd-j]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[rendering of the proposed design for the Veterans Walk of Honor Plaza Overlook]]></image_alt>                    <created>1661277670</created>          <gmt_created>2022-08-23 18:01:10</gmt_created>          <changed>1661279928</changed>          <gmt_changed>2022-08-23 18:38:48</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://facilities.gatech.edu/construction-notices]]></url>        <title><![CDATA[Campus Construction Notices]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="64319"><![CDATA[Administration and Finance]]></group>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="191123"><![CDATA[campus improvements]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="660277">  <title><![CDATA[Crane Staging Aug. 22 at Brittain Hall for Electrical Improvements]]></title>  <uid>35028</uid>  <body><![CDATA[<p>A crane will be staged on August 22 to improve electrical equipment for Brittain Dining Hall. The crane will be in the back parking lot that also serves Harrison and Howard residence halls. Several parking spaces will need to be used for the staging.</p><p>If you have any questions, reach out to Federico del Risco, Utilities Engineer II, Infrastructure and Sustainability 404-894-4749.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1660759776</created>  <gmt_created>2022-08-17 18:09:36</gmt_created>  <changed>1661194227</changed>  <gmt_changed>2022-08-22 18:50:27</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The crane will be staged in the parking lot behind the dining hall.]]></teaser>  <type>news</type>  <sentence><![CDATA[The crane will be staged in the parking lot behind the dining hall.]]></sentence>  <summary><![CDATA[<p>A crane will be staged in the parking lot behind Brittain Dining Hall for electril improvements August 22.</p>]]></summary>  <dateline>2022-08-17T00:00:00-04:00</dateline>  <iso_dateline>2022-08-17T00:00:00-04:00</iso_dateline>  <gmt_dateline>2022-08-17 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[federico.delrisco@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Federico del Risco</p><p>Utilities Engineer II</p><p>Infrastructure and Sustainability</p><p>404-894-4749</p><p>&nbsp;</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>660275</item>      </media>  <hg_media>          <item>          <nid>660275</nid>          <type>image</type>          <title><![CDATA[Brittain Dining Hall Crane Staging for RTU improvements]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[brittain_dining_rtujpg_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/brittain_dining_rtujpg_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/brittain_dining_rtujpg_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/brittain_dining_rtujpg_Page_2.jpg?itok=-PIB9CXE]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of crane staging]]></image_alt>                    <created>1660759354</created>          <gmt_created>2022-08-17 18:02:34</gmt_created>          <changed>1660759354</changed>          <gmt_changed>2022-08-17 18:02:34</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="85241"><![CDATA[brittain dining hall]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="659891">  <title><![CDATA[UPDATE: PROJECT POSTPONED TO ALLOW FOR GRAND OPENING OF CAMPUS CENTER ACTIVITIES. Fencing for Steam Line Replacement Near Campanile August 8 - Early October]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Monday, August 8<sup>th</sup>&nbsp;fencing will be mobilized adjacent to the Gilbane Campanile Construction Site to replace a trap condensate line that extends from Steam Manhole G11-1 to G9-15.&nbsp;The duration of this construction will extend through Friday, October 7<sup>th</sup>. This work is weather dependent and any changes to the schedule will be communicated as they become known.</p><p>This project is being coordinated with Gilbane as limited access to their site will be required for certain portions of the pipe replacement.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1659556499</created>  <gmt_created>2022-08-03 19:54:59</gmt_created>  <changed>1661139679</changed>  <gmt_changed>2022-08-22 03:41:19</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[PROJECT POSTPONED. Beginning Monday, August 8th fencing will be mobilized adjacent to the Gilbane Campanile Construction Site to replace a trap condensate line that extends from Steam Manhole G11-1 to G9-15.]]></teaser>  <type>news</type>  <sentence><![CDATA[PROJECT POSTPONED. Beginning Monday, August 8th fencing will be mobilized adjacent to the Gilbane Campanile Construction Site to replace a trap condensate line that extends from Steam Manhole G11-1 to G9-15.]]></sentence>  <summary><![CDATA[<p>UPDATE: PROJECT POSTPONED DUE TO PLANNED ACTIVITIES FOR GRAND OPENING OF THE CAMPUS CENTER. Beginning Monday, August 8<sup>th</sup>&nbsp;fencing will be mobilized adjacent to the Gilbane Campanile Construction Site to replace a trap condensate line that extends from Steam Manhole G11-1 to G9-15.</p>]]></summary>  <dateline>2022-08-03T00:00:00-04:00</dateline>  <iso_dateline>2022-08-03T00:00:00-04:00</iso_dateline>  <gmt_dateline>2022-08-03 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jennifer.disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jennifer Disotell</strong></p><p>&nbsp;Special Projects Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;</p><p>Infrastructure &amp; Sustainability, Design &amp; Construction</p><p>470-378-6894</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>659890</item>      </media>  <hg_media>          <item>          <nid>659890</nid>          <type>image</type>          <title><![CDATA[Fencing mobilized for Steam Trap Condensate Line Replacement August 8 Through Early October]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[steam_line_august22.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/steam_line_august22.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/steam_line_august22.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/steam_line_august22.png?itok=MboA_m_A]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of fencing for steam line replacement]]></image_alt>                    <created>1659556287</created>          <gmt_created>2022-08-03 19:51:27</gmt_created>          <changed>1659556287</changed>          <gmt_changed>2022-08-03 19:51:27</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="191013"><![CDATA[steam line replacement]]></keyword>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="659896">  <title><![CDATA[Temporary Cooling Installed to Support Weber SST3 Building Aug. 8-26]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Monday, August 8<sup>th</sup>&nbsp;we will be installing temporary cooling to support the Weber SST3 building.&nbsp;The installation of this temporary cooling equipment will take approximately 3 weeks and the project will take offline the alleyway and parking behind Weber and JS Coon&nbsp;from August 8<sup>th</sup>&nbsp;to August 26<sup>th</sup>.</p><p>We have coordinated this effort with the GTFSO, GT Parking &amp; Transportation and are in the process of working with the occupants of JS Coon to accommodate their two (2) reserved parking spaces for visitor parking.</p><p>The lot will resume normal parking after August 26<sup>th</sup>, but there will be temporary cooling equipment in the lot until a project slated for the February-March &rsquo;23 timeframe commences to move the building onto the CHW loop.&nbsp;Updates about this future project will be forthcoming.</p><p>Please address any questions or concerns directly to Jennifer Disotell&nbsp;via email or telephone number below.&nbsp;This is a weather-dependent operation and any changes to these dates will be communicated as soon as they become known.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1659557837</created>  <gmt_created>2022-08-03 20:17:17</gmt_created>  <changed>1659557837</changed>  <gmt_changed>2022-08-03 20:17:17</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Beginning Monday, August 8th we will be installing temporary cooling to support the Weber SST3 building.  The installation of this temporary cooling equipment will take approximately 3 weeks and the project will be taking the alleyway and parking behind W]]></teaser>  <type>news</type>  <sentence><![CDATA[Beginning Monday, August 8th we will be installing temporary cooling to support the Weber SST3 building.  The installation of this temporary cooling equipment will take approximately 3 weeks and the project will be taking the alleyway and parking behind W]]></sentence>  <summary><![CDATA[<p>Beginning Monday, August 8<sup>th</sup>&nbsp;we will be installing temporary cooling to support the Weber SST3 building.&nbsp; The installation of this temporary cooling equipment will take approximately 3 weeks and the project will be taking the alleyway and parking behind Weber and JS Coon offline from August 8<sup>th</sup>&nbsp;to August 26<sup>th</sup>.</p>]]></summary>  <dateline>2022-08-03T00:00:00-04:00</dateline>  <iso_dateline>2022-08-03T00:00:00-04:00</iso_dateline>  <gmt_dateline>2022-08-03 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jennifer.disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jennifer Disotell</strong></p><p>Special Projects Manager</p><p>Infrastructure &amp; Sustainability</p><p>Design &amp; Construction</p><p>470-378-6894</p><p><a href="http://www.facilities.gatech.edu/" rel="noopener noreferrer" target="_blank">www.facilities.gatech.edu</a></p><p><a href="mailto:jennifer.disotell@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">jennifer.disotell@facilities.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>659894</item>      </media>  <hg_media>          <item>          <nid>659894</nid>          <type>image</type>          <title><![CDATA[Map of cooling support plan for Weber SST3 Building]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[cooling_support_weber_22.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/cooling_support_weber_22.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/cooling_support_weber_22.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/cooling_support_weber_22.png?itok=zg8T7Pn8]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of planned temporary cooling at Weber SST3]]></image_alt>                    <created>1659557435</created>          <gmt_created>2022-08-03 20:10:35</gmt_created>          <changed>1659557435</changed>          <gmt_changed>2022-08-03 20:10:35</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="188945"><![CDATA[Weber Building]]></keyword>          <keyword tid="191014"><![CDATA[JS Coon Building]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="658321">  <title><![CDATA[Ferst Drive Traffic Impacted by Water Line Installation May 23 - June 6]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Installation of a new water line will impact traffic along Ferst Drive, between the U.A. Whitaker Building and the Cherry Emerson Building, beginning Monday, May 23 through Monday, June 6. To facilitate installation, one lane of vehicular traffic will be closed from 7:00 a.m. - 5:00 p.m. each day. Both lanes will be re-opened after 5:00 p.m. Flagmen will be onsite to direct traffic throughout the lane closures. Please refer to the attached traffic control plan.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1652901476</created>  <gmt_created>2022-05-18 19:17:56</gmt_created>  <changed>1652981802</changed>  <gmt_changed>2022-05-19 17:36:42</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Traffic will be impacted on Ferst Drive due to the installation of a new water line.]]></teaser>  <type>news</type>  <sentence><![CDATA[Traffic will be impacted on Ferst Drive due to the installation of a new water line.]]></sentence>  <summary><![CDATA[<p>Traffic will be impacted on Ferst Drive May 23 - June 6 due to a water line installation project.</p>]]></summary>  <dateline>2022-05-18T00:00:00-04:00</dateline>  <iso_dateline>2022-05-18T00:00:00-04:00</iso_dateline>  <gmt_dateline>2022-05-18 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[fenella.bryant@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Fenella Bryant<br />Construction Project Manager</p><p>Planning, Design &amp; Construction<br />Infrastructure and Sustainability</p><p>fenella.bryant@facilities.gatech.edu</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>658309</item>          <item>658311</item>      </media>  <hg_media>          <item>          <nid>658309</nid>          <type>image</type>          <title><![CDATA[Traffic (WestBound) Plan for Cherry Emerson / Ferst Drive water main installation]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GT Cherry Emerson Traffic Control Plan_Page_1.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GT%2520Cherry%2520Emerson%2520Traffic%2520Control%2520Plan_Page_1.jpg?itok=44xiefFJ]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1652899035</created>          <gmt_created>2022-05-18 18:37:15</gmt_created>          <changed>1652899035</changed>          <gmt_changed>2022-05-18 18:37:15</gmt_changed>      </item>          <item>          <nid>658311</nid>          <type>image</type>          <title><![CDATA[Traffic (EastBound) Plan for Cherry Emerson / Ferst Drive water main installation]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GT Cherry Emerson Traffic Control Plan_Page_2.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_2.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GT%20Cherry%20Emerson%20Traffic%20Control%20Plan_Page_2.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GT%2520Cherry%2520Emerson%2520Traffic%2520Control%2520Plan_Page_2.jpg?itok=1SPeubzG]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[pic of traffic plan for water line installation ferst drive and cherry emerson]]></image_alt>                    <created>1652899185</created>          <gmt_created>2022-05-18 18:39:45</gmt_created>          <changed>1652899185</changed>          <gmt_changed>2022-05-18 18:39:45</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="190639"><![CDATA[water line]]></keyword>          <keyword tid="176685"><![CDATA[Ferst Drive]]></keyword>          <keyword tid="6942"><![CDATA[Cherry Emerson]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="658017">  <title><![CDATA[Rerouting of Communication Lines Affects W02 Parking]]></title>  <uid>27164</uid>  <body><![CDATA[<p>Beginning Wednesday, May 11, contractors will be onsite outside the <a href="https://map.gatech.edu/?id=82#!m/11111">Smithgall Student Services Building</a> and<a href="https://map.gatech.edu/?id=82#!m/11394"> W02 Student Center Parking Deck</a> to reroute communication lines. Work will begin at 6 a.m. on Wednesday and is expected to be completed at 6 p.m. on Thursday, May 12.</p><p>During this time, the entrance and exit gates, as well as visitor pay stations, at the W02 Student Center Parking Deck will not be operational. Annual W02 permit holders, including those with SmartPark and Flex permits, will continue to park as normal. Visitors will need to pay for parking upon arrival to the garage using ParkMobile Zone 8631. During this time, the Charge Point electric vehicle chargers in the W02 lot will also not be operational.</p><p>Currently, contractors are not anticipating disruption to cell phone coverage. More information will be provided if the situation changes.</p>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1651862164</created>  <gmt_created>2022-05-06 18:36:04</gmt_created>  <changed>1651862309</changed>  <gmt_changed>2022-05-06 18:38:29</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Beginning Wednesday, May 11, contractors will be onsite outside the Smithgall Student Services Building and W02 Student Center Parking Deck to reroute communication lines.]]></teaser>  <type>news</type>  <sentence><![CDATA[Beginning Wednesday, May 11, contractors will be onsite outside the Smithgall Student Services Building and W02 Student Center Parking Deck to reroute communication lines.]]></sentence>  <summary><![CDATA[<p>Beginning Wednesday, May 11, contractors will be onsite outside the Smithgall Student Services Building and W02 Student Center Parking Deck to reroute communication lines</p>]]></summary>  <dateline>2022-05-06T00:00:00-04:00</dateline>  <iso_dateline>2022-05-06T00:00:00-04:00</iso_dateline>  <gmt_dateline>2022-05-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:nicolas.palfrey@facilities.gatech.edu"><strong>Nic Palfrey</strong></a><br />Senior Project Manager<br />Infrastructure and Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="499601"><![CDATA[Campus Services]]></group>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>          <group id="503491"><![CDATA[Parking and Transportation Services]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="657971">  <title><![CDATA[Steam Line Replacement Project Impacts Pedestrian Walkways Beginning May 9.]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning Monday, May 9, a steam line replacement project will begin on campus. Fencing will be mobilized to enclose a large section of sidewalk between the Boggs Building, Love Manufacturing Building, the Instructional Center Lawn, and the Manufacturing Related Disciplines Complex.&nbsp;The accompanying plan shows the fence line, sidewalk closures, and alternate paths of travel for pedestrians during construction.</p><p>Pending weather, the project is expected to be complete in early August. Any delays to the completion date will be reported to the community as needed.</p><p>For more information, please contact Jennifer Disotell&nbsp;at 470.378.6894 or email at&nbsp;<a href="mailto:jdisotell3@gatech.edu" rel="noopener noreferrer" target="_blank">jdisotell3@gatech.edu</a>.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1651693808</created>  <gmt_created>2022-05-04 19:50:08</gmt_created>  <changed>1651859190</changed>  <gmt_changed>2022-05-06 17:46:30</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Pedestrian walkways will be impacted between the Boggs Building, Love Manufacturing Building, the IC Lawn, and the Manufacturing Related Disciplines Complex beginning May 9 for a steam replacement project.]]></teaser>  <type>news</type>  <sentence><![CDATA[Pedestrian walkways will be impacted between the Boggs Building, Love Manufacturing Building, the IC Lawn, and the Manufacturing Related Disciplines Complex beginning May 9 for a steam replacement project.]]></sentence>  <summary><![CDATA[<p>Pedestrian walkways will be impacted between the Boggs Building, Love Manufacturing Building, the IC Lawn, and the Manufacturing Related Disciplines Complex beginning May 9 for a steam replacement project.&nbsp;</p>]]></summary>  <dateline>2022-05-04T00:00:00-04:00</dateline>  <iso_dateline>2022-05-04T00:00:00-04:00</iso_dateline>  <gmt_dateline>2022-05-04 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jennifer.disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:jdisotell3@gatech.edu"><strong>Jennifer Disotell</strong></a><br />Special Projects Manager<br />Infrastructure &amp; Sustainability</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>657972</item>      </media>  <hg_media>          <item>          <nid>657972</nid>          <type>image</type>          <title><![CDATA[Steam Line Replacement Project Fence Mobilization Plan]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[steam_replacement_v3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/steam_replacement_v3.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/steam_replacement_v3.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/steam_replacement_v3.png?itok=eTOkcJL1]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of fencing plan for steam replacement project]]></image_alt>                    <created>1651694358</created>          <gmt_created>2022-05-04 19:59:18</gmt_created>          <changed>1651697790</changed>          <gmt_changed>2022-05-04 20:56:30</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="190539"><![CDATA[steam replacement project]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="657936">  <title><![CDATA[East Campus Housing Summer Renovations to begin May 9]]></title>  <uid>35028</uid>  <body><![CDATA[<p>East campus housing will undergo multiple renovation projects from May 9 through July 31. Pedestrian and vehicular traffic impacts are indicated on the attached map.&nbsp;</p><p>The work includes interior renovations at Brown, Cloudman, Harris, Harrison, Howell, and Smith, and exterior utility and landscape work in the vicinity of both Cloudman and Smith, respectively.&nbsp; Additionally, there may be some very short-term lane closures of the northbound lane of Techwood, to be scheduled at a later date.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1651622327</created>  <gmt_created>2022-05-03 23:58:47</gmt_created>  <changed>1651692732</changed>  <gmt_changed>2022-05-04 19:32:12</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[East campus housing will undergo multiple renovation projects from May 9 through July 31]]></teaser>  <type>news</type>  <sentence><![CDATA[East campus housing will undergo multiple renovation projects from May 9 through July 31]]></sentence>  <summary><![CDATA[<p>The renovation of East Campus housing will begin May 9.&nbsp;</p>]]></summary>  <dateline>2022-05-03T00:00:00-04:00</dateline>  <iso_dateline>2022-05-03T00:00:00-04:00</iso_dateline>  <gmt_dateline>2022-05-03 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[brad.morris@aux.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Brad Morris</strong></p><p>Director, Capital Projects</p><p>(678) 618-2092</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>657935</item>      </media>  <hg_media>          <item>          <nid>657935</nid>          <type>image</type>          <title><![CDATA[East Housing  Summer Construction Map]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[East Housing_Summer 2022_.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/East%20Housing_Summer%202022_.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/East%20Housing_Summer%202022_.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/East%2520Housing_Summer%25202022_.jpg?itok=fJGB9CJb]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of planned pedestrian impacts due to renovations at East Campus Housing]]></image_alt>                    <created>1651621727</created>          <gmt_created>2022-05-03 23:48:47</gmt_created>          <changed>1651621727</changed>          <gmt_changed>2022-05-03 23:48:47</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="190528"><![CDATA[campus renovations]]></keyword>          <keyword tid="190529"><![CDATA[east campus housing]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="656075">  <title><![CDATA[Techwood Drive and Hemphill Avenue Road Closures March 10 - 12]]></title>  <uid>27164</uid>  <body><![CDATA[<p>To finalize campus water main installation projects, the City of Atlanta will shut down Techwood Drive between North Avenue and Bobby Dodd Way between 9 a.m. and 4 p.m. on Thursday, March 10, and Friday, March 11, to repave the roadway and apply temporary striping.</p><p>Additionally, the City of Atlanta will mill and pave Hemphill Avenue between Ninth&nbsp;Street and Ferst Drive&nbsp;between 9 a.m. and 4 p.m.&nbsp;on Friday, March 11 and Saturday, March 12. Both lanes of Hemphill Avenue will be closed to through traffic.</p><p>Police, flaggers, and signage will be on site to direct traffic at both locations. Thank you for your patience during the&nbsp;final stages of this campus infrastructure improvement.</p>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1646664666</created>  <gmt_created>2022-03-07 14:51:06</gmt_created>  <changed>1646930273</changed>  <gmt_changed>2022-03-10 16:37:53</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The City of Atlanta will shut down Techwood Drive between North Avenue and Bobby Dodd Way between 9 a.m. and 4 p.m. on Thursday, March 10, and Friday, March 11, to repave the roadway and apply temporary striping. ]]></teaser>  <type>news</type>  <sentence><![CDATA[The City of Atlanta will shut down Techwood Drive between North Avenue and Bobby Dodd Way between 9 a.m. and 4 p.m. on Thursday, March 10, and Friday, March 11, to repave the roadway and apply temporary striping. ]]></sentence>  <summary><![CDATA[]]></summary>  <dateline>2022-03-07T00:00:00-05:00</dateline>  <iso_dateline>2022-03-07T00:00:00-05:00</iso_dateline>  <gmt_dateline>2022-03-07 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>656149</item>      </media>  <hg_media>          <item>          <nid>656149</nid>          <type>image</type>          <title><![CDATA[City of Atlanta Paving Activities on Campus]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[City of ATL Paving Activities March 9-11, 2022.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/City%20of%20ATL%20Paving%20Activities%20March%209-11%2C%202022.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/City%20of%20ATL%20Paving%20Activities%20March%209-11%2C%202022.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/City%2520of%2520ATL%2520Paving%2520Activities%2520March%25209-11%252C%25202022.jpg?itok=KsH1N3il]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1646839709</created>          <gmt_created>2022-03-09 15:28:29</gmt_created>          <changed>1646839709</changed>          <gmt_changed>2022-03-09 15:28:29</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://facilities.gatech.edu/construction-notices]]></url>        <title><![CDATA[Campus Construction Notices]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>          <group id="64319"><![CDATA[Administration and Finance]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="190118"><![CDATA[road closures]]></keyword>          <keyword tid="1400"><![CDATA[Construction]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="655328">  <title><![CDATA[Weber Building Fire Protection Project Planned for Feb. 14 - Mar. 11, Affects Pedestrian Routes]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Weber Fire Protection</p><p><strong>What:&nbsp;</strong>The contractor will connect an existing water main from a valve near the bus stop next to the transit hub to the meter vault in the landscape area on the west side of Weber (see attached aerial view).</p><p><strong>Construction Start Date:</strong>&nbsp;Monday, February 14<sup>th</sup>, 2022</p><p><strong>Scheduled Construction Completion Date:&nbsp;</strong>Friday, March 11<sup>th</sup>, 2022</p><p><strong>Impact:</strong></p><ul><li>See attached map for pedestrian routing plan. A temporary fence will be erected around the perimeter of the construction zone (shown in red). All doors to and from the building will remain open. Crosswalks in Ferst Drive will remain open.</li><li>The westbound dedicated bike lane will remain open.</li></ul><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp;</strong></p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1644358628</created>  <gmt_created>2022-02-08 22:17:08</gmt_created>  <changed>1644358682</changed>  <gmt_changed>2022-02-08 22:18:02</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The fire suppression system infrastructure project will occur mid-February through mid-March and will impact pedestrian walkway.]]></teaser>  <type>news</type>  <sentence><![CDATA[The fire suppression system infrastructure project will occur mid-February through mid-March and will impact pedestrian walkway.]]></sentence>  <summary><![CDATA[]]></summary>  <dateline>2022-02-08T00:00:00-05:00</dateline>  <iso_dateline>2022-02-08T00:00:00-05:00</iso_dateline>  <gmt_dateline>2022-02-08 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Sitework for an infrastructure project for The Weber Building impacts pedestrian walkways mid-February through mid-March.</p>]]></sidebar>  <email><![CDATA[mark.wood@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Mark Wood</strong></p><p>Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;</p><p>Infrastructure &amp; Sustainability</p><p>Design &amp; Construction</p><p>&nbsp;</p><p>C: 404-630-6486</p><p>151 6th Street NW, Atlanta, GA 30332-0351&nbsp;<a href="http://facilities.gatech.edu/sites/default/files/documents/FacilitiesOKeefeLocationMap.pdf" rel="noopener noreferrer" target="_blank">MAP</a></p><p><a href="http://www.facilities.gatech.edu/" rel="noopener noreferrer" target="_blank">www.facilities.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>651170</item>      </media>  <hg_media>          <item>          <nid>651170</nid>          <type>image</type>          <title><![CDATA[Weber New Fire Suppression System]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Weber_water_line_ferst_oct2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Weber_water_line_ferst_oct2021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Weber_water_line_ferst_oct2021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Weber_water_line_ferst_oct2021.png?itok=xYu0XBFp]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of campus impacts due to new fire suppression system installation in Weber]]></image_alt>                    <created>1632848751</created>          <gmt_created>2021-09-28 17:05:51</gmt_created>          <changed>1632848751</changed>          <gmt_changed>2021-09-28 17:05:51</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="189928"><![CDATA[construction impacts]]></keyword>          <keyword tid="188951"><![CDATA[The Weber Building]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="653783">  <title><![CDATA[Construction Activity Between Student Center and Smithgall Continues Into Spring]]></title>  <uid>28046</uid>  <body><![CDATA[<p>The alternate pathway in place around the Smithgall Student Services building will remain in place as construction work between the Smithgall and the Student Center site stretches into the new semester.&nbsp;The necessary work, once hoped to last only a few weeks, has proved more complex and will require more time to complete and restore the pathway.&nbsp;</p><p>During this time, the campus community will not be able to pass between the buildings as&nbsp;utility work is completed and the&nbsp;existing sidewalk between the buildings is replaced. Additionally, the east door of Smithgall will be closed until work concludes. Access to both Smithgall and the Ferst Center for the Arts will be maintained.&nbsp;No other impacts are anticipated.</p><p>While this delay does not change the overall completion deadline for the project, the diversion of the pathway is expected to last for several weeks. Updates will be shared with community as work progresses.&nbsp;For updates and other news about the Campus Center project, visit&nbsp;<a href="http://c.gatech.edu/CampusCenter">c.gatech.edu/CampusCenter</a>.&nbsp;</p>]]></body>  <author>Kate Curnow</author>  <status>1</status>  <created>1639688587</created>  <gmt_created>2021-12-16 21:03:07</gmt_created>  <changed>1642718176</changed>  <gmt_changed>2022-01-20 22:36:16</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The alternate pathway in place around the Smithgall Student Services building will remain in place as construction continues.]]></teaser>  <type>news</type>  <sentence><![CDATA[The alternate pathway in place around the Smithgall Student Services building will remain in place as construction continues.]]></sentence>  <summary><![CDATA[<p>The alternate pathway in place around the Smithgall Student Services building will remain in place as construction work between the Smithgall and the Student Center site stretches into the new semester.&nbsp;</p>]]></summary>  <dateline>2022-01-10T00:00:00-05:00</dateline>  <iso_dateline>2022-01-10T00:00:00-05:00</iso_dateline>  <gmt_dateline>2022-01-10 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[The community should continue to use alternate path around west side of Smithgall Student Services Building.]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Nic Palfrey</p><p>nicolas.palfrey@facilities.gatech.edu</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>653785</item>      </media>  <hg_media>          <item>          <nid>653785</nid>          <type>image</type>          <title><![CDATA[Campus Center Project Dec 21 Diagram]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Phase 2 West Wenn Hardscape Logistics Plan (2) copy.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Phase%202%20West%20Wenn%20Hardscape%20Logistics%20Plan%20%282%29%20copy.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Phase%202%20West%20Wenn%20Hardscape%20Logistics%20Plan%20%282%29%20copy.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Phase%25202%2520West%2520Wenn%2520Hardscape%2520Logistics%2520Plan%2520%25282%2529%2520copy.jpg?itok=hLwUqgdD]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Diagram of Construction Work for 12/20/21-1/7/22]]></image_alt>                    <created>1639688728</created>          <gmt_created>2021-12-16 21:05:28</gmt_created>          <changed>1639688728</changed>          <gmt_changed>2021-12-16 21:05:28</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="1294"><![CDATA[Auxiliary Services]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="166965"><![CDATA[Student Center]]></keyword>          <keyword tid="184590"><![CDATA[Campus Center Project]]></keyword>          <keyword tid="1400"><![CDATA[Construction]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="182906"><![CDATA[Facilities-Notices; Campus Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="654424">  <title><![CDATA[EcoCommons Path Extension Improvements Begin]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The gravel drive between State Street and Atlantic Drive (south of the North Campus Parking Deck) will be closed during construction and will be upgraded to a multi-use path consisting of concrete and asphalt to match the EcoCommons path on the west of State Street.</p><ul><li>North Campus Parking Deck vehicular and pedestrian circulation will not be affected.</li><li>Pedestrian access between Atlantic Drive and State Street will be via Peachtree Place (north&nbsp;side of parking deck).</li><li>Landscape Services and Recycling vehicles will access their facilities via Atlantic Drive.</li><li>Duration of project is three months.</li></ul><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1642098656</created>  <gmt_created>2022-01-13 18:30:56</gmt_created>  <changed>1642098778</changed>  <gmt_changed>2022-01-13 18:32:58</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Improvements to the gravel drive located between State Street and Atlantic Drive will occur January - April.]]></teaser>  <type>news</type>  <sentence><![CDATA[Improvements to the gravel drive located between State Street and Atlantic Drive will occur January - April.]]></sentence>  <summary><![CDATA[]]></summary>  <dateline>2022-01-13T00:00:00-05:00</dateline>  <iso_dateline>2022-01-13T00:00:00-05:00</iso_dateline>  <gmt_dateline>2022-01-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p>Design &amp; Construction</p><p>Infrastructure and Sustainability</p><p>404-565-3449</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>654423</item>      </media>  <hg_media>          <item>          <nid>654423</nid>          <type>image</type>          <title><![CDATA[EcoCommons Path Extension January 2022]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[EcoCommons Path Extension Pedestrian Circulation During Constructionrev  (2).jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/EcoCommons%20Path%20Extension%20Pedestrian%20Circulation%20During%20Constructionrev%20%20%282%29.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/EcoCommons%20Path%20Extension%20Pedestrian%20Circulation%20During%20Constructionrev%20%20%282%29.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/EcoCommons%2520Path%2520Extension%2520Pedestrian%2520Circulation%2520During%2520Constructionrev%2520%2520%25282%2529.jpg?itok=d-ESbRJv]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[pic of site plant for ecocommons path extension]]></image_alt>                    <created>1642098037</created>          <gmt_created>2022-01-13 18:20:37</gmt_created>          <changed>1643148287</changed>          <gmt_changed>2022-01-25 22:04:47</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="189704"><![CDATA[pathway construction]]></keyword>          <keyword tid="182634"><![CDATA[State Street]]></keyword>          <keyword tid="106251"><![CDATA[atlantic drive]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="653790">  <title><![CDATA[Campus Center Renovations Continue December 2021 through January 2022]]></title>  <uid>35028</uid>  <body><![CDATA[<p>While the fence line has been static for some time, this notice documents a brief change to execute hardscape work from Ferst Plaza down to the parking lot.&nbsp; The work has been scheduled to avoid events in the Ferst Theater and at a time when campus is fairly quiet to minimize the disruption.<strong>&nbsp;</strong></p><p><strong>General:</strong></p><p>*Student Center Lot 2 and Student Center parking deck remain open for public use.</p><p>*Normal working hours are Monday - Saturday 6:00 AM &ndash; 6:00 PM.</p><p><strong>Phase II Student Center Construction - Hardscape:</strong></p><p>*Construction fencing and wayfinding signage will be installed.</p><p>*Removal and replacement of existing sidewalks between the Student Services and Student Center building will be performed.</p><p>*Vehicular routes will not be impacted.</p><p>*An alternate pedestrian pathway will be provided and signed.</p><p>*Access to both the Student Services building and Ferst Center of Arts will be maintained.</p><p>*The East door at Student Services will be temporarily closed due to construction.&nbsp; All occupants to utilize other doors for entry and exit.</p><p>&nbsp;</p><p>&nbsp;</p><p><br />&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1639691233</created>  <gmt_created>2021-12-16 21:47:13</gmt_created>  <changed>1639691280</changed>  <gmt_changed>2021-12-16 21:48:00</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The campus center renovation moves forward during December and January.]]></teaser>  <type>news</type>  <sentence><![CDATA[The campus center renovation moves forward during December and January.]]></sentence>  <summary><![CDATA[<p>The Campus Center renovation details for December 20 through January 2022.</p>]]></summary>  <dateline>2021-12-16T00:00:00-05:00</dateline>  <iso_dateline>2021-12-16T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-12-16 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p>Infrastructure and Sustainability</p><p>Design &amp; Construction</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p><p>&nbsp;</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>653787</item>      </media>  <hg_media>          <item>          <nid>653787</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Activity December 2021 - January 2022]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Phase 2 West Wenn Hardscape Logistics Plan (1).png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Phase%202%20West%20Wenn%20Hardscape%20Logistics%20Plan%20%281%29.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Phase%202%20West%20Wenn%20Hardscape%20Logistics%20Plan%20%281%29.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Phase%25202%2520West%2520Wenn%2520Hardscape%2520Logistics%2520Plan%2520%25281%2529.png?itok=5sbsZ26y]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of logistics plan for campus center renovation dec. 2021 - jan. 2022]]></image_alt>                    <created>1639690798</created>          <gmt_created>2021-12-16 21:39:58</gmt_created>          <changed>1639690798</changed>          <gmt_changed>2021-12-16 21:39:58</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://studentcenter.gatech.edu/campus-center-project]]></url>        <title><![CDATA[Campus Center ]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="653675">  <title><![CDATA[City of Atlanta Water Main Installation Impacts Techwood Drive December 20 - 23]]></title>  <uid>35028</uid>  <body><![CDATA[<p>December&nbsp;20 through Dec. 23, the City of Atlanta will complete the service connections to finalize&nbsp;the 12-inch&nbsp;water main installation that occurred in October along&nbsp;Techwood&nbsp;Drive between North Avenue and 3rd&nbsp;Street/Bobby Dodd Way (adjacent to&nbsp;Bobby Dodd Stadium).&nbsp;</p><p>The City of Atlanta&nbsp;will also mobilize the week of&nbsp;<strong>January 3&nbsp;for 2-3 weeks</strong>&nbsp;to complete the final connection of the new main and disconnection of the old.</p><p>During the&nbsp;work described above, the northbound lane will be closed during normal business hours&nbsp;(approximately 9&nbsp;a.m. -&nbsp;4&nbsp;p.m.)&nbsp;Monday through Friday.&nbsp;The southbound lane will be used to maintain&nbsp;two-way traffic, with traffic controllers, during working hours. Both lanes&nbsp;of&nbsp;Techwood&nbsp;Drive&nbsp;will be open each night.&nbsp;&nbsp;</p><p>The access drives to&nbsp;Brittain&nbsp;Dining Hall&nbsp;and&nbsp;those&nbsp;in between Cloudman and Glenn&nbsp;Residence Halls&nbsp;will&nbsp;remain open. On-street parking in ER51 along&nbsp;Techwood&nbsp;Drive&nbsp;may be limited.&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1639449930</created>  <gmt_created>2021-12-14 02:45:30</gmt_created>  <changed>1639690486</changed>  <gmt_changed>2021-12-16 21:34:46</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[City of Atlanta Water Main Installation on Techwood Drive enters its final phase Dec. 20.]]></teaser>  <type>news</type>  <sentence><![CDATA[City of Atlanta Water Main Installation on Techwood Drive enters its final phase Dec. 20.]]></sentence>  <summary><![CDATA[<p>December&nbsp;20 through Dec. 23, the City of Atlanta will complete the service connections to finalize&nbsp;the installation of a&nbsp;12-inch&nbsp;water main&nbsp;along&nbsp;Techwood&nbsp;Drive between North Avenue and 3rd&nbsp;Street/Bobby Dodd Way (adjacent to&nbsp;Bobby Dodd Stadium).&nbsp;</p>]]></summary>  <dateline>2021-12-13T00:00:00-05:00</dateline>  <iso_dateline>2021-12-13T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-12-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mark.wood@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:mark.wood@facilities.gatech.edu">Mark Wood</a><br />Project Manager<br />Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>647960</item>      </media>  <hg_media>          <item>          <nid>647960</nid>          <type>image</type>          <title><![CDATA[Techwood Drive City of Atlanta Water Main installation June 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Techwood Drive Campus Notification June 2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Techwood%20Drive%20Campus%20Notification%20June%202021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Techwood%20Drive%20Campus%20Notification%20June%202021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Techwood%2520Drive%2520Campus%2520Notification%2520June%25202021.png?itok=JdtssVJ2]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1623091041</created>          <gmt_created>2021-06-07 18:37:21</gmt_created>          <changed>1623091041</changed>          <gmt_changed>2021-06-07 18:37:21</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="188001"><![CDATA[Techwood Drive]]></keyword>          <keyword tid="188002"><![CDATA[Water Main installation]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="653684">  <title><![CDATA[McMillan Street Closure December 20]]></title>  <uid>35028</uid>  <body><![CDATA[<p>This notification is to advise of a&nbsp;<strong>road closure</strong>&nbsp;at&nbsp;<strong>McMillan St, NW and Turner Place, NW</strong>&nbsp;in the West Campus Sector on&nbsp;<strong>Monday, December 20<sup>th</sup>&nbsp;from 7 a.m. to noon</strong>.&nbsp; To change out a&nbsp;transformer,&nbsp;&nbsp;a crane will&nbsp;be set up at&nbsp;the intersection&nbsp;so no thru-traffic will be possible.&nbsp;Cones and signage will be placed at Ferst Drive onto 6<sup>th</sup>&nbsp;Street.&nbsp;</p><p>There will be some re-routing of pedestrian foot traffic to keep the public from entering the Work Zone of the Crane.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1639499999</created>  <gmt_created>2021-12-14 16:39:59</gmt_created>  <changed>1639499999</changed>  <gmt_changed>2021-12-14 16:39:59</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[A road closure will occur at McMillan St, NW and Turner Place, NW in the West Campus Sector on Monday, December 20th from 7 a.m. to noon.]]></teaser>  <type>news</type>  <sentence><![CDATA[A road closure will occur at McMillan St, NW and Turner Place, NW in the West Campus Sector on Monday, December 20th from 7 a.m. to noon.]]></sentence>  <summary><![CDATA[<p>A&nbsp;road closure will occur&nbsp;at&nbsp;<strong>McMillan St, NW and Turner Place, NW</strong>&nbsp;in the West Campus Sector on&nbsp;<strong>Monday, December 20<span style="font-size:10.8333px">,</span>&nbsp;from 7 a.m. to noon</strong>.</p>]]></summary>  <dateline>2021-12-14T00:00:00-05:00</dateline>  <iso_dateline>2021-12-14T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-12-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jennifer.disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jennifer Disotell</strong></p><p>&nbsp;Special Projects Manager</p><p><strong>Infrastructure and Sustainability /&nbsp;</strong>Design &amp; Construction</p><p>470-378-6894</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>653673</item>      </media>  <hg_media>          <item>          <nid>653673</nid>          <type>image</type>          <title><![CDATA[McMillan Street Closure Dec. 20]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[McMillan Street closure Dec 20.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/McMillan%20Street%20closure%20Dec%2020.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/McMillan%20Street%20closure%20Dec%2020.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/McMillan%2520Street%2520closure%2520Dec%252020.jpg?itok=4tZYdtFL]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of McMillan Street road closure]]></image_alt>                    <created>1639448395</created>          <gmt_created>2021-12-14 02:19:55</gmt_created>          <changed>1639448395</changed>          <gmt_changed>2021-12-14 02:19:55</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="189523"><![CDATA[McMillan Street]]></keyword>          <keyword tid="189524"><![CDATA[transformer changeout]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="653672">  <title><![CDATA[Crane Staging Will Close Plant Drive Dec. 20 and Dec. 24]]></title>  <uid>35028</uid>  <body><![CDATA[<p>There will be a&nbsp;<strong>closure of Plant Drive between the Plant and Daniel &amp; Lyman Hall on Monday, December 20<sup>th</sup>&nbsp;from 7 a.m. to 5 p.m.</strong>.&nbsp; Be advised&nbsp;<strong>traffic will be re-routed to</strong>&nbsp;the Plant, Lyman and Daniel Hall parking areas via the&nbsp;<strong>2<sup>nd</sup>&nbsp;entrance to Plant Drive</strong>.&nbsp; Proceed with caution as this is against the normal flow of traffic around the building (although wide enough to accommodate incoming/outgoing vehicles).&nbsp;&nbsp;A spotter will be posted at the corner rounding North to the section of Plant Drive to the parking lots to slow vehicles down and warn of oncoming traffic. An additional spotter will be placed&nbsp;on Bobby Dodd to direct vehicles to the 2<sup>nd</sup>&nbsp;entrance to Plant Drive.</p><p>Normal access to Plant Drive will resume on December 21<sup>st</sup>.&nbsp;&nbsp;<strong>A similar shutdown for the crane to demobilize will occur as soon as December 24<sup>th</sup>&nbsp;or as late as Monday, December 27<sup>th</sup>.</strong>&nbsp;</p><p>This is Phase I of a project to replace roofing at the Holland Plant. &nbsp;Subsequent phases will follow during the first quarter&nbsp;of 2022.</p><p><br />&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1639447946</created>  <gmt_created>2021-12-14 02:12:26</gmt_created>  <changed>1639499592</changed>  <gmt_changed>2021-12-14 16:33:12</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[There will be a closure of Plant Drive between the Plant and Daniel & Lyman Hall on Monday, December 20th from 7 a.m. to 5 p.m.]]></teaser>  <type>news</type>  <sentence><![CDATA[There will be a closure of Plant Drive between the Plant and Daniel & Lyman Hall on Monday, December 20th from 7 a.m. to 5 p.m.]]></sentence>  <summary><![CDATA[<p>There will be a&nbsp;<strong>closure of Plant Drive between the Plant and Daniel &amp; Lyman Hall on Monday, December 20<sup>th</sup>&nbsp;from 7 a.m. to 5 p.m.</strong>.&nbsp; Be advised&nbsp;<strong>traffic will be re-routed to</strong>&nbsp;the Plant, Lyman and Daniel Hall parking areas via the&nbsp;<strong>2<sup>nd</sup>&nbsp;entrance to Plant Drive</strong>.</p>]]></summary>  <dateline>2021-12-13T00:00:00-05:00</dateline>  <iso_dateline>2021-12-13T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-12-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>This is Phase I of a project to replace roofing at the Holland Plant. &nbsp;Subsequent phases will follow during the first quarter&nbsp;of 2022.</p>]]></sidebar>  <email><![CDATA[jennifer.disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jennifer Disotell</strong></p><p>&nbsp;Special Projects Manager</p><p>Infrastructure &amp; Sustainability / Design &amp; Construction</p><p>470-378-6894</p><p>151 6th Street NW, Atlanta, GA 30332-0351</p><p>&nbsp;</p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>653671</item>      </media>  <hg_media>          <item>          <nid>653671</nid>          <type>image</type>          <title><![CDATA[Holland Plant Roofing Project Logistics Dec. 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Road Closure Crane Assembly - Holland Plant - Dec2021.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Road%20Closure%20Crane%20Assembly%20-%20Holland%20Plant%20-%20Dec2021.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Road%20Closure%20Crane%20Assembly%20-%20Holland%20Plant%20-%20Dec2021.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Road%2520Closure%2520Crane%2520Assembly%2520-%2520Holland%2520Plant%2520-%2520Dec2021.jpg?itok=vfcYEfeZ]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of road closures for crane staging for Holland Plant reroofing project]]></image_alt>                    <created>1639447177</created>          <gmt_created>2021-12-14 01:59:37</gmt_created>          <changed>1639447177</changed>          <gmt_changed>2021-12-14 01:59:37</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="70171"><![CDATA[Holland Plant]]></keyword>          <keyword tid="189522"><![CDATA[reroofing project]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="651360">  <title><![CDATA[Paper Tricentennial Building Front Driveway Entrance Closed Oct. 6 - Oct. 15]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Paper-Tricentennial Building&#39;s front driveway entrance will be closed from October&nbsp;6 - October&nbsp;15 for driveway improvements.&nbsp;&nbsp;During this period, all automotive and emergency access will utilize the rear entrance&nbsp;as shown on the map. This route has been proven to maintain 14&#39;+ and accommodate a fire&nbsp;truck. The&nbsp;temporary closure is permitted by the Georgia Tech Fire Safety Office.</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1633376711</created>  <gmt_created>2021-10-04 19:45:11</gmt_created>  <changed>1633378114</changed>  <gmt_changed>2021-10-04 20:08:34</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The front driveway entrance to the Paper Tricentennial Building will be closed Oct. 6 - Oct. 15.]]></teaser>  <type>news</type>  <sentence><![CDATA[The front driveway entrance to the Paper Tricentennial Building will be closed Oct. 6 - Oct. 15.]]></sentence>  <summary><![CDATA[<p>The front driveway entrance to&nbsp;the Paper Tricentennial Building will be closed&nbsp;from Oct. 6 - Oct. 15 for driveway improvements.</p><p>&nbsp;</p>]]></summary>  <dateline>2021-10-04T00:00:00-04:00</dateline>  <iso_dateline>2021-10-04T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-10-04 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Paper Tricentennial Building undergoes front driveway improvements.</p>]]></sidebar>  <email><![CDATA[Blake.baklini@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Blake Baklini&nbsp;</strong></p><p>Construction Project Manager<strong>&nbsp;&nbsp;​</strong></p><p><strong>Facilities Design &amp; Construction</strong></p><p><strong><strong>404.539.0118</strong></strong></p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>651359</item>      </media>  <hg_media>          <item>          <nid>651359</nid>          <type>image</type>          <title><![CDATA[Paper Tricentennial Impacts October 6 - 15, 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[paper tri oct 21 impacts.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/paper%20tri%20oct%2021%20impacts.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/paper%20tri%20oct%2021%20impacts.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/paper%2520tri%2520oct%252021%2520impacts.png?itok=xziil7p9]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of impacts to paper tri entrance oct 21]]></image_alt>                    <created>1633376131</created>          <gmt_created>2021-10-04 19:35:31</gmt_created>          <changed>1633376131</changed>          <gmt_changed>2021-10-04 19:35:31</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="66711"><![CDATA[Paper Tricentennial Building]]></keyword>          <keyword tid="188988"><![CDATA[driveway improvements]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="650529">  <title><![CDATA[Boiler Transfer from A. French Building to Bradley Building 9/9 and 9/10]]></title>  <uid>35028</uid>  <body><![CDATA[<p>A large equipment moving operation will take place in the vicinity of A. French and Bradley/Administration Building on the Hill 09/09 and 09/10 (7 a.m. to 10 a.m.).&nbsp; The operation will involve the movement of two (2) large boilers from the loading dock at A. French to the basement of Bradley Building with the use of a forklift.&nbsp;&nbsp;Pedestrians are requested&nbsp;to STAY ALERT AND FOLLOW ALL SAFETY COMMANDS BY THE CONTRACTOR&nbsp;while navigating through the work zone from 7 a.m. to 10 a.m. on 09/09 and 09/10.</p><p>The schedule is as follows for each day:</p><ol><li>7:00A-7:20A Unload boiler from delivery truck with forklift.</li><li>7:15A-7:30A &nbsp;Deliver forklift to Bradley Building basement stairs.</li><li>7:30A-8:00A Rigging of boiler to set boiler below steps.</li><li>8:00A-9:30A De-crate boiler, remove and haul-off crate debris, and remove boiler skin. Start handling/moving boiler inside Bradley basement.</li><li>10:00A Boiler is inside Bradley basement and forklift is staged on A. French loading dock for Friday 09/10 phase 2 boiler handling work day.</li></ol><p><strong>Please note that brief intermittent closure of Uncle Heinie Way may be necessary during the transport of the equipment from the loading dock. Be prepared to use alternate walking paths in the immediate area or wait for the path to re-open if such a closure is required.</strong>&nbsp; The Contractor will provide spotters in front of and behind forklift while in motion to watch for pedestrians.&nbsp; The green arrows in the map indicate the path of travel for forklift/equipment.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1631035359</created>  <gmt_created>2021-09-07 17:22:39</gmt_created>  <changed>1631035871</changed>  <gmt_changed>2021-09-07 17:31:11</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Two large boilers will be moved from the A. French Building to the Bradley Building.]]></teaser>  <type>news</type>  <sentence><![CDATA[Two large boilers will be moved from the A. French Building to the Bradley Building.]]></sentence>  <summary><![CDATA[<p>Two large boilers will be moved from the A. French Building to the Bradley Building on Thursday and Friday 9/9 and 9/10.</p>]]></summary>  <dateline>2021-09-07T00:00:00-04:00</dateline>  <iso_dateline>2021-09-07T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-09-07 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Movement of boiler from A. French building to Bradley Building will impact pathways on 9/9 and 9/10.</p>]]></sidebar>  <email><![CDATA[jennifer.disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jennifer Disotell</strong></p><p>&nbsp;Special Projects Manager/&nbsp;470-378-6894</p><p><a href="mailto:jennifer.disotell@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">jennifer.disotell@facilities.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>650528</item>      </media>  <hg_media>          <item>          <nid>650528</nid>          <type>image</type>          <title><![CDATA[Boiler Move from French to Bradley]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[boiler_move_toBradleypng.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/boiler_move_toBradleypng.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/boiler_move_toBradleypng.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/boiler_move_toBradleypng.png?itok=kaLybV8K]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of boilerm oving route from French to Bradley]]></image_alt>                    <created>1631034892</created>          <gmt_created>2021-09-07 17:14:52</gmt_created>          <changed>1631034892</changed>          <gmt_changed>2021-09-07 17:14:52</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="70161"><![CDATA[boilers]]></keyword>          <keyword tid="74341"><![CDATA[A. French Building]]></keyword>          <keyword tid="188802"><![CDATA[Bradley Building]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="650376">  <title><![CDATA[9th Street Paving to occur Friday 9/3]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The repaving on 9<sup>th</sup>&nbsp;Street was delayed because of the recent rain storms.&nbsp; 9<sup>th</sup>&nbsp;Street will be closed on Friday, 9/3 at&nbsp;9 a.m. to perform the required paving work. &nbsp;&nbsp;The work will be completed by the end of day on Friday.&nbsp; Please make sure any cars parked along 9<sup>th</sup>&nbsp;Street are moved by the end of day on Thursday, 9/2.&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1630524669</created>  <gmt_created>2021-09-01 19:31:09</gmt_created>  <changed>1630524796</changed>  <gmt_changed>2021-09-01 19:33:16</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Repaving of 9th street will occur Friday 9/3. Traffic rerouted.]]></teaser>  <type>news</type>  <sentence><![CDATA[Repaving of 9th street will occur Friday 9/3. Traffic rerouted.]]></sentence>  <summary><![CDATA[<p>Repaving of 9th street will occur Friday 9/3. Traffic rerouted.</p>]]></summary>  <dateline>2021-09-01T00:00:00-04:00</dateline>  <iso_dateline>2021-09-01T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-09-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mitchell.shelton@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Mitchell Shelton</strong></p><p>Construction Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>470-351-7746</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>647951</item>      </media>  <hg_media>          <item>          <nid>647951</nid>          <type>image</type>          <title><![CDATA[Paper Tricentennial Chilled Water Project Traffic Flow Plan June 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Paper Tri IPS&amp;T Traffic Rerouting Plan 05032021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Paper%20Tri%20IPS%26T%20Traffic%20Rerouting%20Plan%2005032021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Paper%20Tri%20IPS%26T%20Traffic%20Rerouting%20Plan%2005032021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Paper%2520Tri%2520IPS%2526T%2520Traffic%2520Rerouting%2520Plan%252005032021.png?itok=kV_CmExp]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[pic of traffic flow rerouting for Paper Tri chilled water project]]></image_alt>                    <created>1623087816</created>          <gmt_created>2021-06-07 17:43:36</gmt_created>          <changed>1623087816</changed>          <gmt_changed>2021-06-07 17:43:36</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="188775"><![CDATA[9th street]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="649693">  <title><![CDATA[City of Atlanta Water Main Installation Impacts Techwood Drive Intermittently Through October]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The City of Atlanta&nbsp;is&nbsp;installing&nbsp;a&nbsp;12-inch&nbsp;water main&nbsp;along&nbsp;Techwood&nbsp;Drive between North Avenue and 3rd&nbsp;Street/Bobby Dodd Way (adjacent to&nbsp;Bobby Dodd Stadium). The work has paused for the beginning of fall semester but will now resume intermittently&nbsp;through October. During installation, the northbound lane will be closed during normal business hours&nbsp;(approximately 9&nbsp;a.m. -&nbsp;4&nbsp;p.m.)&nbsp;Monday through Friday.&nbsp;The southbound lane will be used to maintain&nbsp;two-way traffic, with traffic controllers, during working hours. Both lanes&nbsp;of&nbsp;Techwood&nbsp;Drive&nbsp;will be open each night.&nbsp;&nbsp;</p><p>The access drives to&nbsp;Brittain&nbsp;Dining Hall&nbsp;and&nbsp;those&nbsp;in between Cloudman and Glenn&nbsp;Residence Halls&nbsp;will&nbsp;remain open. On-street parking in ER51 along&nbsp;Techwood&nbsp;Drive&nbsp;may be limited.&nbsp;</p><p>Georgia Tech Design &amp; Construction is working closely with the City of Atlanta to ensure campus improvements remain on schedule.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1629137718</created>  <gmt_created>2021-08-16 18:15:18</gmt_created>  <changed>1629138075</changed>  <gmt_changed>2021-08-16 18:21:15</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Water main installation will affect Techwood Drive traffic periodically through October.]]></teaser>  <type>news</type>  <sentence><![CDATA[Water main installation will affect Techwood Drive traffic periodically through October.]]></sentence>  <summary><![CDATA[<p>Water main installation on Techwood Drive will be ongoing through October 2021.</p>]]></summary>  <dateline>2021-08-16T00:00:00-04:00</dateline>  <iso_dateline>2021-08-16T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-08-16 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:mark.wood@facilities.gatech.edu">Mark Wood</a><br />Project Manager<br />Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>647960</item>      </media>  <hg_media>          <item>          <nid>647960</nid>          <type>image</type>          <title><![CDATA[Techwood Drive City of Atlanta Water Main installation June 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Techwood Drive Campus Notification June 2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Techwood%20Drive%20Campus%20Notification%20June%202021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Techwood%20Drive%20Campus%20Notification%20June%202021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Techwood%2520Drive%2520Campus%2520Notification%2520June%25202021.png?itok=JdtssVJ2]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1623091041</created>          <gmt_created>2021-06-07 18:37:21</gmt_created>          <changed>1623091041</changed>          <gmt_changed>2021-06-07 18:37:21</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="188001"><![CDATA[Techwood Drive]]></keyword>          <keyword tid="188002"><![CDATA[Water Main installation]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="649692">  <title><![CDATA[UPDATE: City of Atlanta Water Main Installation Impacts Techwood Drive Traffic Intermittently Through October]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The City of Atlanta&nbsp;is&nbsp;installing&nbsp;a&nbsp;12-inch&nbsp;water main&nbsp;along&nbsp;Techwood&nbsp;Drive between North Avenue and 3rd&nbsp;Street/Bobby Dodd Way (adjacent to&nbsp;Bobby Dodd Stadium). The work has paused for the beginning of fall semester but will resume intermittently through October. During installation, the northbound lane will be closed during normal business hours&nbsp;(approximately 9&nbsp;a.m. -&nbsp;4&nbsp;p.m.)&nbsp;Monday through Friday.&nbsp;The southbound lane will be used to maintain&nbsp;two-way traffic, with traffic controllers, during working hours. Both lanes&nbsp;of&nbsp;Techwood&nbsp;Drive&nbsp;will be open each night.&nbsp;&nbsp;</p><p>The access drives to&nbsp;Brittain&nbsp;Dining Hall&nbsp;and&nbsp;those&nbsp;in between Cloudman and Glenn&nbsp;Residence Halls&nbsp;will&nbsp;remain open. On-street parking in ER51 along&nbsp;Techwood&nbsp;Drive&nbsp;may be limited.&nbsp;</p><p>Georgia Tech Design &amp; Construction is working closely with the City of Atlanta to ensure campus improvements remain on schedule.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1629137157</created>  <gmt_created>2021-08-16 18:05:57</gmt_created>  <changed>1629137908</changed>  <gmt_changed>2021-08-16 18:18:28</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Water main installation will affect Techwood Drive traffic periodically through October.]]></teaser>  <type>news</type>  <sentence><![CDATA[Water main installation will affect Techwood Drive traffic periodically through October.]]></sentence>  <summary><![CDATA[<p>The City of Atlanta&nbsp;is&nbsp;installing&nbsp;a&nbsp;12-inch&nbsp;water main&nbsp;along&nbsp;Techwood&nbsp;Drive between North Avenue and 3rd&nbsp;Street/Bobby Dodd Way (adjacent to&nbsp;Bobby Dodd Stadium).</p>]]></summary>  <dateline>2021-06-07T00:00:00-04:00</dateline>  <iso_dateline>2021-06-07T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-06-07 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mark.wood@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:mark.wood@facilities.gatech.edu">Mark Wood</a><br />Project Manager<br />Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>647960</item>      </media>  <hg_media>          <item>          <nid>647960</nid>          <type>image</type>          <title><![CDATA[Techwood Drive City of Atlanta Water Main installation June 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Techwood Drive Campus Notification June 2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Techwood%20Drive%20Campus%20Notification%20June%202021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Techwood%20Drive%20Campus%20Notification%20June%202021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Techwood%2520Drive%2520Campus%2520Notification%2520June%25202021.png?itok=JdtssVJ2]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1623091041</created>          <gmt_created>2021-06-07 18:37:21</gmt_created>          <changed>1623091041</changed>          <gmt_changed>2021-06-07 18:37:21</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="188001"><![CDATA[Techwood Drive]]></keyword>          <keyword tid="188002"><![CDATA[Water Main installation]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="649312">  <title><![CDATA[Brittain Drive Closed For Street Painting August 9 - 12]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Brittain Drive will be closed for street painting August 9th -12th.&nbsp;&nbsp;</p><p>&quot;No Parking&quot; signage will be posted, and the road will be blocked off.&nbsp; Inclement weather could cause delays.</p><p>Thru traffic and street parking will be redirected with the assistance of Parking &amp; Transportation.</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1628267327</created>  <gmt_created>2021-08-06 16:28:47</gmt_created>  <changed>1628267327</changed>  <gmt_changed>2021-08-06 16:28:47</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Street painting will occur on Brittain Drive from August 9 - 12.]]></teaser>  <type>news</type>  <sentence><![CDATA[Street painting will occur on Brittain Drive from August 9 - 12.]]></sentence>  <summary><![CDATA[<p>Campus improvement projects continue with street painting of Brittain Drive from August 9 through August 12.</p>]]></summary>  <dateline>2021-08-06T00:00:00-04:00</dateline>  <iso_dateline>2021-08-06T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-08-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[chughes@athletics.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Should you have any questions, contact Christie E. Hughes, associate director of Athletic Events and Operations at&nbsp;<a href="mailto:chughes@athletics.gatech.edu" id="LPlnk367311" rel="noopener noreferrer" target="_blank">chughes@athletics.gatech.edu</a>.</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>649311</item>      </media>  <hg_media>          <item>          <nid>649311</nid>          <type>image</type>          <title><![CDATA[Road Closed Sign]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[road_closed_signpng.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/road_closed_signpng.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/road_closed_signpng.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/road_closed_signpng.png?itok=N9PPpeU-]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[image of road closed sign]]></image_alt>                    <created>1628266982</created>          <gmt_created>2021-08-06 16:23:02</gmt_created>          <changed>1628266982</changed>          <gmt_changed>2021-08-06 16:23:02</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="188429"><![CDATA[Brittain Drive]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="647954">  <title><![CDATA[UPDATE: 9th Street Partial Closure 6/14 - 8/17 (possibly 8/23)]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Paper Tricentennial Chilled Water Project&nbsp;&nbsp;</p><p>The installation of chilled water piping will begin Monday, June 14 and is expected to continue through Thursday, August 17.&nbsp; Due to changes in the thermal insulation required for the piping, work may continue through August 23. Daily&nbsp;work hours are between 7am and 3:30 pm.&nbsp;Construction activities include saw cutting,&nbsp;removal of asphalt&nbsp;and excavation work for the installation of new chilled water piping.&nbsp;</p><p>On Friday June 11,&nbsp;the contractor will restrict access to (8) parking spaces on 9th Street (highlighted in green). The plan is subject to change in case of&nbsp;inclement weather.</p><p>Thank you for your patience during this campus improvement.</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1623088472</created>  <gmt_created>2021-06-07 17:54:32</gmt_created>  <changed>1628006464</changed>  <gmt_changed>2021-08-03 16:01:04</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[9th Street Road Closure June 14th - August 17th for chilled water pipe installation]]></teaser>  <type>news</type>  <sentence><![CDATA[9th Street Road Closure June 14th - August 17th for chilled water pipe installation]]></sentence>  <summary><![CDATA[<p>The installation of chilled water piping will begin Monday, June 14 and is expected to continue through Thursday, August 17.&nbsp; Due to weather delays and changes to the installation of thermal insulation the project may run through 8/23.</p>]]></summary>  <dateline>2021-06-07T00:00:00-04:00</dateline>  <iso_dateline>2021-06-07T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-06-07 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mitchell.shelton@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Mitchell Shelton</strong></p><p>Construction Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>470-351-7746</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>647950</item>          <item>647951</item>      </media>  <hg_media>          <item>          <nid>647950</nid>          <type>image</type>          <title><![CDATA[Paper Tricentennial Chilled Water Project Logistics Plan June 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Paper Tri chill water piping install june 2021.JPG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Paper%20Tri%20chill%20water%20piping%20install%20june%202021.JPG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Paper%20Tri%20chill%20water%20piping%20install%20june%202021.JPG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Paper%2520Tri%2520chill%2520water%2520piping%2520install%2520june%25202021.JPG?itok=9ULH5a3_]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[pic of road closures for paper tri chilled water project]]></image_alt>                    <created>1623087704</created>          <gmt_created>2021-06-07 17:41:44</gmt_created>          <changed>1623087704</changed>          <gmt_changed>2021-06-07 17:41:44</gmt_changed>      </item>          <item>          <nid>647951</nid>          <type>image</type>          <title><![CDATA[Paper Tricentennial Chilled Water Project Traffic Flow Plan June 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Paper Tri IPS&amp;T Traffic Rerouting Plan 05032021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Paper%20Tri%20IPS%26T%20Traffic%20Rerouting%20Plan%2005032021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Paper%20Tri%20IPS%26T%20Traffic%20Rerouting%20Plan%2005032021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Paper%2520Tri%2520IPS%2526T%2520Traffic%2520Rerouting%2520Plan%252005032021.png?itok=kV_CmExp]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[pic of traffic flow rerouting for Paper Tri chilled water project]]></image_alt>                    <created>1623087816</created>          <gmt_created>2021-06-07 17:43:36</gmt_created>          <changed>1623087816</changed>          <gmt_changed>2021-06-07 17:43:36</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="66711"><![CDATA[Paper Tricentennial Building]]></keyword>          <keyword tid="187999"><![CDATA[chilled water piping]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="649000">  <title><![CDATA[UPDATE: Alley Paving Project - North & South of Ferst Drive between Fowler & Techwood]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Phase I</p><p>Milling and paving will take place in the alley North of Ferst Drive between Fowler and Techwood Drive, beginning Monday, July 26&nbsp;and completing Thursday, August 5&nbsp;(weather permitting).&nbsp; Patrons will need to continue parking in ER51 and 55. This is a phased&nbsp;paving repair project that also includes the alley South of Ferst Drive between Fowler and Techwood Drive.</p><p>Phase II</p><p>The alley South of Ferst Drive will follow Phase I and is anticipated to begin Monday, August 2&nbsp;to Friday, August 6.</p><p>There will be no access in or out of these areas from the time the work commences for each phase.&nbsp; Alternate parking has been approved by Parking &amp; Transportation and affected Greek Houses and service vendors have been notified.</p><p>If there are any questions or concerns during&nbsp;the week of August 2<sup>nd</sup>, please contact Jennifer Disotell&nbsp;at (470) 378-6894.</p><p>Thank you for your cooperation and patience during this campus improvement project.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1626987568</created>  <gmt_created>2021-07-22 20:59:28</gmt_created>  <changed>1627937298</changed>  <gmt_changed>2021-08-02 20:48:18</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Phased approach to alley paving north and south of Ferst Drive (between Fowler and Techwood) begins July 26.]]></teaser>  <type>news</type>  <sentence><![CDATA[Phased approach to alley paving north and south of Ferst Drive (between Fowler and Techwood) begins July 26.]]></sentence>  <summary><![CDATA[<p>Phased approach to alley paving north and south of Ferst Drive (between Fowler and Techwood) begins July 26 with expected completion August 6..</p>]]></summary>  <dateline>2021-07-22T00:00:00-04:00</dateline>  <iso_dateline>2021-07-22T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-07-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Campus Improvement projects are continually upgrading the campus experience for all members.&nbsp; Alley paving north and south of Ferst Drive between Fowler&nbsp;and Techwood will occur at the&nbsp;end of July and into&nbsp;early August 2021.</p>]]></sidebar>  <email><![CDATA[jennifer.disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>If there are any questions or concerns during&nbsp;the week of August 2<sup>nd</sup>, please contact Jennifer Disotell&nbsp;at (470) 378-6894.</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>648999</item>      </media>  <hg_media>          <item>          <nid>648999</nid>          <type>image</type>          <title><![CDATA[Alley Paving Project - North & South of Ferst Drive between Fowler & Techwood]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[alley_paving_july2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/alley_paving_july2021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/alley_paving_july2021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/alley_paving_july2021.png?itok=ts0omTvz]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1626986612</created>          <gmt_created>2021-07-22 20:43:32</gmt_created>          <changed>1626986612</changed>          <gmt_changed>2021-07-22 20:43:32</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="188319"><![CDATA[alley paving]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="647961">  <title><![CDATA[UPDATE: City of Atlanta Water Main Installation Impacts Techwood Drive Traffic Through August 12]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The City of Atlanta&nbsp;is&nbsp;installing&nbsp;a&nbsp;12-inch&nbsp;water main&nbsp;along&nbsp;Techwood&nbsp;Drive between North Avenue and 3rd&nbsp;Street/Bobby Dodd Way (adjacent to&nbsp;Bobby Dodd Stadium). The northbound lane will be closed during normal business hours&nbsp;(approximately 9&nbsp;a.m. -&nbsp;4&nbsp;p.m.)&nbsp;Monday through Friday&nbsp;through August 14. The southbound lane will be used to maintain&nbsp;two-way traffic, with traffic controllers, during working hours. Both lanes&nbsp;of&nbsp;Techwood&nbsp;Drive&nbsp;will be open each night.&nbsp;&nbsp;</p><p>The access drives to&nbsp;Brittain&nbsp;Dining Hall&nbsp;and&nbsp;those&nbsp;in between Cloudman and Glenn&nbsp;Residence Halls&nbsp;will&nbsp;remain open. On-street parking in ER51 along&nbsp;Techwood&nbsp;Drive&nbsp;may be limited.&nbsp;</p><p>Georgia Tech Design &amp; Construction is working closely with the City of Atlanta to ensure campus improvements remain on schedule.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1623091597</created>  <gmt_created>2021-06-07 18:46:37</gmt_created>  <changed>1626984947</changed>  <gmt_changed>2021-07-22 20:15:47</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Water main installation will affect Techwood Drive traffic through August 12.]]></teaser>  <type>news</type>  <sentence><![CDATA[Water main installation will affect Techwood Drive traffic through August 12.]]></sentence>  <summary><![CDATA[<p>The City of Atlanta&nbsp;is&nbsp;installing&nbsp;a&nbsp;12-inch&nbsp;water main&nbsp;along&nbsp;Techwood&nbsp;Drive between North Avenue and 3rd&nbsp;Street/Bobby Dodd Way (adjacent to&nbsp;Bobby Dodd Stadium).</p>]]></summary>  <dateline>2021-06-07T00:00:00-04:00</dateline>  <iso_dateline>2021-06-07T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-06-07 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mark.wood@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:mark.wood@facilities.gatech.edu">Mark Wood</a><br />Project Manager<br />Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>647960</item>      </media>  <hg_media>          <item>          <nid>647960</nid>          <type>image</type>          <title><![CDATA[Techwood Drive City of Atlanta Water Main installation June 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Techwood Drive Campus Notification June 2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Techwood%20Drive%20Campus%20Notification%20June%202021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Techwood%20Drive%20Campus%20Notification%20June%202021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Techwood%2520Drive%2520Campus%2520Notification%2520June%25202021.png?itok=JdtssVJ2]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1623091041</created>          <gmt_created>2021-06-07 18:37:21</gmt_created>          <changed>1623091041</changed>          <gmt_changed>2021-06-07 18:37:21</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1317"><![CDATA[News Briefs]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="188001"><![CDATA[Techwood Drive]]></keyword>          <keyword tid="188002"><![CDATA[Water Main installation]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="648995">  <title><![CDATA[State Street Road Closure July 26 - 30 for Infrastructure Improvements]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Campus infrastructure improvements along State Street will begin each day at 6:00 a.m. and end at 2:30 p.m. from July 26 through July 30.&nbsp;Construction activities include saw cutting /&nbsp;removal&nbsp;of asphalt, hydrovac excavation for the installation of HDPE discharge piping from the chilled water manhole to the existing stormwater catch basin.</p><p>Access to the Kendeda Building loading dock will be restricted and has been approved by the Building Director and Manager. Signage will be in place indicating road and sidewalk closures.&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp;</strong></p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1626981434</created>  <gmt_created>2021-07-22 19:17:14</gmt_created>  <changed>1626981640</changed>  <gmt_changed>2021-07-22 19:20:40</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Improvements to the chilled water system along State Street begin July 26.]]></teaser>  <type>news</type>  <sentence><![CDATA[Improvements to the chilled water system along State Street begin July 26.]]></sentence>  <summary><![CDATA[<p>The installation of&nbsp;pumped discharged piping from the chilled water manhole to an existing stormwater catch basin along State Street begins July 26 and runs through July 30, 6:00 a.m. - 2:30 p.m. daily, weather permitting.&nbsp;</p>]]></summary>  <dateline>2021-07-22T00:00:00-04:00</dateline>  <iso_dateline>2021-07-22T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-07-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Campus infrastruction improvements will close State Street July 26 - 30, from 6:00 a.m. to 2:30 p.m. daily.</p>]]></sidebar>  <email><![CDATA[cristina.fannin@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Cristina Fannin</strong></p><p>Construction Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>648994</item>      </media>  <hg_media>          <item>          <nid>648994</nid>          <type>image</type>          <title><![CDATA[State Street Chilled Water Manhole Sump Project July 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[state_street_sump_July2021.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/state_street_sump_July2021.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/state_street_sump_July2021.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/state_street_sump_July2021.jpg?itok=59G4Jmsd]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of state street manhole sump project road closure plan]]></image_alt>                    <created>1626980339</created>          <gmt_created>2021-07-22 18:58:59</gmt_created>          <changed>1626980339</changed>          <gmt_changed>2021-07-22 18:58:59</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="182634"><![CDATA[State Street]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="648879">  <title><![CDATA[Pi Mile Marker Improvement Project Begins July 21]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning July 21, Design &amp; Construction will begin the Pi Mile Marker improvement project. This&nbsp;project entails the demolition of the inset markers along&nbsp;the trail and the installation of a new, more robust granite marker. Sidewalks around the&nbsp;trail will be briefly interrupted for the installation. A crew of workers will begin in quadrant 1 and work clock-wise to completion. Signage surrounding work areas will&nbsp;be setup and taken down per location as cutting of concrete takes place.&nbsp;Expect detours for pedestrian traffic. The estimated completion date is August 21.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1626713464</created>  <gmt_created>2021-07-19 16:51:04</gmt_created>  <changed>1626714318</changed>  <gmt_changed>2021-07-19 17:05:18</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Improvement of the Pi Mile Markers across campus will begin July 21.]]></teaser>  <type>news</type>  <sentence><![CDATA[Improvement of the Pi Mile Markers across campus will begin July 21.]]></sentence>  <summary><![CDATA[<p>The Pi Mile Marker improvement project will upgrade the inset markers to granite.</p>]]></summary>  <dateline>2021-07-19T00:00:00-04:00</dateline>  <iso_dateline>2021-07-19T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-07-19 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Pi Mile trail markers upgraded during July and August.</p>]]></sidebar>  <email><![CDATA[Blake.baklini@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Blake Baklini</p><p>Design &amp; Construction</p><p>Construction Project Manager</p><p>404.668.0761&nbsp; &nbsp;&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>648878</item>      </media>  <hg_media>          <item>          <nid>648878</nid>          <type>image</type>          <title><![CDATA[Pi Mile Marker Improvement Project]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[pimile_marker_project_july2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/pimile_marker_project_july2021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/pimile_marker_project_july2021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/pimile_marker_project_july2021.png?itok=k8nq2uxr]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[pic of pi mile marker upgrade plan]]></image_alt>                    <created>1626712836</created>          <gmt_created>2021-07-19 16:40:36</gmt_created>          <changed>1626712836</changed>          <gmt_changed>2021-07-19 16:40:36</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="188298"><![CDATA[pi mile markers]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="648719">  <title><![CDATA[10th Street Sidewalk Improvements Begin July 16]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Sidewalk improvements will begin July 16 along 10th Street.&nbsp;Locations&nbsp;include 10th Street&nbsp; (southside)&nbsp;from Northside Drive to Hemphill Avenue and Hemphill Avenue from 10th Street to 8th Street.&nbsp;The sidewalks will be closed for approximately 90 days. Signage will be in place to&nbsp;provide direction for pedestrian traffic to the opposite sidewalks.&nbsp; Temporary fencing will be installed.</p><p>This project will continue&nbsp;the sidewalk detail found in front of the Georgia Tech&nbsp;Police Department, improve lighting/safety and&nbsp;increase accessiblity and ADA compliance. The new sidewalk will be widened to 12&#39; with a brick-band detail providing character to the walkway along 10th Street and&nbsp;in front of&nbsp;Paper Tricentennial Building.&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1626192866</created>  <gmt_created>2021-07-13 16:14:26</gmt_created>  <changed>1626194198</changed>  <gmt_changed>2021-07-13 16:36:38</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Streetscaping project begins along 10th Street July 16]]></teaser>  <type>news</type>  <sentence><![CDATA[Streetscaping project begins along 10th Street July 16]]></sentence>  <summary><![CDATA[<p>Campus sidewalks along 10th street from Northside Drive to Hemphill Avenue will undergo streetscape improvements.</p>]]></summary>  <dateline>2021-07-13T00:00:00-04:00</dateline>  <iso_dateline>2021-07-13T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-07-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Campus sidewalk improvements begin along 10th Street.</p>]]></sidebar>  <email><![CDATA[Blake.baklini@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>If you have any questions throughout this project, please contact:&nbsp;</p><p><strong>Blake Baklini</strong>&nbsp;at&nbsp;<strong>404.539.0118</strong></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>648720</item>      </media>  <hg_media>          <item>          <nid>648720</nid>          <type>image</type>          <title><![CDATA[Sidewalk Improvements along 10th Street begin July 16]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[10thstreetsidewalkjuly2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/10thstreetsidewalkjuly2021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/10thstreetsidewalkjuly2021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/10thstreetsidewalkjuly2021.png?itok=8AKSAOeX]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[image of sidewalks affected in streetscape improvements along 10th street]]></image_alt>                    <created>1626193102</created>          <gmt_created>2021-07-13 16:18:22</gmt_created>          <changed>1626193102</changed>          <gmt_changed>2021-07-13 16:18:22</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="188250"><![CDATA[10th Street sidewalks]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="647705">  <title><![CDATA[LOVE Building Passenger Elevator Unavailable 6/19 - 8/2]]></title>  <uid>35028</uid>  <body><![CDATA[<p>A new passenger elevator will be installed in the LOVE Manufacturing Building during the months of June and July.&nbsp;Building staff and visitors must&nbsp;use the stairs during the replacement time period. Signage will be posted accordingly.&nbsp;Facilities Design &amp; Construction apologizes for any inconvenience&nbsp;caused by this equipment upgrade.&nbsp;Thank you for your understanding.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1621888237</created>  <gmt_created>2021-05-24 20:30:37</gmt_created>  <changed>1623090161</changed>  <gmt_changed>2021-06-07 18:22:41</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The passenger elevator will be unavailable for use beginning June 10th.]]></teaser>  <type>news</type>  <sentence><![CDATA[The passenger elevator will be unavailable for use beginning June 10th.]]></sentence>  <summary><![CDATA[<p>The LOVE Manufacturing Building will have a new passenger elevator installed during the months of June and July.&nbsp;&nbsp;</p>]]></summary>  <dateline>2021-05-24T00:00:00-04:00</dateline>  <iso_dateline>2021-05-24T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-05-24 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Replacement of passenger elevator in the LOVE Building this summer.</p>]]></sidebar>  <email><![CDATA[fenella.bryant@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Fenella Bryant</p><p>Construction Project Manager</p><p>Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>647704</item>      </media>  <hg_media>          <item>          <nid>647704</nid>          <type>image</type>          <title><![CDATA[Image of Elevator panel]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[elevator_button_photo.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/elevator_button_photo.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/elevator_button_photo.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/elevator_button_photo.jpg?itok=IsnHl-As]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[image of elevator panel]]></image_alt>                    <created>1621887351</created>          <gmt_created>2021-05-24 20:15:51</gmt_created>          <changed>1621887351</changed>          <gmt_changed>2021-05-24 20:15:51</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="187916"><![CDATA[LOVE Building]]></keyword>          <keyword tid="187917"><![CDATA[elevator replacement]]></keyword>          <keyword tid="174080"><![CDATA[Elevators]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="647708">  <title><![CDATA[Campus Center Construction Impacts - June 2021]]></title>  <uid>35028</uid>  <body><![CDATA[<p>We have good news to share in that our footprint is finally beginning to shrink, and hopefully we are less of&nbsp;an inconvenience to you all as detours around the site should all but be eliminated. The&nbsp;northern end of the project site will formally be handed back to Georgia Tech in June.&nbsp;</p><p><strong>Arts Plaza and Landscaping Connecting to Tech Green:</strong></p><p>*Sidewalk and stairs from the Ferst Center Arts Plaza to Einstein Statue is complete. Fencing will be modified to provide a full pedestrian accessible pathway from Ferst Center to Tech Green -&nbsp;&nbsp;anticipated by June 4.</p><p><strong>Phase II Building Construction:</strong></p><p>*Construction fencing is installed around perimeter of the site.&nbsp; Wayfinding signage is installed.&nbsp;Please see attached logistics plan.</p><p>* Exterior and interior construction activities are underway at both the Wenn building and new Stamps Commons&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1621889802</created>  <gmt_created>2021-05-24 20:56:42</gmt_created>  <changed>1623089198</changed>  <gmt_changed>2021-06-07 18:06:38</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction Impacts for Campus Center during the month of June 2021]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction Impacts for Campus Center during the month of June 2021]]></sentence>  <summary><![CDATA[<p>The&nbsp;northern end of the project site will formally be handed back to Georgia Tech in June.&nbsp;</p>]]></summary>  <dateline>2021-05-24T00:00:00-04:00</dateline>  <iso_dateline>2021-05-24T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-05-24 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>The Campus Center project is moving along according to plan.</p>]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>647706</item>      </media>  <hg_media>          <item>          <nid>647706</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts: May 2021 - June 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 2 - June 2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20June%202021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20June%202021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25202%2520-%2520June%25202021.png?itok=PVTYYReF]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of campus center construction activity month of June]]></image_alt>                    <created>1621889291</created>          <gmt_created>2021-05-24 20:48:11</gmt_created>          <changed>1621889291</changed>          <gmt_changed>2021-05-24 20:48:11</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Campus Center ]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="647428">  <title><![CDATA[Crane Staging Atlantic Drive Thursday and Friday 5/13 and 5/14]]></title>  <uid>35028</uid>  <body><![CDATA[<p>There will be a crane set up on Atlantic Drive, north of Ferst Drive between the IBB and Nanotech buildings (see attached for the exact location). It will be used to remove the old switchgear and to set the new switchgear in IBB. It will be there from Thursday morning (5/13) to Friday morning (5/14). A crane permit has already been issued by GTFSO. The area will be properly barricaded and it will not cut off access to any point on campus.</p><p>Please feel free to call (404-630-6486) or email with any questions or concerns.&nbsp;</p><p>&nbsp;</p><p><strong>&nbsp;</strong></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1620857637</created>  <gmt_created>2021-05-12 22:13:57</gmt_created>  <changed>1620858228</changed>  <gmt_changed>2021-05-12 22:23:48</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Crane staging on Atlantic Drive for switchgear installation.]]></teaser>  <type>news</type>  <sentence><![CDATA[Crane staging on Atlantic Drive for switchgear installation.]]></sentence>  <summary><![CDATA[<p>A crane will be staged on Atlantic Drive May 13 and 14 for the removal/installation of switchgear for IBB.</p>]]></summary>  <dateline>2021-05-12T00:00:00-04:00</dateline>  <iso_dateline>2021-05-12T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-05-12 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mark.wood@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Mark Wood</strong></p><p>Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>C: 404-630-6486</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>647427</item>      </media>  <hg_media>          <item>          <nid>647427</nid>          <type>image</type>          <title><![CDATA[Crane Staging Atlantic Drive May 13-14]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[IBB Switchgear - Lift Plan, May 13th.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/IBB%20Switchgear%20-%20Lift%20Plan%2C%20May%2013th.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/IBB%20Switchgear%20-%20Lift%20Plan%2C%20May%2013th.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/IBB%2520Switchgear%2520-%2520Lift%2520Plan%252C%2520May%252013th.png?itok=OMGqCtin]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1620857271</created>          <gmt_created>2021-05-12 22:07:51</gmt_created>          <changed>1620857271</changed>          <gmt_changed>2021-05-12 22:07:51</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="187097"><![CDATA[Facilities Notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="183322"><![CDATA[crane staging]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="645957">  <title><![CDATA[Bicycle Safety Road Striping April 5 at Intersection of Ferst & 6th]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Monday, April&nbsp;5, a&nbsp;striping&nbsp;activity will occur at the intersection of Ferst Drive and 6th Street. Application of the bike&nbsp;directional route&nbsp;inside the pedestrian box will occur. Flaggers&nbsp;will be present to direct&nbsp;traffic through&nbsp;the intersection which will be reduced to one lane for most&nbsp;of the day.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1617210444</created>  <gmt_created>2021-03-31 17:07:24</gmt_created>  <changed>1617210541</changed>  <gmt_changed>2021-03-31 17:09:01</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Bicycle Safety intersection striping to occur April 5]]></teaser>  <type>news</type>  <sentence><![CDATA[Bicycle Safety intersection striping to occur April 5]]></sentence>  <summary><![CDATA[<p>Bicycle lane striping to occur at the intersection of Ferst and 6th on Monday, April 5.</p>]]></summary>  <dateline>2021-03-31T00:00:00-04:00</dateline>  <iso_dateline>2021-03-31T00:00:00-04:00</iso_dateline>  <gmt_dateline>2021-03-31 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Blake.baklini@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>For&nbsp;assistance, please contact:</p><p>Blake Baklini at 404.539.0118</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>645956</item>      </media>  <hg_media>          <item>          <nid>645956</nid>          <type>image</type>          <title><![CDATA[Ferst/6th intersection striping]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[ferst_bike_striping_apr21.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/ferst_bike_striping_apr21.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/ferst_bike_striping_apr21.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/ferst_bike_striping_apr21.png?itok=5QXc_NkW]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of striping for Ferst and 6th ]]></image_alt>                    <created>1617210114</created>          <gmt_created>2021-03-31 17:01:54</gmt_created>          <changed>1617210114</changed>          <gmt_changed>2021-03-31 17:01:54</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="58431"><![CDATA[bike safety]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="645010">  <title><![CDATA[Partial closure of 9th Street and McMillan Street on Thursday 3/11 and Friday 3/12]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Pedestrian and vehicle travel will be affected by the temporary partial closure of 9<sup>th</sup>&nbsp;Street and McMillan Street on Thursday March 11&nbsp;and Friday March 12.&nbsp; The service lot and dumpsters on 9<sup>th</sup>&nbsp;Street will remain accessible during the project.&nbsp; Both streets should be re-opened by the end of day on the 12.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1614888080</created>  <gmt_created>2021-03-04 20:01:20</gmt_created>  <changed>1615348949</changed>  <gmt_changed>2021-03-10 04:02:29</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Roadwork will cause temporary, partial closure of 9th and McMillan]]></teaser>  <type>news</type>  <sentence><![CDATA[Roadwork will cause temporary, partial closure of 9th and McMillan]]></sentence>  <summary><![CDATA[<p>Roadwork will cause temporary, partial closure of 9th and McMillan Streets.</p>]]></summary>  <dateline>2021-03-04T00:00:00-05:00</dateline>  <iso_dateline>2021-03-04T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-03-04 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[mitchell.shelton@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Mitchell Shelton</p><p>Construction Project Manager II</p><p>Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>645180</item>      </media>  <hg_media>          <item>          <nid>645180</nid>          <type>image</type>          <title><![CDATA[Road impacts near Paper Tricentennial Bldg]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[chilled_water_pothole_march21revised.JPG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/chilled_water_pothole_march21revised.JPG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/chilled_water_pothole_march21revised.JPG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/chilled_water_pothole_march21revised.JPG?itok=qV6pX3sw]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of partial road closure near Paper Tricentennial Building]]></image_alt>                    <created>1615348748</created>          <gmt_created>2021-03-10 03:59:08</gmt_created>          <changed>1615348748</changed>          <gmt_changed>2021-03-10 03:59:08</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="66711"><![CDATA[Paper Tricentennial Building]]></keyword>          <keyword tid="187194"><![CDATA[chilled water]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="644597">  <title><![CDATA[8th Street, between Curran Street and McMillan, closed for 24 hours on 2/25]]></title>  <uid>35028</uid>  <body><![CDATA[<p>&nbsp;Thursday 2/25, beginning at 7:00am, the GTPD will be closing 8th Street between Curran Street and McMillan for 24 hours&nbsp;to allow the Atlanta Watershed to perform necessary repairs&nbsp;on the sewer main.</p><p>Parking spaces on 8th Street as well as shuttle bus routes around the area will be affected.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1614097932</created>  <gmt_created>2021-02-23 16:32:12</gmt_created>  <changed>1614097932</changed>  <gmt_changed>2021-02-23 16:32:12</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[8th Street, between Curran and McMillan, closed for the day 2/25]]></teaser>  <type>news</type>  <sentence><![CDATA[8th Street, between Curran and McMillan, closed for the day 2/25]]></sentence>  <summary><![CDATA[<p>Thursday 2/25 beginning at 7:00am the GTPD will be closing 8th Street between Curran Street and McMillan for 24 hours&nbsp;to allow the Atlanta Watershed to perform the work on the sewer main.</p>]]></summary>  <dateline>2021-02-23T00:00:00-05:00</dateline>  <iso_dateline>2021-02-23T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-02-23 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>8th St., between Curran and McMillan, closed 2/25 for sewer main repair.</p>]]></sidebar>  <email><![CDATA[william.varnado@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<blockquote><p>Will Varnado</p><p>Mechanical Shop Foreperson</p><p>Infrastructure and Plant Operations</p><p>Cell: 404-825-6282</p><p>Office: 404-385-0403</p></blockquote><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="187099"><![CDATA[water main repair]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="644576">  <title><![CDATA[Campus Center Construction Impacts March - April 2021]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Campus Center construction logistics for March 2021 through April 2021.</p><p>Changes are minimal, however there are&nbsp;modifications to the fence line.&nbsp; The limits of site disturbance have crept slightly, impacting the corner of Tech Green and extending northwards to the W021 parking lot.&nbsp; This work is to connect in with existing pathways and grades.&nbsp;</p><p>&nbsp;</p><p><strong>General:</strong></p><p>*Surface Lot 2 and Student Center parking deck remain open for public use.</p><p>*Heavy construction traffic in this sector of campus.</p><p>*Normal working hours are Monday - Saturday 6:00 AM &ndash; 5:30 PM.</p><p>&nbsp;</p><p><strong>Phase II Building Construction:</strong></p><p>*Construction fencing is installed around perimeter of the site.&nbsp; Wayfinding signage is installed.&nbsp;</p><p>* Construction of the Stamps Commons building continues.&nbsp;</p><p>* Pedestrians to be aware of high truck traffic leaving the loading dock of the existing Wenn building.</p><p>* Build back of the Wenn Student is underway.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1614041737</created>  <gmt_created>2021-02-23 00:55:37</gmt_created>  <changed>1614041737</changed>  <gmt_changed>2021-02-23 00:55:37</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Campus center construction continues.]]></teaser>  <type>news</type>  <sentence><![CDATA[Campus center construction continues.]]></sentence>  <summary><![CDATA[<p>Campus Center construction logistics for March 2021 through April 2021.</p>]]></summary>  <dateline>2021-02-22T00:00:00-05:00</dateline>  <iso_dateline>2021-02-22T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-02-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Construction continues in Phase II of the Campus Center project.</p>]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>644575</item>      </media>  <hg_media>          <item>          <nid>644575</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - March 2021]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 2 - March 2021 - April 2021.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20March%202021%20-%20April%202021.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20March%202021%20-%20April%202021.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25202%2520-%2520March%25202021%2520-%2520April%25202021.png?itok=2BLspygR]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of campus center contruction activity March - April 2021]]></image_alt>                    <created>1614041375</created>          <gmt_created>2021-02-23 00:49:35</gmt_created>          <changed>1614041375</changed>          <gmt_changed>2021-02-23 00:49:35</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Campus Center ]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="644487">  <title><![CDATA[Ferst Drive Traffic Temporarily Reduced to One Lane to Create Bicycle Improvements]]></title>  <uid>27705</uid>  <body><![CDATA[<div>Tuesday, February 23, an all-day road striping activity will reduce the intersection to one lane of traffic at Ferst Drive and 6th Street. An updated bike directional route inside the pedestrian box will be applied to improve multi-modale street usage. Throughout the day, flaggers&nbsp;will be present to direct traffic through the intersection.</div><div>&nbsp;</div>]]></body>  <author>Jessica Rose</author>  <status>1</status>  <created>1613732959</created>  <gmt_created>2021-02-19 11:09:19</gmt_created>  <changed>1614038363</changed>  <gmt_changed>2021-02-22 23:59:23</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Tuesday, February 23, an all-day road striping activity will reduce the intersection to one lane of traffic at Ferst Drive and 6th Street.]]></teaser>  <type>news</type>  <sentence><![CDATA[Tuesday, February 23, an all-day road striping activity will reduce the intersection to one lane of traffic at Ferst Drive and 6th Street.]]></sentence>  <summary><![CDATA[<p>Tuesday, February 23, an all-day road striping activity will reduce the intersection to one lane of traffic at Ferst Drive and 6th Street.</p>]]></summary>  <dateline>2021-02-19T00:00:00-05:00</dateline>  <iso_dateline>2021-02-19T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-02-19 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jrose@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jessica Rose, Facilities: Communications</p><p>Blake Baklini, Facilities Construction Project Manager</p><p>404.539.0118, &nbsp;bbaklini3@gatech.edu&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>644574</item>      </media>  <hg_media>          <item>          <nid>644574</nid>          <type>image</type>          <title><![CDATA[Bicycle Safety Improvements 2/23/21]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[snipofferstdrivebikestriping.JPG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/snipofferstdrivebikestriping.JPG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/snipofferstdrivebikestriping.JPG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/snipofferstdrivebikestriping.JPG?itok=RENRahxG]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of bicycle safety improvements ]]></image_alt>                    <created>1614037468</created>          <gmt_created>2021-02-22 23:44:28</gmt_created>          <changed>1614037468</changed>          <gmt_changed>2021-02-22 23:44:28</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="71811"><![CDATA[Office of Parking and Transportation Services]]></keyword>          <keyword tid="719"><![CDATA[CRC]]></keyword>          <keyword tid="172824"><![CDATA[bicycle friendly university]]></keyword>          <keyword tid="12691"><![CDATA[Bicycle Infrastructure Improvement Committee]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="644573">  <title><![CDATA[Crane staging at the Ben T. Zinn Combustion Lab]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Crane staging will occur on Tuesday, 2/23 between 6am and 11am at The Ben T.&nbsp;Zinn Combustion Lab.&nbsp; Several parking spaces on Tech Way NW will be blocked off during this time.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1614036833</created>  <gmt_created>2021-02-22 23:33:53</gmt_created>  <changed>1614038324</changed>  <gmt_changed>2021-02-22 23:58:44</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Crane staging at Ben Zinn Combusion Lab, parking spaces to be blocked]]></teaser>  <type>news</type>  <sentence><![CDATA[Crane staging at Ben Zinn Combusion Lab, parking spaces to be blocked]]></sentence>  <summary><![CDATA[<p>Crane staging will occur on Tuesday, 2/23 between 6am and 11am at The Ben T. Zinn Combustion Lab.&nbsp; Several parking spaces on Tech Way NW will be blocked off during this time.</p>]]></summary>  <dateline>2021-02-22T00:00:00-05:00</dateline>  <iso_dateline>2021-02-22T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-02-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Crane staging 2/23 at Ben T. Zinn Combustion Lab.</p>]]></sidebar>  <email><![CDATA[federico.delrisco@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Federico Del Risco,&nbsp;</strong>PE, CEM, BOC1</p><p>Utilities Engineer 2</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Building Engineering &amp; Energy</p><p>&nbsp;</p><p>404-894-4749&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>644572</item>      </media>  <hg_media>          <item>          <nid>644572</nid>          <type>image</type>          <title><![CDATA[Crane staging at Ben Zinn Combustion Lab]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[zinn_combustion_crane.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/zinn_combustion_crane.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/zinn_combustion_crane.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/zinn_combustion_crane.png?itok=_2dW9mP5]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of crane staging at Zinn Combustion Lab]]></image_alt>                    <created>1614036272</created>          <gmt_created>2021-02-22 23:24:32</gmt_created>          <changed>1614036272</changed>          <gmt_changed>2021-02-22 23:24:32</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>          <keyword tid="183322"><![CDATA[crane staging]]></keyword>          <keyword tid="171652"><![CDATA[Ben T. Zinn Combustion Lab]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="641090">  <title><![CDATA[Crane Staging For 10th Street Chiller Plant Will Have Road Impacts]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Work on the Tenth Street Chiller Plant&nbsp;will require a crane to be on-site 2/1, 2/12 and 2/12.&nbsp; See attached vehicular rerouting plan.&nbsp;</p><p>There will be a street closure and detour signs at 9<sup>th</sup>&nbsp;St. &amp; Hemphill St.&nbsp; GT Police have been notified of this work.&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p><a href="mailto:carla.barbour@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">carla.barbour@facilities.gatech.edu</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1604693583</created>  <gmt_created>2020-11-06 20:13:03</gmt_created>  <changed>1611790758</changed>  <gmt_changed>2021-01-27 23:39:18</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Work on the Tenth Street Chiller Plant will require a crane to be on-site 2/1, 2/2, and 2/12 resulting in a street closure and detour signs at 9th St. & Hemphill St.]]></teaser>  <type>news</type>  <sentence><![CDATA[Work on the Tenth Street Chiller Plant will require a crane to be on-site 2/1, 2/2, and 2/12 resulting in a street closure and detour signs at 9th St. & Hemphill St.]]></sentence>  <summary><![CDATA[<p>Work on the Tenth Street Chiller Plant&nbsp;will require a crane to be on-site on the following days - 2/1, 2/2 and 2/12&nbsp;resulting in&nbsp;a street closure and detour signs at 9<sup>th</sup>&nbsp;St. &amp; Hemphill St.</p>]]></summary>  <dateline>2020-11-06T00:00:00-05:00</dateline>  <iso_dateline>2020-11-06T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-11-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[carla.barbour@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Carla Barbour, PMP, LEED AP</strong></p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>404-242-7351</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>641089</item>      </media>  <hg_media>          <item>          <nid>641089</nid>          <type>image</type>          <title><![CDATA[Road impacts from 10th Street Chiller Plant construction]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Tenth_St_Chiller_plant_Reroute Plan 11062020.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Tenth_St_Chiller_plant_Reroute%20Plan%2011062020.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Tenth_St_Chiller_plant_Reroute%20Plan%2011062020.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Tenth_St_Chiller_plant_Reroute%2520Plan%252011062020.png?itok=vYSxjppF]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of crane staging for 10th street chiller work]]></image_alt>                    <created>1604693053</created>          <gmt_created>2020-11-06 20:04:13</gmt_created>          <changed>1604693053</changed>          <gmt_changed>2020-11-06 20:04:13</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="183322"><![CDATA[crane staging]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="643529">  <title><![CDATA[Crane Staging For 10th Street Chiller Plant Will Have Road Impacts]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Work on the Tenth Street Chiller Plant will require a crane to be on site Feb. 1st, 2nd and 12th.&nbsp; See attached vehicular rerouting plan.</p><p>There will be a street closure and detour sign at 9th Street and Hemphill.&nbsp; Geogia Tech Police have been notified of this work.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1611787280</created>  <gmt_created>2021-01-27 22:41:20</gmt_created>  <changed>1611787280</changed>  <gmt_changed>2021-01-27 22:41:20</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Work on the Tenth Street Chiller Plant will require a crane to be on-site 2/1, 2/2, and 2/12 resulting in a street closure and detour signs at 9th St. & Hemphill St.]]></teaser>  <type>news</type>  <sentence><![CDATA[Work on the Tenth Street Chiller Plant will require a crane to be on-site 2/1, 2/2, and 2/12 resulting in a street closure and detour signs at 9th St. & Hemphill St.]]></sentence>  <summary><![CDATA[<p>Work on the Tenth Street Chiller Plant will require a crane to be on-site on the following days - 2/1, 2/2, and 2/12 resulting in a street closure and detour signs at 9th Street and Hemphill.</p>]]></summary>  <dateline>2021-01-27T00:00:00-05:00</dateline>  <iso_dateline>2021-01-27T00:00:00-05:00</iso_dateline>  <gmt_dateline>2021-01-27 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[carla.barbour@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Carla Barbour, PMP, LEED AP</p><p>Georgia Tech / Facilities Design &amp; Construction</p><p>404-242-7351</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>641089</item>      </media>  <hg_media>          <item>          <nid>641089</nid>          <type>image</type>          <title><![CDATA[Road impacts from 10th Street Chiller Plant construction]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Tenth_St_Chiller_plant_Reroute Plan 11062020.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Tenth_St_Chiller_plant_Reroute%20Plan%2011062020.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Tenth_St_Chiller_plant_Reroute%20Plan%2011062020.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Tenth_St_Chiller_plant_Reroute%2520Plan%252011062020.png?itok=vYSxjppF]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of crane staging for 10th street chiller work]]></image_alt>                    <created>1604693053</created>          <gmt_created>2020-11-06 20:04:13</gmt_created>          <changed>1604693053</changed>          <gmt_changed>2020-11-06 20:04:13</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="183322"><![CDATA[crane staging]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="641913">  <title><![CDATA[Ferst Drive Water Main Excavation Near Weber Building 12/14-12/18]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Excavation will occur on Ferst Drive&nbsp;in front of the Weber Building to confirm the location, depth, and size of the city of Atlanta watermain to aid in the design of a new sprinkler system for the Weber Building.</p><p>The eastbound lane of Ferst Drive will be closed during the day with two-way traffic maintained in the westbound lane by traffic control.&nbsp; Road plates will cover the excavation site and both lanes will be open at the end of the work day.&nbsp; Bus stops will not be affected but there may be slight delays in the bus routes.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1607379597</created>  <gmt_created>2020-12-07 22:19:57</gmt_created>  <changed>1607379657</changed>  <gmt_changed>2020-12-07 22:20:57</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Excavation will take place 12/14-12/18]]></teaser>  <type>news</type>  <sentence><![CDATA[Excavation will take place 12/14-12/18]]></sentence>  <summary><![CDATA[<p>The eastbound lane of Ferst Drive in front of the Weber Building will be closed during the work day 12/14 - 12/18.</p>]]></summary>  <dateline>2020-12-07T00:00:00-05:00</dateline>  <iso_dateline>2020-12-07T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-12-07 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Eastbound lane of Ferst Drive closed daily for excavation of water main in front of Weber Building.</p>]]></sidebar>  <email><![CDATA[mark.wood@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Mark Wood</p><p>Project Manager</p><p>Facilities Design &amp; Construction</p><p>404-630-6486</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>641912</item>      </media>  <hg_media>          <item>          <nid>641912</nid>          <type>image</type>          <title><![CDATA[Ferst Drive Water Main Excavation Near Weber Building]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Ferst Drive excavation 122020.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Ferst%20Drive%20excavation%20122020.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Ferst%20Drive%20excavation%20122020.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Ferst%2520Drive%2520excavation%2520122020.png?itok=mqgLyLuB]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of location of water main excavation ferst drive]]></image_alt>                    <created>1607379022</created>          <gmt_created>2020-12-07 22:10:22</gmt_created>          <changed>1607379022</changed>          <gmt_changed>2020-12-07 22:10:22</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="176685"><![CDATA[Ferst Drive]]></keyword>          <keyword tid="178188"><![CDATA[water main]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="641867">  <title><![CDATA[6th Street & Ferst Drive Bike Safety Improvements]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Between 12/7-12/9, the intersection of Ferst Drive and 6th Street will undergo a restriping effort. During this time, an official flagging crew will be in place on both ends of the impacted area directing the flow of traffic. At times, traffic&nbsp;will be reduced to one lane temporarily impacting the normal flow. Interruption should be minimal. Please see the diagram for the&nbsp;affected area. Our on-site contact&nbsp;during this process is superintendent -&nbsp;Antwon Morgan/Albion 404.625.7702&nbsp; Thank you for your patience during these improvements.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1607096998</created>  <gmt_created>2020-12-04 15:49:58</gmt_created>  <changed>1607097059</changed>  <gmt_changed>2020-12-04 15:50:59</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Bike safety improvements to occur on Ferst Drive near 6th street 12/7-12/9]]></teaser>  <type>news</type>  <sentence><![CDATA[Bike safety improvements to occur on Ferst Drive near 6th street 12/7-12/9]]></sentence>  <summary><![CDATA[<p>Between 12/7-12/9 the intersection of Ferst Drive and 6th Street will undergo a restriping effort.&nbsp;</p>]]></summary>  <dateline>2020-12-04T00:00:00-05:00</dateline>  <iso_dateline>2020-12-04T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-12-04 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Flaggers to control traffic on Ferst Drive near 6th St. for bike safety improvements]]>  </subtitle>  <sidebar><![CDATA[<p>Safety improvements for Ferst Drive and 6th Street to occur 12/7-12/9.</p>]]></sidebar>  <email><![CDATA[Blake.baklini@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Blake Baklini</p><p>blake.baklini@facilities.gatech.edu</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>641864</item>      </media>  <hg_media>          <item>          <nid>641864</nid>          <type>image</type>          <title><![CDATA[Ferst/6th intersection striping]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[ferst_bike_safety_dec20.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/ferst_bike_safety_dec20.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/ferst_bike_safety_dec20.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/ferst_bike_safety_dec20.png?itok=ZLv8sHx8]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of ferst drive and 6th street safety improvements]]></image_alt>                    <created>1607096385</created>          <gmt_created>2020-12-04 15:39:45</gmt_created>          <changed>1607096385</changed>          <gmt_changed>2020-12-04 15:39:45</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="58431"><![CDATA[bike safety]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="640552">  <title><![CDATA[Crane Staging near Engineering Science & Mechanics Bldg on Oct. 24]]></title>  <uid>35028</uid>  <body><![CDATA[<p>A&nbsp;crane will be staged this Saturday Oct. 24&nbsp;at the ESM building between 6:00 am to 10:00 am to replace an RTU.</p><p>Per the attached plan, the&nbsp;contractor will be using parking spaces between ESM and the Guggenheim building.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1603491818</created>  <gmt_created>2020-10-23 22:23:38</gmt_created>  <changed>1603491818</changed>  <gmt_changed>2020-10-23 22:23:38</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[A crane will be staged at the ESM Bldg from 6a-10am on Oct. 24]]></teaser>  <type>news</type>  <sentence><![CDATA[A crane will be staged at the ESM Bldg from 6a-10am on Oct. 24]]></sentence>  <summary><![CDATA[<p>A crane will be staged at the ESM Bldg on Oct. 24 from 6-10a for building maintenance.&nbsp;&nbsp;</p>]]></summary>  <dateline>2020-10-23T00:00:00-04:00</dateline>  <iso_dateline>2020-10-23T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-10-23 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[federico.delrisco@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Federico Del Risco,&nbsp;</strong>PE, CEM, BOC1</p><p>Utilities Engineer 2</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Building Engineering &amp; Energy</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>640551</item>      </media>  <hg_media>          <item>          <nid>640551</nid>          <type>image</type>          <title><![CDATA[Crane staging Engineering Science & Mechanics Building]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[crane_staging_102420-2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/crane_staging_102420-2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/crane_staging_102420-2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/crane_staging_102420-2.png?itok=ZAIuYB-K]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[pic of where crane will be located 102420]]></image_alt>                    <created>1603491488</created>          <gmt_created>2020-10-23 22:18:08</gmt_created>          <changed>1603491488</changed>          <gmt_changed>2020-10-23 22:18:08</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="639127">  <title><![CDATA[Bicycle Safety Improvements at 6th St & Ferst Dr to begin 9/21]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Starting 9/21, the&nbsp;<strong>6th Street &amp; Ferst Drive Bike Safety Improvements&nbsp;</strong>project will begin and span an 8-week period.</p><p>The east side of Ferst Drive pedestrian and bike path will be diverted during this project as per the plan below with signage&nbsp;for directions to designated crossing points.</p><p>Ferst Drive will go down&nbsp;to one lane for a period of 2 days during the project&nbsp;with flaggers to facilitate vehicles.</p><p>The construction area will remain fenced&nbsp;with access only to emergency personnel and&nbsp;scheduled deliveries.</p><p>If access is needed for deliveries, please contact Johnny Sherman - 770.596.3434&nbsp;directly to schedule.&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1600190954</created>  <gmt_created>2020-09-15 17:29:14</gmt_created>  <changed>1600192000</changed>  <gmt_changed>2020-09-15 17:46:40</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Improvement project to span 8-week period.]]></teaser>  <type>news</type>  <sentence><![CDATA[Improvement project to span 8-week period.]]></sentence>  <summary><![CDATA[<p>The improvement&nbsp;project will span an 8-week period.&nbsp;&nbsp;</p>]]></summary>  <dateline>2020-09-15T00:00:00-04:00</dateline>  <iso_dateline>2020-09-15T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-09-15 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Improvements for bike safety on 6th Street &amp; Ferst Drive&nbsp;to begin week of 9/21.</p>]]></sidebar>  <email><![CDATA[Blake.baklini@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Blake Baklini</p><p>Construction Project Manager</p><p>Facilities Design &amp; Construction</p><p>404.539.0118</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>639128</item>      </media>  <hg_media>          <item>          <nid>639128</nid>          <type>image</type>          <title><![CDATA[6th Street & Ferst Drive Bike Safety Improvement map]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[6th_street_ferst_drive_bike_safety_improvements_map.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/6th_street_ferst_drive_bike_safety_improvements_map.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/6th_street_ferst_drive_bike_safety_improvements_map.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/6th_street_ferst_drive_bike_safety_improvements_map.png?itok=KHO2gNud]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of 6th street & Ferst Drive bike safety improvement project]]></image_alt>                    <created>1600191234</created>          <gmt_created>2020-09-15 17:33:54</gmt_created>          <changed>1600191234</changed>          <gmt_changed>2020-09-15 17:33:54</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="172520"><![CDATA[6th Street]]></keyword>          <keyword tid="176685"><![CDATA[Ferst Drive]]></keyword>          <keyword tid="172523"><![CDATA[bicycle safety]]></keyword>          <keyword tid="46231"><![CDATA[bike lanes]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="638769">  <title><![CDATA[Campus Center Construction Impacts - September 2020]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>General:</strong></p><p>*Surface Lot 2 and Student Center parking deck remain open for public use.</p><p>*Heavy construction traffic in this sector of campus.</p><p>*Normal working hours are Monday - Saturday 6:00 AM &ndash; 5:30 PM.</p><p><strong>Arts Plaza Exterior Work:</strong></p><p>*Pavers and sidewalk in front and around the Ferst Center Arts Plaza is complete.&nbsp;</p><p>*Fencing has been modified to open up Ferst Center front doors and the connecting pathway around the Ferst Center for the Arts.</p><p><strong>Phase II Building Construction:</strong></p><p>*Construction fencing is installed around perimeter of the site.&nbsp; Wayfinding signage is installed.&nbsp;</p><p>* Demolition of the Stamps Commons building is ongoing, the above grade structure has been demolished with only the post office and foundations remaining.&nbsp;</p><p>* Pedestrians to be aware of high truck traffic leaving the loading dock of the existing Wenn building as debris is hauled off site.</p><p>* Interior demolition of the Wenn Student is underway.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1599158764</created>  <gmt_created>2020-09-03 18:46:04</gmt_created>  <changed>1599158764</changed>  <gmt_changed>2020-09-03 18:46:04</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction Impacts for Campus Center during the month of September 2020]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction Impacts for Campus Center during the month of September 2020]]></sentence>  <summary><![CDATA[<p>Phase II work is underway for the Campus Center project including demolition and rebuild of Stamps Commons and renovation of the Wenn Student Center.</p>]]></summary>  <dateline>2020-09-03T00:00:00-04:00</dateline>  <iso_dateline>2020-09-03T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-09-03 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Campus center construction activities move forward in September.</p>]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>638768</item>      </media>  <hg_media>          <item>          <nid>638768</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - September 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 2 - September 2020.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20September%202020.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%202%20-%20September%202020.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25202%2520-%2520September%25202020.png?itok=gi85L8Nm]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of campus center construction activity September 2020]]></image_alt>                    <created>1599158304</created>          <gmt_created>2020-09-03 18:38:24</gmt_created>          <changed>1599158304</changed>          <gmt_changed>2020-09-03 18:38:24</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Campus Center ]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="638053">  <title><![CDATA[Campus Road Closures]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The City of Atlanta Department of Watershed Management (DWM) is continuing emergency work to repair the broken 30&quot; main at Hemphill Avenue and Ferst Drive. Worked paused during move-in, and DWM expects to have the latest work completed this week. The plan is to reconnect campus buildings to a newer water main and eventually abandon the 30&quot; main, given its age and recurring issues.&nbsp;&nbsp;</p><p>Affected Roads (see map):</p><ul><li>Hemphill Avenue is closed to all inbound (southbound) traffic from 10th Street.</li><li>Hemphill Avenue is closed in both directions between Ferst Drive and 8th Street.</li><li>Outbound (northbound) traffic is permitted from 8th to 10th Street.</li><li>9th Street is closed from Hemphill Avenue to Curran Street.</li><li>McMillan Street is closed between 9th and 8th Streets.</li></ul><p>Timeline:</p><ul><li>DWM expects to have work at Hemphill and Ferst completed by the end of the week.</li><li>DWM expects to have work around McMillan and 9th completed today.</li></ul><p>Detouring:</p><ul><li>To access campus from 10th Street, use State Street or Fowler Street.</li><li>West Campus is still accessible through 6th Street.</li></ul><p>Water Impacts:</p><ul><li>No further water service impacts are expected from this work, with the exception of a brief outage at 8th Street Apartments to transition to the new main.</li></ul><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1597785116</created>  <gmt_created>2020-08-18 21:11:56</gmt_created>  <changed>1597838783</changed>  <gmt_changed>2020-08-19 12:06:23</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Campus Road Closures due to the continuing repair work on water main.]]></teaser>  <type>news</type>  <sentence><![CDATA[Campus Road Closures due to the continuing repair work on water main.]]></sentence>  <summary><![CDATA[<p>Atlanta Watershed Management is continuing their emergency work to repair the broken 30&quot; main at Hemphill &amp; Ferst.</p>]]></summary>  <dateline>2020-08-18T00:00:00-04:00</dateline>  <iso_dateline>2020-08-18T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-08-18 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Ongoing water main repair temporarily causes road closures.</p>]]></sidebar>  <email><![CDATA[William.Smith@ep.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>William Smith</strong><br />Director,&nbsp;Georgia Tech&nbsp;Office of Emergency&nbsp;Management&nbsp;&amp; Communications</p><p>Georgia Tech Police Department<br />965 Hemphill Ave NW</p><p>Atlanta, GA 30332<br />404-593-1030</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>638054</item>      </media>  <hg_media>          <item>          <nid>638054</nid>          <type>image</type>          <title><![CDATA[Water Main repair work on Hemphill August road closures]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[wateer_main_repair.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/wateer_main_repair.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/wateer_main_repair.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/wateer_main_repair.png?itok=sh_8InMe]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of road closures due to water main repair]]></image_alt>                    <created>1597785286</created>          <gmt_created>2020-08-18 21:14:46</gmt_created>          <changed>1597785286</changed>          <gmt_changed>2020-08-18 21:14:46</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="178188"><![CDATA[water main]]></keyword>          <keyword tid="10969"><![CDATA[road closure]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="637538">  <title><![CDATA[City Water Main Break on Hemphill Under Repair ]]></title>  <uid>27705</uid>  <body><![CDATA[<p>Ongoing repair work related to the major water main break that erupted at the intersection of Hemphill Avenue and Ferst Drive may cause some disruptions on campus. The two locations where the City of Atlanta will be working on the repair are near the Sustainable Education Building in the driving lane and near Weber Building at Ferst Drive.</p><p>GT Facilities Management is working with the the City to try to schedule the most disruptive work between Thanksgiving and early January in an attempt to minimize additional impacts to campus. The long term plan is to re-feed municipal water connections to newer source lines, instead of from the very old, 30&rdquo; city line that runs from 10th Street to North Avenue.</p><p>The initial water main eruption occured on Saturday, June 27 and continued for more than a week, sending thousands of gallons of water into the center of campus. This is a City of Atlanta Watershed project and is not led by Georgia Tech. For updates related to watershed projects, please visit the watershed press release page.</p>]]></body>  <author>Jessica Rose</author>  <status>1</status>  <created>1596647843</created>  <gmt_created>2020-08-05 17:17:23</gmt_created>  <changed>1596662990</changed>  <gmt_changed>2020-08-05 21:29:50</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[A large water main break and associated repair will cause some disruption to campus roadways through fall. ]]></teaser>  <type>news</type>  <sentence><![CDATA[A large water main break and associated repair will cause some disruption to campus roadways through fall. ]]></sentence>  <summary><![CDATA[<p>Water main repair work continues on campus.</p>]]></summary>  <dateline>2020-08-05T00:00:00-04:00</dateline>  <iso_dateline>2020-08-05T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-08-05 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jrose@gatech.edu ]]></email>  <location></location>  <contact><![CDATA[<p>Jessica Rose</p><p>Analytics &amp; Communications</p><p>Facilities Management</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>637556</item>      </media>  <hg_media>          <item>          <nid>637556</nid>          <type>image</type>          <title><![CDATA[Water Main repair work on Hemphill August 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Watermain_break_Hemphill.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Watermain_break_Hemphill.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Watermain_break_Hemphill.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Watermain_break_Hemphill.jpg?itok=FeU83bSF]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[picture of water main repair work]]></image_alt>                    <created>1596662768</created>          <gmt_created>2020-08-05 21:26:08</gmt_created>          <changed>1596662768</changed>          <gmt_changed>2020-08-05 21:26:08</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://www.atlantawatershed.org/press-releases1/]]></url>        <title><![CDATA[Watershed Management Press Page]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="64319"><![CDATA[Administration and Finance]]></group>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="185473"><![CDATA[water efficiency]]></keyword>          <keyword tid="1134"><![CDATA[City of Atlanta]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="636826">  <title><![CDATA[Campus Center Construction Impacts - July 2020]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>Campus Center &ndash; Construction Impacts, Schedule &ndash; Phase I</strong></p><p><strong>July 2020:</strong></p><p>In the month of July 2020, Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will be completed, work will begin on Phase 2, the renovation of the Student Center.</p><p><strong>General:</strong></p><p>*Surface Lot 2 (Student Center lot) will remain open for public use.</p><p>*Construction truck traffic continues in the west sector of campus.</p><p>*Normal working hours are Monday - Saturday 6:30 AM &ndash; 5:30 PM.</p><p><strong>Phase I Building Construction (Caf&eacute;, Pavillion and Exhibition Hall):</strong></p><p>* The construction of the new Caf&eacute;, Pavilions and Exhibition Hall buildings will be complete during this month, with final touch up work and detailing occuring.</p><p>* Installation of Audio Visual systems, end user and mainteance training will be on going.</p><p>*Landscaping around the Phase I construction will be ongoing with plant, shrubs, and groundcover installation.</p><p>* Exterior accessories (benches, waste receptacles etc) will be installed.</p><p><strong>Arts Plaza Exterior Work:</strong></p><p>*Hardscapes including site walls, sidewalks and pavers will be installed.</p><p>*Landscaping around the Arts Plaza will be installed.</p><p>*Fencing will be modified to open up Ferst Center front doors and pathway from Ferst Center to ISYE lawn by August 1<sup>st</sup>.</p><p><strong>Phase II Building Construction (Wenn Student Center and Stamps Commons):</strong></p><p>*Construction fencing will be installed around perimeter of the site.&nbsp; Wayfinding signage will be installed.&nbsp; Please see attached logistics plan.</p><p>*Abatement and demolition scope of work will commence.</p><p>*Public forum area will remain open until September, 2020</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1594238035</created>  <gmt_created>2020-07-08 19:53:55</gmt_created>  <changed>1594240205</changed>  <gmt_changed>2020-07-08 20:30:05</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The campus center construction project moves into Phase II.]]></teaser>  <type>news</type>  <sentence><![CDATA[The campus center construction project moves into Phase II.]]></sentence>  <summary><![CDATA[<p>Phase II of the Campus Center contruction project begins this month.&nbsp; The new Cafe, Exhibition Hall and Pavilions are on track for&nbsp;completion.</p>]]></summary>  <dateline>2020-07-08T00:00:00-04:00</dateline>  <iso_dateline>2020-07-08T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-07-08 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>Phase II of the Campus Center project includes the renovation of the original part of the Student Center building and a new three-story addition in place of the Stamps Commons.</p>]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>636827</item>          <item>636828</item>          <item>636834</item>          <item>636835</item>      </media>  <hg_media>          <item>          <nid>636827</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - July 6-12, 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - July 2020 (2)-1.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20July%202020%20%282%29-1.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20July%202020%20%282%29-1.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520July%25202020%2520%25282%2529-1.png?itok=JwH-5jlz]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of construction impact for campus center july 2020]]></image_alt>                    <created>1594238980</created>          <gmt_created>2020-07-08 20:09:40</gmt_created>          <changed>1594239020</changed>          <gmt_changed>2020-07-08 20:10:20</gmt_changed>      </item>          <item>          <nid>636828</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - July 13-23, 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - July 2020 (2)-2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20July%202020%20%282%29-2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20July%202020%20%282%29-2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520July%25202020%2520%25282%2529-2.png?itok=4xikNZlk]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of campus center logistics July 2020]]></image_alt>                    <created>1594239146</created>          <gmt_created>2020-07-08 20:12:26</gmt_created>          <changed>1594239193</changed>          <gmt_changed>2020-07-08 20:13:13</gmt_changed>      </item>          <item>          <nid>636834</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - July 24-31, 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - July 2020 (2)-3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20July%202020%20%282%29-3_0.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20July%202020%20%282%29-3_0.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520July%25202020%2520%25282%2529-3_0.png?itok=YuAkond5]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of campus center construction July 2020]]></image_alt>                    <created>1594239853</created>          <gmt_created>2020-07-08 20:24:13</gmt_created>          <changed>1594239887</changed>          <gmt_changed>2020-07-08 20:24:47</gmt_changed>      </item>          <item>          <nid>636835</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - August 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - July 2020 (2)-4.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20July%202020%20%282%29-4.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20July%202020%20%282%29-4.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520July%25202020%2520%25282%2529-4.png?itok=4m5ZXIZy]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of campus center construction activity july 2020]]></image_alt>                    <created>1594239992</created>          <gmt_created>2020-07-08 20:26:32</gmt_created>          <changed>1594240114</changed>          <gmt_changed>2020-07-08 20:28:34</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Campus Center ]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="636675">  <title><![CDATA[W23-North Campus Parking Deck Reopens July 6]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The&nbsp;W23-North Campus parking deck will reopen Monday, July 6&nbsp;to permit, SmartPark and visitor parking. For several weeks, the parking deck was the site of Covid-19 testing. The entire parking facility is being disinfected before opening. This includes:</p><p>&bull; Stairwell handrails</p><p>&bull; Elevator doors, walls, ceilings and floors.</p><p>&bull; Exterior and interior elevator buttons</p><p>&bull; Emergency phone buttons</p><p>&bull;&nbsp;Entry and exiting ticket dispenser panels</p><p>&bull; Prox card readers at entry and exiting gates</p><p>General parking questions may be directed to PTS at 404-385-7275. Please reach out to us with questions or concerns you may have. We are here to help.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1593622161</created>  <gmt_created>2020-07-01 16:49:21</gmt_created>  <changed>1593622438</changed>  <gmt_changed>2020-07-01 16:53:58</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Covid-19 testing at the parking deck has now ended.]]></teaser>  <type>news</type>  <sentence><![CDATA[Covid-19 testing at the parking deck has now ended.]]></sentence>  <summary><![CDATA[<p>The&nbsp;W23-North Campus parking deck will reopen Monday, July 6&nbsp;to permit, SmartPark and visitor parking.</p>]]></summary>  <dateline>2020-07-01T00:00:00-04:00</dateline>  <iso_dateline>2020-07-01T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-07-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p>Parking and Transportation Services&nbsp;&nbsp;</p><p><a href="http://www.pts.gatech.edu/" id="LPlnk223136" rel="noopener noreferrer" target="_blank">www.pts.gatech.edu</a>&nbsp;&nbsp;</p><p>404-385-7275 or 404-385-7433&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>636676</item>      </media>  <hg_media>          <item>          <nid>636676</nid>          <type>image</type>          <title><![CDATA[Map of W23 parking deck]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[W23_parking_map.JPG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/W23_parking_map.JPG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/W23_parking_map.JPG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/W23_parking_map.JPG?itok=l2nscf5C]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[pic of parking map for W23 deck]]></image_alt>                    <created>1593622391</created>          <gmt_created>2020-07-01 16:53:11</gmt_created>          <changed>1593622391</changed>          <gmt_changed>2020-07-01 16:53:11</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="174520"><![CDATA[campus parking]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="636602">  <title><![CDATA[Ground level/Dalney Street entrance of the W22-Dalney Deck is currently closed]]></title>  <uid>35028</uid>  <body><![CDATA[<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p><p>The ground level/Dalney Street entrance of the W22-Dalney&nbsp;Deck&nbsp;is currently closed for cleaning due a water main break.&nbsp;You may continue to park on the other levels of the deck and enter only through&nbsp;the Greenfield Street/10<sup>th&nbsp;</sup>Street entrance.</p><p>Visitors parking for W22 will not be available. Visitors may park in other visitor locations.</p><p><strong>Questions about this project may be directed to Raymond Santana at&nbsp;</strong><a href="mailto:raymond.santana@parking.gatech.edu" rel="noopener noreferrer" target="_blank"><strong>raymond.santana@parking.gatech.edu</strong></a><strong>.</strong></p><p><strong>General parking questions may be directed to PTS at 404-385-7275.</strong></p><p>We understand that these accommodations may be an inconvenience to you. We apologize for the short notice. Thank you for your patience, cooperation, and continued support.&nbsp;</p><p>Parking and Transportation Services&nbsp;</p><p><a href="http://www.pts.gatech.edu/" rel="noopener noreferrer" target="_blank">www.pts.gatech.edu</a>&nbsp;</p><p>404-385-7275 or 404-385-7433&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1593464056</created>  <gmt_created>2020-06-29 20:54:16</gmt_created>  <changed>1593464056</changed>  <gmt_changed>2020-06-29 20:54:16</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The ground level/Dalney Street entrance of the W22-Dalney Deck is currently closed for cleanup.]]></teaser>  <type>news</type>  <sentence><![CDATA[The ground level/Dalney Street entrance of the W22-Dalney Deck is currently closed for cleanup.]]></sentence>  <summary><![CDATA[<p>The ground level/Dalney Street entrance of the W22-Dalney&nbsp;Deck&nbsp;is currently closed for cleaning due a water main break.</p>]]></summary>  <dateline>2020-06-29T00:00:00-04:00</dateline>  <iso_dateline>2020-06-29T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-06-29 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>The ground level/Dalney Street entrance of the W22-Dalney&nbsp;Deck&nbsp;is currently closed for cleaning due a water main break.</p>]]></sidebar>  <email><![CDATA[raymand.santana@parking.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Raymond Santana</p><p>Parking &amp; Transportation Services</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>636601</item>      </media>  <hg_media>          <item>          <nid>636601</nid>          <type>image</type>          <title><![CDATA[No Parking sign]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[no parking sign.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/no%20parking%20sign.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/no%20parking%20sign.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/no%2520parking%2520sign.jpg?itok=KiT_20wC]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[no parking sign]]></image_alt>                    <created>1593463540</created>          <gmt_created>2020-06-29 20:45:40</gmt_created>          <changed>1593463540</changed>          <gmt_changed>2020-06-29 20:45:40</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="174520"><![CDATA[campus parking]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="635875">  <title><![CDATA[Campus Center Construction Modified to Capitalize on Quiet]]></title>  <uid>28046</uid>  <body><![CDATA[<p>There is a lot to miss about campus life while most work and learning remains remote &mdash; but the hassle of campus construction is not one of them. With that in mind, the team behind the Campus Center project is making the best of this unprecedented situation, rearranging the construction schedule to tackle the most disruptive work while campus is closed.</p><p>Contractors have mobilized for Phase 2 of the project, beginning work on the hardscape and utilities around the entrance to the Ferst Center for the Arts. Initially slated for 2022, work that would have taken place piecemeal &mdash; and disruptively under normal campus operations &mdash; has been moved up for completion while in-person instruction is suspended.</p><p>With students and staff working remotely, work can proceed without the need for complex staging and sequencing to maximize construction efficiency and minimize impacts to the community. For those still living or working on campus at this time, pathways through the plaza in front of the Ferst Center have been diverted to the south and west around the Smithgall Student Services Building and to the east around the Student Center and Ferst Center. (See Phase 2a diagram.)</p><p>As crews prepare for this phase, which includes the renovation of the current Student Center and the demolition and rebuilding of the Stamps Commons, they will soon begin abatement and demolition on the food court greenhouse, mobilization of the construction trailer, and site preparations. Fencing around the Phase 2 site is expected to be in place in late July, at which point pedestrian traffic will be diverted to the north around the free speech area and to the south along Ferst Drive. (See Phase 2b diagram.)</p><p>The hardscape around Ferst Plaza, including a new home for the beloved Dean Griffin statue, is expected to reopen with some temporary pathways in place when students return to campus in August. The plaza is expected to be fully open in October.</p><p>As campus gradually reopens, most of the Student Center&rsquo;s critical functions will begin operating in temporary locations in the new exhibition hall and pavilion buildings. The Georgia Tech Post Office will continue to operate in the Student Center until early July. For more details on temporary locations and timing for&nbsp;each function&rsquo;s move, visit&nbsp;<a href="https://studentcenter.gatech.edu/student-center-move-out">studentcenter.gatech.edu/student-center-move-out</a>.</p><p>The entire Campus Center project is expected to be complete in late 2022. For more information about the project, visit&nbsp;<a href="https://studentcenter.gatech.edu/campus-center-project">c.gatech.edu/CampusCenter</a>.</p>]]></body>  <author>Kate Curnow</author>  <status>1</status>  <created>1591040081</created>  <gmt_created>2020-06-01 19:34:41</gmt_created>  <changed>1591710557</changed>  <gmt_changed>2020-06-09 13:49:17</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The team behind the Campus Center project is making the best of this unprecedented situation, rearranging the construction schedule to tackle the most disruptive work while campus is closed.]]></teaser>  <type>news</type>  <sentence><![CDATA[The team behind the Campus Center project is making the best of this unprecedented situation, rearranging the construction schedule to tackle the most disruptive work while campus is closed.]]></sentence>  <summary><![CDATA[<p>The team behind the Campus Center project is making the best of this unprecedented situation, rearranging the construction schedule to tackle the most disruptive work while campus is closed.</p>]]></summary>  <dateline>2020-06-01T00:00:00-04:00</dateline>  <iso_dateline>2020-06-01T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-06-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Less campus traffic allows Tech to preempt future construction headaches]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p>Kate Curnow</p><p><a href="mailto:kate.curnow@stucen.gatech.edu">kate.curnow@stucen.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>635871</item>          <item>635870</item>          <item>635874</item>      </media>  <hg_media>          <item>          <nid>635871</nid>          <type>image</type>          <title><![CDATA[Campus Center Project Phase 2A Construction Diagram]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[CC workmap Phase 2A 620.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/CC%20workmap%20Phase%202A%20620.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/CC%20workmap%20Phase%202A%20620.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/CC%2520workmap%2520Phase%25202A%2520620.jpg?itok=lcpN4_2h]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Campus Center Project Phase 2A Construction Diagram]]></image_alt>                    <created>1591039249</created>          <gmt_created>2020-06-01 19:20:49</gmt_created>          <changed>1591039249</changed>          <gmt_changed>2020-06-01 19:20:49</gmt_changed>      </item>          <item>          <nid>635870</nid>          <type>image</type>          <title><![CDATA[Campus Center Project Phase 2B Construction Diagram]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[CC workmap Phase 2B 620.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/CC%20workmap%20Phase%202B%20620.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/CC%20workmap%20Phase%202B%20620.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/CC%2520workmap%2520Phase%25202B%2520620.jpg?itok=ikdR1HYX]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Campus Center Project Phase 2B Construction Diagram]]></image_alt>                    <created>1591039050</created>          <gmt_created>2020-06-01 19:17:30</gmt_created>          <changed>1591039050</changed>          <gmt_changed>2020-06-01 19:17:30</gmt_changed>      </item>          <item>          <nid>635874</nid>          <type>image</type>          <title><![CDATA[Dean Griffin during construction]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[IMG_4293.JPG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/IMG_4293.JPG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/IMG_4293.JPG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/IMG_4293.JPG?itok=DNPtSCLK]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Dean Griffin statue stored indoors during construction on his setting]]></image_alt>                    <created>1591039562</created>          <gmt_created>2020-06-01 19:26:02</gmt_created>          <changed>1591039562</changed>          <gmt_changed>2020-06-01 19:26:02</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://studentcenter.gatech.edu/campus-center-project]]></url>        <title><![CDATA[The Campus Center Project]]></title>      </link>          <link>        <url><![CDATA[https://studentcenter.gatech.edu/about-phase-ii]]></url>        <title><![CDATA[Phase 2 Interactive Map]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="1294"><![CDATA[Auxiliary Services]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="166965"><![CDATA[Student Center]]></keyword>          <keyword tid="9169"><![CDATA[Georgia Tech Student Center]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>          <keyword tid="1400"><![CDATA[Construction]]></keyword>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="635386">  <title><![CDATA[Crane Staging on Sixth Street May 18 - 22]]></title>  <uid>35028</uid>  <body><![CDATA[<p>&nbsp;Sixth Street will be partialy blocked beginning&nbsp;May 18, 2020 through May 22, 2020.&nbsp;</p><p>A&nbsp;speaker system will be installed on the Roe Stamps Field video board located on the south side of Sixth Street just west of Ferst Drive.&nbsp; The south sidewalk will be closed as well.&nbsp; This closure is weather dependent.</p><p>The boom truck will be placed along the south sidewalk allowing traffic to pass on the north side of the street.&nbsp; See attached plan.</p><p><strong>Spencer Sheffield</strong></p><p>Project Manager, Senior</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1589477699</created>  <gmt_created>2020-05-14 17:34:59</gmt_created>  <changed>1589477972</changed>  <gmt_changed>2020-05-14 17:39:32</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Crane Staging on Sixth Street, south sidewalk closed temporarily.]]></teaser>  <type>news</type>  <sentence><![CDATA[Crane Staging on Sixth Street, south sidewalk closed temporarily.]]></sentence>  <summary><![CDATA[<p>Installation of a speaker system on the Roe Stamps Field video board requires a crane and will partially block Sixth Street and the south sidewalk.</p>]]></summary>  <dateline>2020-05-14T00:00:00-04:00</dateline>  <iso_dateline>2020-05-14T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-05-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Installation of speaker system ]]>  </subtitle>  <sidebar><![CDATA[<p>Crane Staging on Sixth Street May 18 - 22.</p>]]></sidebar>  <email><![CDATA[spencer.sheffield@aux.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Spencer Sheffield</p><p>Project Manager, Senior</p><p>spencer.sheffield@aux.gatech.edu</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>635385</item>      </media>  <hg_media>          <item>          <nid>635385</nid>          <type>image</type>          <title><![CDATA[Sixth Street crane staging May 18-22]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Traffic Plan sixth street may 2020.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Traffic%20Plan%20sixth%20street%20may%202020.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Traffic%20Plan%20sixth%20street%20may%202020.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Traffic%2520Plan%2520sixth%2520street%2520may%25202020.png?itok=5RKjBfic]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of crane staging on Sixth Street]]></image_alt>                    <created>1589476980</created>          <gmt_created>2020-05-14 17:23:00</gmt_created>          <changed>1589476980</changed>          <gmt_changed>2020-05-14 17:23:00</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="633584">  <title><![CDATA[Traffic Delays Around the Campus Center Construction]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Atlanta Gas Light&rsquo;s sub-contractor will begin&nbsp;work Friday, March 13, on&nbsp;the gas line installation to the Campus Center. As may be necessary, there will be&nbsp;police supervision for lane closures and traffic control. There is likely to be disruption in the corridor from Means Street to Regents Drive to the project site and along Ferst Drive as they extend service from adequately sized mains along&nbsp;Marietta Street.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1584046193</created>  <gmt_created>2020-03-12 20:49:53</gmt_created>  <changed>1584048039</changed>  <gmt_changed>2020-03-12 21:20:39</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Means Street, Tech Parkway, Regents Drive and Ferst Drive will experience traffic flow interruptions for the next several days.]]></teaser>  <type>news</type>  <sentence><![CDATA[Means Street, Tech Parkway, Regents Drive and Ferst Drive will experience traffic flow interruptions for the next several days.]]></sentence>  <summary><![CDATA[<p>Campus Center gas line installation will affect traffic flow on Means Street, Tech Parkway, Regents Drive and Ferst Drive for at least the next seven&nbsp;days.</p>]]></summary>  <dateline>2020-03-12T00:00:00-04:00</dateline>  <iso_dateline>2020-03-12T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-03-12 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Gas line installation to affect traffic flow near Campus Center.]]>  </subtitle>  <sidebar><![CDATA[<p>Gas line installation to affect traffic flow near Campus Center construction project.</p>]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>&nbsp;</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p><p><a href="mailto:nicolas.palfrey@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">nicolas.palfrey@facilities.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>633583</item>      </media>  <hg_media>          <item>          <nid>633583</nid>          <type>image</type>          <title><![CDATA[Gas line installation for Campus Center]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Gas line installation for Campus Center map.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Gas%20line%20installation%20for%20Campus%20Center%20map.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Gas%20line%20installation%20for%20Campus%20Center%20map.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Gas%2520line%2520installation%2520for%2520Campus%2520Center%2520map.png?itok=qVxynvZW]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of gas line road closures / rerouting for Campus Center]]></image_alt>                    <created>1584045408</created>          <gmt_created>2020-03-12 20:36:48</gmt_created>          <changed>1584045408</changed>          <gmt_changed>2020-03-12 20:36:48</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Student Center]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="633580">  <title><![CDATA[Campus Center Construction Activity -      Spring Break 3/14-3/22]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Contractors will take advantage of the reduction in student activity and circulation during spring break to carry out further investigative utility work.&nbsp; This work consists of hydrovaccing trenches to locate and confirm the location of utilities.&nbsp; The work is outlined in the attached diagrams and is located in&nbsp;the areas around the current student center and the historic Hemphill corridor.&nbsp; Work will begin Saturday, March&nbsp;14th and continue through to March&nbsp;22nd.</p><p>Work includes:</p><ul><li>Reopen, extend, and investigate deeper on the hydrovac cuts&nbsp;to find the 30&rdquo; water line adjacent to the Campanile. At some point, the waterline dives from 7 ft to 14 ft. We aim to find where this is with 2 points located.</li><li>Locate and camera 30&rdquo; sanitary and 36&rdquo; storm lines through the 2 inspection chambers on the North side and 2 inspection chambers on the South side of Stamps Commons.</li><li>Hydrovac a cross section of the walkway East of Ferst center. Civil plans show existing telecom, chilled water, storm, water, gas.</li><li>Hydrovac for possible water line South of Stamps Commons.</li><li>Hydrovac around new Fire Hydrant location along Ferst drive.</li></ul><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1584043623</created>  <gmt_created>2020-03-12 20:07:03</gmt_created>  <changed>1584045023</changed>  <gmt_changed>2020-03-12 20:30:23</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction continues on the Campus Center during spring break.]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction continues on the Campus Center during spring break.]]></sentence>  <summary><![CDATA[<p>Taking advantage of the reduction in student activity and circulation during spring break, work will continue on investigating underground&nbsp;utility locations near the student center.</p>]]></summary>  <dateline>2020-03-12T00:00:00-04:00</dateline>  <iso_dateline>2020-03-12T00:00:00-04:00</iso_dateline>  <gmt_dateline>2020-03-12 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Campus Center Construction Activity - Spring Break 3/14-3/22]]>  </subtitle>  <sidebar><![CDATA[<p>Construction activity continues during spring break focusing on hydrovac work for underground utilities.</p>]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>633582</item>          <item>633581</item>      </media>  <hg_media>          <item>          <nid>633582</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Activity - Spring Break 3/14-3/22]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Campanile Plaza Hydrovac - 20200311 (2)-2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Campanile%20Plaza%20Hydrovac%20-%2020200311%20%282%29-2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Campanile%20Plaza%20Hydrovac%20-%2020200311%20%282%29-2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Campanile%2520Plaza%2520Hydrovac%2520-%252020200311%2520%25282%2529-2.png?itok=zVdXr1eC]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of campus center construction activity spring break]]></image_alt>                    <created>1584043867</created>          <gmt_created>2020-03-12 20:11:07</gmt_created>          <changed>1584043867</changed>          <gmt_changed>2020-03-12 20:11:07</gmt_changed>      </item>          <item>          <nid>633581</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Activity - Spring Break 3/14-3/22]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Campanile Plaza Hydrovac - 20200311 (2)-1.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Campanile%20Plaza%20Hydrovac%20-%2020200311%20%282%29-1.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Campanile%20Plaza%20Hydrovac%20-%2020200311%20%282%29-1.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Campanile%2520Plaza%2520Hydrovac%2520-%252020200311%2520%25282%2529-1.png?itok=qz37InWN]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of campus center construction activity spring break]]></image_alt>                    <created>1584043771</created>          <gmt_created>2020-03-12 20:09:31</gmt_created>          <changed>1584043771</changed>          <gmt_changed>2020-03-12 20:09:31</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Student Center]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="633216">  <title><![CDATA[Campus Center Construction - March Updates]]></title>  <uid>27705</uid>  <body><![CDATA[<p>Exhibition Hall finishing work is in full swing. New pathways are being opened to facilitate better pedestrian thru-put.</p><p>The path from the Student Center Complex to the ISYE lawn will be reopened by March 10.</p><p>Fencing will be modified to open up pathway from Ferst Center to ISYE lawn by 3/15/2020.</p><p>A temporary sidewalk has been placed north of the fence to maintain access to the south doors at ISYE.</p><p>&nbsp;</p><p><strong>Hardscape and Interior Work (within the construction fence line)</strong></p><p>*Hardscapes including sidewalks and pavers will be installed.</p><p>*Interior finishes will begin at the Exhibition Hall.</p><p>*Ceiling, light fixtures and other interior finishes will begin this month at the Caf&eacute;.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>Jessica Rose</author>  <status>1</status>  <created>1583240902</created>  <gmt_created>2020-03-03 13:08:22</gmt_created>  <changed>1583429770</changed>  <gmt_changed>2020-03-05 17:36:10</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The path to the ISYE Annex will soon be reopened; hardscape is being placed. ]]></teaser>  <type>news</type>  <sentence><![CDATA[The path to the ISYE Annex will soon be reopened; hardscape is being placed. ]]></sentence>  <summary><![CDATA[<p>The path from the Student Center Complex to the ISYE lawn will be reopened by March 10. Exhibition Hall finishing work is in full swing.</p>]]></summary>  <dateline>2020-03-06T00:00:00-05:00</dateline>  <iso_dateline>2020-03-06T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-03-06 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p>Facilities Design &amp; Construction</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p><p>nicolas.palfrey@facilities.gatech.edu</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>632304</item>      </media>  <hg_media>          <item>          <nid>632304</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - Temporary walkway removed ]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - February March Hardscape (2).png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%20March%20Hardscape%20%282%29.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%20March%20Hardscape%20%282%29.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520February%2520March%2520Hardscape%2520%25282%2529.png?itok=Ew4OG5mP]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center logistics February - temporary walkway closed]]></image_alt>                    <created>1581439552</created>          <gmt_created>2020-02-11 16:45:52</gmt_created>          <changed>1581439552</changed>          <gmt_changed>2020-02-11 16:45:52</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Student Center]]></title>      </link>      </related>  <files>      </files>  <groups>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="632783">  <title><![CDATA[Crane Staging at Wood Lab / Machine Service Building on March 2]]></title>  <uid>35028</uid>  <body><![CDATA[<p>A crane will be staged at the Wood Lab/Machine Service&nbsp;Building on March 2 from 6m - 10am to replace the HVAC package unit on the building roof.&nbsp;&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1582235751</created>  <gmt_created>2020-02-20 21:55:51</gmt_created>  <changed>1582668538</changed>  <gmt_changed>2020-02-25 22:08:58</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[A crane will be staged at the Wood Lab Building on March 2 from 6m - 10am ]]></teaser>  <type>news</type>  <sentence><![CDATA[A crane will be staged at the Wood Lab Building on March 2 from 6m - 10am ]]></sentence>  <summary><![CDATA[<p>A crane will be staged at the Wood Lab&nbsp;Building on March 2 from 6m - 10am.</p>]]></summary>  <dateline>2020-02-20T00:00:00-05:00</dateline>  <iso_dateline>2020-02-20T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-02-20 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Crane Staging at Wood Lab Building March 2]]>  </subtitle>  <sidebar><![CDATA[<p>Crane Staging at Woodlab Building&nbsp;</p>]]></sidebar>  <email><![CDATA[federico.delrisco@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Federico Del Risco, PE, CEM, BOC1</p><p>Utilities Engineer 2</p><p>404-894-4749</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>632962</item>          <item>632961</item>      </media>  <hg_media>          <item>          <nid>632962</nid>          <type>image</type>          <title><![CDATA[Crane Staging at Woodlab Building March 2 - image 2]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Wood Lab crane 2.JPG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Wood%20Lab%20crane%202.JPG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Wood%20Lab%20crane%202.JPG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Wood%2520Lab%2520crane%25202.JPG?itok=gLkMUjhk]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of crane staging at Woodlab Bldg]]></image_alt>                    <created>1582668134</created>          <gmt_created>2020-02-25 22:02:14</gmt_created>          <changed>1582668134</changed>          <gmt_changed>2020-02-25 22:02:14</gmt_changed>      </item>          <item>          <nid>632961</nid>          <type>image</type>          <title><![CDATA[Crane Staging at Woodlab Building March 2]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Wood Lab crane.JPG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Wood%20Lab%20crane.JPG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Wood%20Lab%20crane.JPG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Wood%2520Lab%2520crane.JPG?itok=PUW65y7N]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of crane staging at Woodlab Bldg]]></image_alt>                    <created>1582668028</created>          <gmt_created>2020-02-25 22:00:28</gmt_created>          <changed>1582668063</changed>          <gmt_changed>2020-02-25 22:01:03</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="632317">  <title><![CDATA[Griffin Track Press Box and Grandstands to be leveled.  Plans for site reuse in design phase.]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Please see the attached safety and logistics plan for the Griffin Track Press Box and Grandstands demolition.&nbsp; The project duration will be from 2/17 &ndash; 3/13.&nbsp; Pedestrian walkways will not be impacted.&nbsp;If you have any questions or concerns please contact:</p><p>&nbsp;</p><p><strong>Mitchell Shelton</strong></p><p>Construction Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>470-351-7746</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1581445438</created>  <gmt_created>2020-02-11 18:23:58</gmt_created>  <changed>1582568937</changed>  <gmt_changed>2020-02-24 18:28:57</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The Griffin Track Press Box and Grandstands to be demolished in the coming weeks.  Plans for reuse of the site are in the design phase.]]></teaser>  <type>news</type>  <sentence><![CDATA[The Griffin Track Press Box and Grandstands to be demolished in the coming weeks.  Plans for reuse of the site are in the design phase.]]></sentence>  <summary><![CDATA[<p>The Griffin Track Press Box and Grandstands are&nbsp;slated for demolition this month.&nbsp; The plans for the site reuse are in the design phase.</p>]]></summary>  <dateline>2020-02-11T00:00:00-05:00</dateline>  <iso_dateline>2020-02-11T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-02-11 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>The Griffin Track Press Box and Grandstands is slated for demolition this month.</p>]]></sidebar>  <email><![CDATA[mshelton35@gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Mitchell Shelton</p><p>Construction Project Manager</p><p>Georgia Institute of Technology / Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>632311</item>      </media>  <hg_media>          <item>          <nid>632311</nid>          <type>image</type>          <title><![CDATA[Griffin Track Press Box and Grandstands to be demolished.  Plans for site reuse in design phase.]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTAA - Griffin Track - Pres Box demo - Logistic Plan.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTAA%20-%20Griffin%20Track%20-%20Pres%20Box%20demo%20-%20Logistic%20Plan.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTAA%20-%20Griffin%20Track%20-%20Pres%20Box%20demo%20-%20Logistic%20Plan.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTAA%2520-%2520Griffin%2520Track%2520-%2520Pres%2520Box%2520demo%2520-%2520Logistic%2520Plan.png?itok=v1QJjiVs]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Griffin Press Box planned demolition]]></image_alt>                    <created>1581443852</created>          <gmt_created>2020-02-11 17:57:32</gmt_created>          <changed>1581455801</changed>          <gmt_changed>2020-02-11 21:16:41</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="183916"><![CDATA[Griffin Track]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="632308">  <title><![CDATA[Campus Center Construction - Pedestrian walkways rerouted]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Beginning February 19, 2020, sidewalks from the Instructional Center to Student Services and Ferst Center will be temporary closed due to construction work.&nbsp; New hardscape sidewalks at the temporary bridge will be constructed.&nbsp; Through traffic will be permitted to Boggs and Laser Lab only.&nbsp; All other traffic will be directed along the North route shown.</p><p>In addition, the temporary walkway at Student Services and Ferst Center will be removed.&nbsp; No through pedestrian traffic will be permitted.&nbsp; All westbound traffic will be re- routed North and South as shown.</p><p>This work will begin February 19, 2020 and complete March 15, 2020.&nbsp; Once complete, all paths will be restored.</p><p>Should you have any questions, please contact:</p><p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1581440609</created>  <gmt_created>2020-02-11 17:03:29</gmt_created>  <changed>1581441312</changed>  <gmt_changed>2020-02-11 17:15:12</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The current temporary walkway from the Student Center Complex to the IsyE lawn will be closed.]]></teaser>  <type>news</type>  <sentence><![CDATA[The current temporary walkway from the Student Center Complex to the IsyE lawn will be closed.]]></sentence>  <summary><![CDATA[<p>The current temporary walkway from the Student Center Complex to the IsyE lawn will be closed. Pedestrians must now either go around the Ferst Center for the Arts to the north of the Boggs Chemistry building or to the south along Ferst Drive.</p>]]></summary>  <dateline>2020-02-11T00:00:00-05:00</dateline>  <iso_dateline>2020-02-11T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-02-11 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>The temporary walkway from the Student Center complex to the ISyE lawn will be closed as the construction team works to connect the new pathway to the existing paths.&nbsp; As the connection is being made, a longer diversion around the construction site will be necessary.&nbsp; The options are either&nbsp;around the Ferst Center for the Arts to the north of the Boggs Chemistry building or to the south along Ferst Drive.</p>]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p><p>nicolas.palfrey@facilities.gatech.edu</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>632304</item>      </media>  <hg_media>          <item>          <nid>632304</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - Temporary walkway removed ]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - February March Hardscape (2).png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%20March%20Hardscape%20%282%29.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%20March%20Hardscape%20%282%29.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520February%2520March%2520Hardscape%2520%25282%2529.png?itok=Ew4OG5mP]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center logistics February - temporary walkway closed]]></image_alt>                    <created>1581439552</created>          <gmt_created>2020-02-11 16:45:52</gmt_created>          <changed>1581439552</changed>          <gmt_changed>2020-02-11 16:45:52</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Student Center]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="631890">  <title><![CDATA[Van Leer IDC Elevator Out of Service 12/16/19-2/24/20]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Van Leer Elevator continues to be out-of-service until&nbsp;February 24, 2020 so that upgrades can be made.&nbsp; Thank you for your patience during this project.&nbsp; Should you have any questions, please contact</p><p><strong>Fenella Bryant</strong></p><p>Construction Project Manager</p><p><a href="mailto:fenella.bryant@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">fenella.bryant@facilities.gatech.edu</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1580400601</created>  <gmt_created>2020-01-30 16:10:01</gmt_created>  <changed>1580400601</changed>  <gmt_changed>2020-01-30 16:10:01</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.]]></teaser>  <type>news</type>  <sentence><![CDATA[Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.]]></sentence>  <summary><![CDATA[<p>Elevator upgrade in effect until 2/24/20 in the Van Leer Interdisciplinary Commons Building.</p>]]></summary>  <dateline>2020-01-30T00:00:00-05:00</dateline>  <iso_dateline>2020-01-30T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-01-30 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[fenella.bryant@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Fenella Bryant</strong></p><p>Construction Project Manager</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>629188</item>      </media>  <hg_media>          <item>          <nid>629188</nid>          <type>image</type>          <title><![CDATA[Van Leer Building stairs]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg?itok=U2697N_M]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[picture of steps in Van Leer Building]]></image_alt>                    <created>1574294690</created>          <gmt_created>2019-11-21 00:04:50</gmt_created>          <changed>1574294739</changed>          <gmt_changed>2019-11-21 00:05:39</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="125081"><![CDATA[Van Leer]]></keyword>          <keyword tid="174080"><![CDATA[Elevators]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="631888">  <title><![CDATA[Campus Center Construction Impacts - February 2020]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>General:</strong></p><p>*Construction truck traffic in this sector of campus.</p><p>*Normal working hours are Monday - Saturday 6:30 AM &ndash; 5:30 PM.</p><p><strong>Phase I Building Construction (within project fence line):</strong></p><p>*Masonry, windows, fiber and metal panels will be installed at Exhibition Hall.</p><p>*Major mechanical and electrical equipment will be set at the Exhibition Hall.</p><p>*Overhead and in-wall mechanical, electrical, plumbing inspections will be completed at the Exhibition Hall.</p><p>*Drywall and ceiling grid installation will commence at the Exhibition Hall.</p><p>*Masonry, windows, fiber and metal panels will be installed at the Pavilion buildings.<br />*Interior metal framing walls, overhead mechanical, electrical and plumbing will be completed at the Pavilion buildings.</p><p>*Windows, fiber cement and metal panels will be completed at the Caf&eacute; building.</p><p>* Drywall and ceiling grid installation will commence at the Caf&eacute; building.</p><p>*Underground domestic water and fire line service will be installed.</p><p>*Hardscapes including sidewalks and pavers will be installed.</p><p><strong>Phase I Utilities/ Ferst Center Plaza Pathway:</strong></p><p>*Hardscapes including sidewalks and pavers will be installed.</p><p>*Temporary pedestrian pathways approaching Ferst Center to ISYE lawn will be removed.</p><p>*Fencing will be modified to open up pathway from Ferst Center to ISYE lawn.</p><p>*Sidewalk closures affected by utilities work at Ferst Center pathways will be restored and opened 2/10/2020.</p><p><strong>Hardscape Work near ISYE Building:</strong></p><p>*A temporary sidewalk has been placed north of the fence to maintain access to the south doors at ISYE.</p><p>*The fencing configuration will be modified to open the new pathway on 2/10/2020.</p><p><strong>Old OIT Engineering Building &ndash; Temp WREK Radio:</strong></p><p>*Miscellaneous interior renovations including new walls, electrical, and HVAC work will be completed in early February</p><p>*Areas of the building&rsquo;s adjacent parking lot will be dedicated to Contractors and logistics.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1580400076</created>  <gmt_created>2020-01-30 16:01:16</gmt_created>  <changed>1580400076</changed>  <gmt_changed>2020-01-30 16:01:16</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction Impacts for Campus Center during the month of February 2020]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction Impacts for Campus Center during the month of February 2020]]></sentence>  <summary><![CDATA[<p>In the month of February 2020, Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project.&nbsp;</p>]]></summary>  <dateline>2020-01-30T00:00:00-05:00</dateline>  <iso_dateline>2020-01-30T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-01-30 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[The campus center construction continues through February 2020]]>  </subtitle>  <sidebar><![CDATA[<p>The campus center project will provide a comprehensive renovation of Georga Tech&#39;s Student Center complex.&nbsp; Four new buildings will create ample and effective space dedicated to social interaction, relaxation, creative expression adn support of our diverse community.</p>]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p><p>151 6th Street NW, Atlanta, GA 30332-0351&nbsp;<a href="http://facilities.gatech.edu/sites/default/files/documents/FacilitiesOKeefeLocationMap.pdf" rel="noopener noreferrer" target="_blank">MAP</a></p><p><a href="http://www.facilities.gatech.edu/" rel="noopener noreferrer" target="_blank">www.facilities.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>631884</item>          <item>631885</item>          <item>631886</item>      </media>  <hg_media>          <item>          <nid>631884</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Updates February 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - February 2020-1.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%202020-1.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%202020-1.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520February%25202020-1.png?itok=cE77wj_y]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics February 2020 - page 1]]></image_alt>                    <created>1580399458</created>          <gmt_created>2020-01-30 15:50:58</gmt_created>          <changed>1580399458</changed>          <gmt_changed>2020-01-30 15:50:58</gmt_changed>      </item>          <item>          <nid>631885</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - February 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - February 2020 page 2-2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%202020%20page%202-2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%202020%20page%202-2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520February%25202020%2520page%25202-2.png?itok=xT959QjG]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics February 2020 - page 2]]></image_alt>                    <created>1580399560</created>          <gmt_created>2020-01-30 15:52:40</gmt_created>          <changed>1580399560</changed>          <gmt_changed>2020-01-30 15:52:40</gmt_changed>      </item>          <item>          <nid>631886</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - February 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - February 2020 (page 3-3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%202020%20%28page%203-3.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20February%202020%20%28page%203-3.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520February%25202020%2520%2528page%25203-3.png?itok=BiO_glUp]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics February 2020 - page 3]]></image_alt>                    <created>1580399665</created>          <gmt_created>2020-01-30 15:54:25</gmt_created>          <changed>1580399665</changed>          <gmt_changed>2020-01-30 15:54:25</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Student Center]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="631090">  <title><![CDATA[Site work ongoing for Portman Sculpture installation]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Site preparations and the&nbsp;construction of the granite base for the Portman sculpture continues.&nbsp; Fencing and erosion control measures are in&nbsp;place, as well as notifications&nbsp;of impacted walkways. The actual sculpture is planned for installation in late January/early February.&nbsp; Food trucks will need to relocate on the day that the&nbsp;crane will place&nbsp;the sculpture.&nbsp; Notification of the crane staging will occur a few days prior to installation.&nbsp;&nbsp;</p><p>If you have any questions or concerns please contact jerry.young@facilities.gatech.edu.</p><p>&nbsp;</p><p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1579038047</created>  <gmt_created>2020-01-14 21:40:47</gmt_created>  <changed>1579038181</changed>  <gmt_changed>2020-01-14 21:43:01</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction of the base and associated site work for the Portman sculpture continues..]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction of the base and associated site work for the Portman sculpture continues..]]></sentence>  <summary><![CDATA[<p>Site work and construction of the base continues&nbsp;for the Portman Sculpture.</p>]]></summary>  <dateline>2020-01-14T00:00:00-05:00</dateline>  <iso_dateline>2020-01-14T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-01-14 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jeremiah Young</p><p>Landscape Project Manager</p><p>Georgia Institute of Technology | Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>628438</item>      </media>  <hg_media>          <item>          <nid>628438</nid>          <type>image</type>          <title><![CDATA[Portman Sculpture site  map]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Portman Sculpture Site and circulation.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Portman%20Sculpture%20Site%20and%20circulation.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Portman%20Sculpture%20Site%20and%20circulation.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Portman%2520Sculpture%2520Site%2520and%2520circulation.png?itok=rdAaHxsN]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Portman sculpture installation site]]></image_alt>                    <created>1572545994</created>          <gmt_created>2019-10-31 18:19:54</gmt_created>          <changed>1572545994</changed>          <gmt_changed>2019-10-31 18:19:54</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="5884"><![CDATA[john portman]]></keyword>          <keyword tid="171274"><![CDATA[sculptures]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="630385">  <title><![CDATA[Campus Center Construction Logistics - January 2020]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>Campus Center &ndash; Construction Impacts</strong></p><p><strong>January 2020:</strong></p><p>In the month of January 2020, Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project.&nbsp;</p><p><strong>General:</strong></p><p>*Construction truck traffic in this sector of campus.</p><p>*Normal working hours are Monday - Saturday 6:30 AM &ndash; 5:30 PM.</p><p><strong>Phase I Building Construction (within project fence line):</strong></p><p>*Masonry, windows, fiber and metal panels will be installed at Exhibition Hall.</p><p>*Overhead mechanical, electrical, and plumbing systems at the Exhibition Hall installation will be completed.&nbsp;</p><p>*In- wall electrical and plumbing systems at the Exhibition Hall installation will be completed.</p><p>*Major mechanical and electrical equipment will be set at the Exhibition Hall.</p><p>*Exterior metal framing walls, sheathing and waterproofing will be installed at the Pavilion buildings.</p><p>*Interior metal framing walls, overhead mechanical, electrical and plumbing will be installed at the Pavilion buildings.</p><p>*Sheathing, waterproofing and masonry will be installed at the Caf&eacute; building.</p><p>*Overhead mechanical, electrical, and plumbing systems will be installed at the Caf&eacute; building.</p><p>*Underground domestic water and fire line service will be installed.</p><p><strong>Phase I Utilities/ Ferst Center Plaza Pathway:</strong></p><p>*Storm, sanitary sewer, and power ductbank will be completed for Phase 1.</p><p>*Fencing will be modified between the Ferst Center and Smithgall buildings on 01/17/20.</p><p>*The north facing east exit of Smithgall will be reopened.</p><p>*Signage will remain in place around perimeter of fencing to direct pedestrian traffic.&nbsp;</p><p>*Pedestrian pathways approaching Ferst Center from ISYE lawn have been installed to divert walkways around construction.</p><p>*Way finding signage has been placed around this part of campus to provide alternate routes.</p><p>*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.</p><p><strong>Hardscape Work near ISYE Building:</strong></p><p>*The fencing located between the bus loop at Ferst Dr and ISYE building will be modified to now encompass the existing sidewalk.</p><p>*A temporary sidewalk will be placed north of the fence to maintain access to the south doors at ISYE.</p><p>*The existing sidewalk will be removed and a new pathway will be included.</p><p>*The fencing configuration will be reconfigured to open the new pathway on 01/31/20.</p><p><strong>Old OIT Engineering Building &ndash; Temp WREK Radio:</strong></p><p>*Miscellaneous interior renovations including new walls, electrical, and HVAC work will occur during the month January.</p><p>*Areas of the building&rsquo;s adjacent parking lot will be dedicated to Contractors and logistics.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1577979531</created>  <gmt_created>2020-01-02 15:38:51</gmt_created>  <changed>1577980071</changed>  <gmt_changed>2020-01-02 15:47:51</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction Impacts for Campus Center during the month of January 2020.]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction Impacts for Campus Center during the month of January 2020.]]></sentence>  <summary><![CDATA[<p>Construction activities relating to the campus center renovation will continue&nbsp;for the month of January 2020.&nbsp; Work on the buildings is progressing well.</p>]]></summary>  <dateline>2020-01-02T00:00:00-05:00</dateline>  <iso_dateline>2020-01-02T00:00:00-05:00</iso_dateline>  <gmt_dateline>2020-01-02 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p><p>151 6th Street NW, Atlanta, GA 30332-0351&nbsp;<a href="http://facilities.gatech.edu/sites/default/files/documents/FacilitiesOKeefeLocationMap.pdf" rel="noopener noreferrer" target="_blank">MAP</a></p><p><a href="http://www.facilities.gatech.edu/" rel="noopener noreferrer" target="_blank">www.facilities.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>630363</item>          <item>630364</item>          <item>630366</item>      </media>  <hg_media>          <item>          <nid>630363</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Logistics - January 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - January 2020 update Jan - Feb.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20Jan%20-%20Feb.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20Jan%20-%20Feb.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520January%25202020%2520update%2520Jan%2520-%2520Feb.png?itok=bFBVysUV]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics January 2020 - page 1]]></image_alt>                    <created>1577826723</created>          <gmt_created>2019-12-31 21:12:03</gmt_created>          <changed>1577826723</changed>          <gmt_changed>2019-12-31 21:12:03</gmt_changed>      </item>          <item>          <nid>630364</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Logistics - January 2020 page 2]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - January 2020 update page 2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20page%202.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20page%202.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520January%25202020%2520update%2520page%25202.png?itok=hdAifRTI]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics January 2020 - page 2 of 3]]></image_alt>                    <created>1577826830</created>          <gmt_created>2019-12-31 21:13:50</gmt_created>          <changed>1577826830</changed>          <gmt_changed>2019-12-31 21:13:50</gmt_changed>      </item>          <item>          <nid>630366</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Logistics - January 2020 page 3]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - January 2020 update page 3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20page%203.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20page%203.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520January%25202020%2520update%2520page%25203.png?itok=vyt1BACL]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics January 2020 - page 3 of 3]]></image_alt>                    <created>1577827007</created>          <gmt_created>2019-12-31 21:16:47</gmt_created>          <changed>1577827007</changed>          <gmt_changed>2019-12-31 21:16:47</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Student Center]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>          <keyword tid="183391"><![CDATA[campus center construcation]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="630371">  <title><![CDATA[Van Leer IDC Elevator Out of Service 12/16/19-2/24/20]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Van Leer Elevator will be out-of-service from&nbsp;December 16, 2019 to February 24, 2020 so upgrades can be made.&nbsp; Thank you for your patience during this project.&nbsp; Should you have any questions, please contact</p><p><strong>Fenella Bryant</strong></p><p>Construction Project Manager</p><p><a href="mailto:fenella.bryant@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">fenella.bryant@facilities.gatech.edu</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1577830590</created>  <gmt_created>2019-12-31 22:16:30</gmt_created>  <changed>1577830590</changed>  <gmt_changed>2019-12-31 22:16:30</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.]]></teaser>  <type>news</type>  <sentence><![CDATA[Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.]]></sentence>  <summary><![CDATA[<p>Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.</p>]]></summary>  <dateline>2019-12-31T00:00:00-05:00</dateline>  <iso_dateline>2019-12-31T00:00:00-05:00</iso_dateline>  <gmt_dateline>2019-12-31 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[fenella.bryant@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Fenella Bryant</strong></p><p>Construction Project Manager</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>629188</item>      </media>  <hg_media>          <item>          <nid>629188</nid>          <type>image</type>          <title><![CDATA[Van Leer Building stairs]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg?itok=U2697N_M]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[picture of steps in Van Leer Building]]></image_alt>                    <created>1574294690</created>          <gmt_created>2019-11-21 00:04:50</gmt_created>          <changed>1574294739</changed>          <gmt_changed>2019-11-21 00:05:39</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="125081"><![CDATA[Van Leer]]></keyword>          <keyword tid="174080"><![CDATA[Elevators]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="630369">  <title><![CDATA[Russ Chandler Stadium Light bulbs replaced 1/9/20]]></title>  <uid>35028</uid>  <body><![CDATA[<p>&nbsp;On Thursday, January 9<sup>th</sup>, an outside vendor&nbsp;will be on site to replace 8 bad bulbs on the stadium lights at Russ Chandler Stadium.&nbsp; The sidewalk that runs along the South end of the stadium between Fowler &amp; Cherry Street will be blocked by a lift for a period of time&nbsp;likely in the late morning/early afternoon hours.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1577828993</created>  <gmt_created>2019-12-31 21:49:53</gmt_created>  <changed>1577829181</changed>  <gmt_changed>2019-12-31 21:53:01</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[ A lift will be placed on the sidewalk that runs along the South end of the Stadium between Fowler & Cherry street]]></teaser>  <type>news</type>  <sentence><![CDATA[ A lift will be placed on the sidewalk that runs along the South end of the Stadium between Fowler & Cherry street]]></sentence>  <summary><![CDATA[<p>On Thursday, 1/9/20 the sidewalk that runs along the South end of the Stadium between Fowler &amp; Cherry Street will be blocked by a lift in order to replace stadium light bulbs.</p>]]></summary>  <dateline>2019-12-31T00:00:00-05:00</dateline>  <iso_dateline>2019-12-31T00:00:00-05:00</iso_dateline>  <gmt_dateline>2019-12-31 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jkenyon@athletics.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jim Kenyon</p><p>Assoc. Dir. of Facilities, Operations &amp; Events</p><p>Georgia Tech Athletic Association</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>630368</item>      </media>  <hg_media>          <item>          <nid>630368</nid>          <type>image</type>          <title><![CDATA[Russ Chandler Stadium Light bulbs replaced]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Russ Chandler Stadium image.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Russ%20Chandler%20Stadium%20image.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Russ%20Chandler%20Stadium%20image.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Russ%2520Chandler%2520Stadium%2520image.jpg?itok=Hj3_mJGb]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[image of Russ Chandler Stadium]]></image_alt>                    <created>1577828372</created>          <gmt_created>2019-12-31 21:39:32</gmt_created>          <changed>1577828372</changed>          <gmt_changed>2019-12-31 21:39:32</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="29371"><![CDATA[russ chandler stadium]]></keyword>          <keyword tid="183388"><![CDATA[stadium lights replaced]]></keyword>          <keyword tid="183387"><![CDATA[baseball stadium lights]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="630367">  <title><![CDATA[Campus Center Construction Impacts - January 2020]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>Campus Center &ndash; Construction Impacts</strong></p><p><strong>January 2020:</strong></p><p>In the month of January 2020, Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project.&nbsp;</p><p><strong>General:</strong></p><p>*Construction truck traffic in this sector of campus.</p><p>*Normal working hours are Monday - Saturday 6:30 AM &ndash; 5:30 PM.</p><p><strong>Phase I Building Construction (within project fence line):</strong></p><p>*Masonry, windows, fiber and metal panels will be installed at Exhibition Hall.</p><p>*Overhead mechanical, electrical, and plumbing systems at the Exhibition Hall installation will be completed.&nbsp;</p><p>*In- wall electrical and plumbing systems at the Exhibition Hall installation will be completed.</p><p>*Major mechanical and electrical equipment will be set at the Exhibition Hall.</p><p>*Exterior metal framing walls, sheathing and waterproofing will be installed at the Pavilion buildings.</p><p>*Interior metal framing walls, overhead mechanical, electrical and plumbing will be installed at the Pavilion buildings.</p><p>*Sheathing, waterproofing and masonry will be installed at the Caf&eacute; building.</p><p>*Overhead mechanical, electrical, and plumbing systems will be installed at the Caf&eacute; building.</p><p>*Underground domestic water and fire line service will be installed.</p><p><strong>Phase I Utilities/ Ferst Center Plaza Pathway:</strong></p><p>*Storm, sanitary sewer, and power ductbank will be completed for Phase 1.</p><p>*Fencing will be modified between the Ferst Center and Smithgall buildings on 01/17/20.</p><p>*The north facing east exit of Smithgall will be reopened.</p><p>*Signage will remain in place around perimeter of fencing to direct pedestrian traffic.&nbsp;</p><p>*Pedestrian pathways approaching Ferst Center from ISYE lawn have been installed to divert walkways around construction.</p><p>*Way finding signage has been placed around this part of campus to provide alternate routes.</p><p>*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.</p><p><strong>Hardscape Work near ISYE Building:</strong></p><p>*The fencing located between the bus loop at Ferst Dr and ISYE building will be modified to now encompass the existing sidewalk.</p><p>*A temporary sidewalk will be placed north of the fence to maintain access to the south doors at ISYE.</p><p>*The existing sidewalk will be removed and a new pathway will be included.</p><p>*The fencing configuration will be reconfigured to open the new pathway on 01/31/20.</p><p><strong>Old OIT Engineering Building &ndash; Temp WREK Radio:</strong></p><p>*Miscellaneous interior renovations including new walls, electrical, and HVAC work will occur during the month January.</p><p>*Areas of the building&rsquo;s adjacent parking lot will be dedicated to Contractors and logistics.</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1577827544</created>  <gmt_created>2019-12-31 21:25:44</gmt_created>  <changed>1577827544</changed>  <gmt_changed>2019-12-31 21:25:44</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction Impacts for Campus Center during the month of January 2020.]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction Impacts for Campus Center during the month of January 2020.]]></sentence>  <summary><![CDATA[<p>Construction activities relating to the campus center renovation will continue&nbsp;for the month of January 2020.&nbsp; Work on the buildings is progressing well.</p>]]></summary>  <dateline>2019-12-31T00:00:00-05:00</dateline>  <iso_dateline>2019-12-31T00:00:00-05:00</iso_dateline>  <gmt_dateline>2019-12-31 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p><p>151 6th Street NW, Atlanta, GA 30332-0351&nbsp;<a href="http://facilities.gatech.edu/sites/default/files/documents/FacilitiesOKeefeLocationMap.pdf" rel="noopener noreferrer" target="_blank">MAP</a></p><p><a href="http://www.facilities.gatech.edu/" rel="noopener noreferrer" target="_blank">www.facilities.gatech.edu</a></p><p>&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>630363</item>          <item>630364</item>          <item>630366</item>      </media>  <hg_media>          <item>          <nid>630363</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Logistics - January 2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - January 2020 update Jan - Feb.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20Jan%20-%20Feb.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20Jan%20-%20Feb.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520January%25202020%2520update%2520Jan%2520-%2520Feb.png?itok=bFBVysUV]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics January 2020 - page 1]]></image_alt>                    <created>1577826723</created>          <gmt_created>2019-12-31 21:12:03</gmt_created>          <changed>1577826723</changed>          <gmt_changed>2019-12-31 21:12:03</gmt_changed>      </item>          <item>          <nid>630364</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Logistics - January 2020 page 2]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - January 2020 update page 2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20page%202.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20page%202.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520January%25202020%2520update%2520page%25202.png?itok=hdAifRTI]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics January 2020 - page 2 of 3]]></image_alt>                    <created>1577826830</created>          <gmt_created>2019-12-31 21:13:50</gmt_created>          <changed>1577826830</changed>          <gmt_changed>2019-12-31 21:13:50</gmt_changed>      </item>          <item>          <nid>630366</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Logistics - January 2020 page 3]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan - January 2020 update page 3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20page%203.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20-%20January%202020%20update%20page%203.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520-%2520January%25202020%2520update%2520page%25203.png?itok=vyt1BACL]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics January 2020 - page 3 of 3]]></image_alt>                    <created>1577827007</created>          <gmt_created>2019-12-31 21:16:47</gmt_created>          <changed>1577827007</changed>          <gmt_changed>2019-12-31 21:16:47</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="628447">  <title><![CDATA[Site work begins for Portman Sculpture installation]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Site preparations and the&nbsp;construction of the granite base for the Portman sculpture is underway.&nbsp; Fencing and erosion control measures will be installed this week, as well as notifications&nbsp;of impacted walkways. The actual sculpture is planned for installation in late January.&nbsp; Food trucks will need to relocate on the day that the&nbsp;crane will place&nbsp;the sculpture.&nbsp; Notification of the crane staging will occur a few days prior to installation.&nbsp;&nbsp;</p><p>If you have any questions or concerns please contact jerry.young@facilities.gatech.edu.</p><p>&nbsp;</p><p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1572547818</created>  <gmt_created>2019-10-31 18:50:18</gmt_created>  <changed>1576791638</changed>  <gmt_changed>2019-12-19 21:40:38</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction of the base and associated site work for the Portman sculpture begins.]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction of the base and associated site work for the Portman sculpture begins.]]></sentence>  <summary><![CDATA[<p>Site work and construction of the base begins for the Portman Sculpture.</p>]]></summary>  <dateline>2019-10-31T00:00:00-04:00</dateline>  <iso_dateline>2019-10-31T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-10-31 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>628438</item>      </media>  <hg_media>          <item>          <nid>628438</nid>          <type>image</type>          <title><![CDATA[Portman Sculpture site  map]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Portman Sculpture Site and circulation.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Portman%20Sculpture%20Site%20and%20circulation.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Portman%20Sculpture%20Site%20and%20circulation.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Portman%2520Sculpture%2520Site%2520and%2520circulation.png?itok=rdAaHxsN]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Portman sculpture installation site]]></image_alt>                    <created>1572545994</created>          <gmt_created>2019-10-31 18:19:54</gmt_created>          <changed>1572545994</changed>          <gmt_changed>2019-10-31 18:19:54</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="42891"><![CDATA[Georgia Tech Arts]]></category>      </categories>  <news_terms>          <term tid="42891"><![CDATA[Georgia Tech Arts]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="75831"><![CDATA[arts @ tech]]></keyword>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>          <keyword tid="167824"><![CDATA[sculpture]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="629187">  <title><![CDATA[Van Leer IDC Elevator Out of Service 12/16/19-2/24/20]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Van Leer Elevator will be out-of-service from&nbsp;December 16, 2019 to February 24, 2020 so upgrades can be made.&nbsp; Thank you for your patience during this project.&nbsp; Should you have any questions, please contact</p><p><strong>Fenella Bryant</strong></p><p>Construction Project Manager</p><p><a href="mailto:fenella.bryant@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">fenella.bryant@facilities.gatech.edu</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1574292351</created>  <gmt_created>2019-11-20 23:25:51</gmt_created>  <changed>1576791290</changed>  <gmt_changed>2019-12-19 21:34:50</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.]]></teaser>  <type>news</type>  <sentence><![CDATA[Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.]]></sentence>  <summary><![CDATA[<p>Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.</p>]]></summary>  <dateline>2019-11-20T00:00:00-05:00</dateline>  <iso_dateline>2019-11-20T00:00:00-05:00</iso_dateline>  <gmt_dateline>2019-11-20 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[fenella.bryant@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Fenella Bryant</strong></p><p>Construction Project Manager</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>629188</item>      </media>  <hg_media>          <item>          <nid>629188</nid>          <type>image</type>          <title><![CDATA[Van Leer Building stairs]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GeorgiaTechIDC_PhotoByBruceDamonte_04.jpg?itok=U2697N_M]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[picture of steps in Van Leer Building]]></image_alt>                    <created>1574294690</created>          <gmt_created>2019-11-21 00:04:50</gmt_created>          <changed>1574294739</changed>          <gmt_changed>2019-11-21 00:05:39</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="174080"><![CDATA[Elevators]]></keyword>          <keyword tid="125081"><![CDATA[Van Leer]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="629926">  <title><![CDATA[Williams Street Road Closure in Tech Square 12/10/19 - 12/12/19]]></title>  <uid>27705</uid>  <body><![CDATA[<p>Williams Street will be closed between December 10 and 12, alongside of the Global Learning Center between Fifth Street and Fourth Street. The purpose of the closure is to enable large equipment to be placed to support the micro-grid project.</p><p>This closure is led by Georgia Power and is not under the control of Georgia Tech&#39;s Design &amp; Construction Department. This is a courtesy notice.</p>]]></body>  <author>Jessica Rose</author>  <status>1</status>  <created>1576082412</created>  <gmt_created>2019-12-11 16:40:12</gmt_created>  <changed>1576157497</changed>  <gmt_changed>2019-12-12 13:31:37</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Williams Street road closure in Tech Square will enable equipment placement for microgrid. ]]></teaser>  <type>news</type>  <sentence><![CDATA[Williams Street road closure in Tech Square will enable equipment placement for microgrid. ]]></sentence>  <summary><![CDATA[<p>Williams Street road closure in Tech Square will enable equipment placement for microgrid. This is not a Georgia Tech run initiative.</p>]]></summary>  <dateline>2019-11-20T00:00:00-05:00</dateline>  <iso_dateline>2019-11-20T00:00:00-05:00</iso_dateline>  <gmt_dateline>2019-11-20 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jrose@gatech.edu ]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jessica Rose</strong></p><p>Facilities: Communications &amp; Analytics</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="14603"><![CDATA[Georgia Tech Global Learning &amp; Conference Center]]></keyword>          <keyword tid="12620"><![CDATA[glc]]></keyword>          <keyword tid="56661"><![CDATA[georgia power]]></keyword>          <keyword tid="170580"><![CDATA[microgrid]]></keyword>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="629257">  <title><![CDATA[Buildout of the Eco-Commons Completes the Northwest Sector ]]></title>  <uid>0</uid>  <body><![CDATA[<p>The northwest sector of campus has been a continuous hub of activity with the construction of the new Georgia Tech Police Department Building, the&nbsp;Dalney&nbsp;Building, and the&nbsp;Kendeda&nbsp;Building for Innovative Sustainable Design &mdash; all of which opened their doors in the past few months.&nbsp;The next highly anticipated project in this area is the&nbsp;renewal of&nbsp;8 acres&nbsp;of land&nbsp;located&nbsp;at&nbsp;the corner of Hemphill Avenue and Ferst Drive, which will extend and enhance the campus Eco-Commons.</p><p>A lush green space&nbsp;will soon&nbsp;emerge&nbsp;from&nbsp;what was formerly the&nbsp;Beringause&nbsp;Building and two surface parking lots.&nbsp;This renewal project will be purposely located due west of The&nbsp;Kendeda&nbsp;Building and will complement the regenerative&nbsp;principles of the Living Building Challenge.</p><p>Georgia Tech&rsquo;s overall Eco-Commons project envisions 80 acres of green spaces throughout campus that&nbsp;follow what were the original,&nbsp;naturally occurring stream paths of this region&nbsp;before urbanization.&nbsp;These revitalized green spaces are being designed and engineered&nbsp;to reduce&nbsp;stormwater&nbsp;runoff by 50%, while also supporting increased living learning labs&nbsp;and biodiversity on campus.&nbsp;&nbsp;&nbsp;</p><p>This particular section will mimic a traditional piedmont woodland&nbsp;that was located on campus before the city grew up&nbsp;around it.&nbsp;Currently, the majority of acreage is covered by&nbsp;oak, pine,&nbsp;and hickory trees along with crepe myrtles and redbuds.&nbsp;The trees have been surveyed and range from specimen trees (those with high historic or ecological value), to trees in fair or poor condition.</p><p>According to Jason Gregory, senior planner in Capital Planning and Space Management, more than 60 trees will be&nbsp;temporarily relocated to the tree farm by the Roger A. and Helen B. Krone Engineered Biosystems Building while significant grading of the space is completed.</p><p>&ldquo;It&rsquo;s pretty neat that we have the ability to relocate these trees on campus while this project moves forward,&rdquo;&nbsp;explained Gregory.&nbsp;&nbsp;&nbsp;</p><p>But before planting can begin at the site, extensive amendments such as compost and biochar will be added&nbsp;to the soil.&nbsp;Installation of&nbsp;utilities,&nbsp;water&nbsp;infiltration cells, and drainage infrastructure will also take place before&nbsp;any&nbsp;planting can begin.&nbsp;</p><p>After the site is prepared, more than 600 new trees will be planted in addition to the relocated trees. This increased tree canopy will support a display of perennials such as flowering dogwood, yellow daisies, and ferns.&nbsp;This recreated piedmont woodland will feature a grove of tupelo trees, a prairie-like area of grasses, a manicured lawn,&nbsp;a&nbsp;granite&nbsp;outcropping,&nbsp;and seepage wetlands. It is expected that by&nbsp;mid-year&nbsp;2020, students, faculty, and&nbsp;staff&nbsp;will be able to&nbsp;meander the walkways and bridges&nbsp;and enjoy&nbsp;the natural beauty of this revitalized sector of&nbsp;campus.&nbsp;</p><p>The creation of this performance landscape helps demonstrate Georgia Tech&rsquo;s thoughtful stewardship&nbsp;of land development&nbsp;by&nbsp;including&nbsp;smart infrastructure to facilitate a balanced flow of&nbsp;stormwater. In addition, this naturalized&nbsp;ecological and educational&nbsp;environment supports Georgia Tech&rsquo;s commitment to fostering sustainability initiatives well into the 21st&nbsp;century.&nbsp;&nbsp;&nbsp;</p><p>To learn more about this&nbsp;distinctive&nbsp;campus initiative, stay tuned for the next article in&nbsp;a three-part series.</p>]]></body>  <author></author>  <status>1</status>  <created>1574437899</created>  <gmt_created>2019-11-22 15:51:39</gmt_created>  <changed>1575990429</changed>  <gmt_changed>2019-12-10 15:07:09</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[A lush green space will soon emerge from what was formerly the Beringhause Building and two surface parking lots.]]></teaser>  <type>news</type>  <sentence><![CDATA[A lush green space will soon emerge from what was formerly the Beringhause Building and two surface parking lots.]]></sentence>  <summary><![CDATA[<p>A lush green space&nbsp;will soon&nbsp;emerge&nbsp;from&nbsp;what was formerly the&nbsp;Beringhause&nbsp;Building and two surface parking lots.&nbsp;This renewal project will be purposely located due west of The&nbsp;Kendeda&nbsp;Building and will complement the regenerative&nbsp;principles of the Living Building Challenge.</p>]]></summary>  <dateline>2019-11-22T00:00:00-05:00</dateline>  <iso_dateline>2019-11-22T00:00:00-05:00</iso_dateline>  <gmt_dateline>2019-11-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>The&nbsp;organized&nbsp;programming of this area will consist of three living landscape areas: an area to&nbsp;learn, an area to&nbsp;engage, and an area to&nbsp;reflect.</p>]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:cathy.brim@facilities.gatech.edu">Cathy Brim</a><br />Communications<br />Facilities Management</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>629254</item>          <item>629255</item>          <item>629256</item>      </media>  <hg_media>          <item>          <nid>629254</nid>          <type>image</type>          <title><![CDATA[Northwest Sector of the Eco-Commons]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Eco Commons NW Sector .png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Eco%20Commons%20NW%20Sector%20.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Eco%20Commons%20NW%20Sector%20.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Eco%2520Commons%2520NW%2520Sector%2520.png?itok=kl1HGQ6I]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Northwest sector of the eco-commons]]></image_alt>                    <created>1574436898</created>          <gmt_created>2019-11-22 15:34:58</gmt_created>          <changed>1574436898</changed>          <gmt_changed>2019-11-22 15:34:58</gmt_changed>      </item>          <item>          <nid>629255</nid>          <type>image</type>          <title><![CDATA[Eco-Commons View from Ferst Drive and Hemphill Avenue ]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Eco Commons view from Ferst and Hemphill.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Eco%20Commons%20view%20from%20Ferst%20and%20Hemphill.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Eco%20Commons%20view%20from%20Ferst%20and%20Hemphill.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Eco%2520Commons%2520view%2520from%2520Ferst%2520and%2520Hemphill.png?itok=ujYLGEC0]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[View of the Eco-Commons from Ferst Drive and Hemphill Avenue]]></image_alt>                    <created>1574437020</created>          <gmt_created>2019-11-22 15:37:00</gmt_created>          <changed>1574437020</changed>          <gmt_changed>2019-11-22 15:37:00</gmt_changed>      </item>          <item>          <nid>629256</nid>          <type>image</type>          <title><![CDATA[Eco-Commons View from the Grove]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Eco Commons  View in Grove.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Eco%20Commons%20%20View%20in%20Grove.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Eco%20Commons%20%20View%20in%20Grove.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Eco%2520Commons%2520%2520View%2520in%2520Grove.png?itok=Ic9k7e4R]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[Eco-Commons View from the Grove]]></image_alt>                    <created>1574437159</created>          <gmt_created>2019-11-22 15:39:19</gmt_created>          <changed>1574437159</changed>          <gmt_changed>2019-11-22 15:39:19</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://space.gatech.edu/landscape-master-plan]]></url>        <title><![CDATA[Landscape Master Plan]]></title>      </link>          <link>        <url><![CDATA[http://www.facilities.gatech.edu/landscaping]]></url>        <title><![CDATA[Facilities Management Landscape Services]]></title>      </link>          <link>        <url><![CDATA[http://livingbuilding.gatech.edu/]]></url>        <title><![CDATA[The Kendeda Building for Innovative Sustainable Design]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="64319"><![CDATA[Administration and Finance]]></group>          <group id="594724"><![CDATA[Office of Sustainability]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>      </categories>  <news_terms>      </news_terms>  <keywords>          <keyword tid="147851"><![CDATA[eco-commons]]></keyword>          <keyword tid="166867"><![CDATA[living Building]]></keyword>          <keyword tid="177739"><![CDATA[Kendeda Building]]></keyword>          <keyword tid="112"><![CDATA[green space]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="629432">  <title><![CDATA[Campus Center Construction Update - December 2019]]></title>  <uid>35028</uid>  <body><![CDATA[<p>In the month of December 2019, Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project.&nbsp;</p><p><strong>General:</strong></p><p>*Construction truck traffic in this sector of campus.</p><p>*Normal working hours 6:30 AM &ndash; 5:30 PM.</p><p><strong>Phase I Building Construction (within project fence line):</strong></p><p>*Pre- Engineered Metal Buildings and roofing for Pavilion buildings will be erected.</p><p>*Exterior metal framing, sheathing, and waterproofing at Caf&eacute; building will be installed.</p><p>*Waterproofing, flashing, masonry and windows will be installed at Exhibition Hall.</p><p>*Overhead mechanical, electrical, and plumbing systems at the Exhibition Hall installation will continue.</p><p>*In- wall electrical and plumbing systems at the Exhibition Hall installation will continue.</p><p>*Underground domestic water and fire line service will be installed.</p><p><strong>Phase I Utilities:</strong></p><p>*Storm, sanitary sewer, and power ductbank will be installed north of the Student Center Parking Garage 9/6/2019 &ndash; 12/20/2019.</p><p>*Fencing will remain in place to provide barriers between construction activities and the campus.</p><p>*Signage will remain in placed around perimeter of fencing to direct pedestrian traffic.&nbsp;</p><p>*Pedestrian pathways approaching Ferst Center from ISYE lawn have been installed to divert walkways around construction.</p><p>*Way finding signage has been placed around this part of campus to provide alternate routes.</p><p>*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.</p><p><strong>Phase II Existing Utilities Site Investigation:</strong></p><p><strong>&nbsp;</strong>*At the Campanile Plaza area, site investigations to verify and confirm locations of existing underground utilities will be performed.</p><p>*Temp barricades and signage will be placed around work perimeter to direct pedestrian traffic.</p><p>*Small localized excavations using a hydrovac truck will be mobilized.</p><p>*The hydrovac truck will access the work area from the W21 parking lot.&nbsp; Subsequently, 3 parking spaces in the extreme south end will be closed for staging.</p><p>*Small areas will be cut into the turf and landscape areas.&nbsp; These areas will be backfilled and patched once investigations are complete.</p><p>*Site logistics plan is attached.</p><p><strong>Old OIT Engineering Building &ndash; Temp WREK Radio:</strong></p><p>*Miscellaneous interior renovations including new walls, electrical, and HVAC work will occur during the months of December and January.</p><p>*Areas of the building&rsquo;s adjacent parking lot will be dedicated to Contractors and logistics.</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1574821110</created>  <gmt_created>2019-11-27 02:18:30</gmt_created>  <changed>1574821303</changed>  <gmt_changed>2019-11-27 02:21:43</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction Impacts for Campus Center during the month December 2019]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction Impacts for Campus Center during the month December 2019]]></sentence>  <summary><![CDATA[<p>Campus Center construction continues through the month of December.</p>]]></summary>  <dateline>2019-11-26T00:00:00-05:00</dateline>  <iso_dateline>2019-11-26T00:00:00-05:00</iso_dateline>  <gmt_dateline>2019-11-26 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>The&nbsp;<strong>Campus Center Project</strong>&nbsp;will renovate portions of the existing Student Center and expand services into four new buildings across a 15-acre site to create program spaces necessary for the&nbsp;growing campus.</p>]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>For further information regarding this project contact:</p><p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>470-363-7520</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>629431</item>          <item>629430</item>          <item>628314</item>          <item>628313</item>          <item>628311</item>      </media>  <hg_media>          <item>          <nid>629431</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - December 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Campanile Plaza Hydrovac - 20191125v2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Campanile%20Plaza%20Hydrovac%20-%2020191125v2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Campanile%20Plaza%20Hydrovac%20-%2020191125v2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Campanile%2520Plaza%2520Hydrovac%2520-%252020191125v2.png?itok=NYiwrKK7]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[aerial view of campus center construction campinile hydrovac]]></image_alt>                    <created>1574820009</created>          <gmt_created>2019-11-27 02:00:09</gmt_created>          <changed>1574820009</changed>          <gmt_changed>2019-11-27 02:00:09</gmt_changed>      </item>          <item>          <nid>629430</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Impacts - December 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan WREK Radio Swing Space - 20191122 (1).png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20WREK%20Radio%20Swing%20Space%20-%2020191122%20%281%29.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20WREK%20Radio%20Swing%20Space%20-%2020191122%20%281%29.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520WREK%2520Radio%2520Swing%2520Space%2520-%252020191122%2520%25281%2529.png?itok=KKv-bvx6]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[aerial map of construction logistics plan WREK Radio Swing Space]]></image_alt>                    <created>1574819378</created>          <gmt_created>2019-11-27 01:49:38</gmt_created>          <changed>1574819378</changed>          <gmt_changed>2019-11-27 01:49:38</gmt_changed>      </item>          <item>          <nid>628314</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Updates -  November  2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page4.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25201%2520Utility%2520Work%2520-%2520102219-122019-page4.png?itok=d9IVILq0]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 4]]></image_alt>                    <created>1572373418</created>          <gmt_created>2019-10-29 18:23:38</gmt_created>          <changed>1572373418</changed>          <gmt_changed>2019-10-29 18:23:38</gmt_changed>      </item>          <item>          <nid>628313</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Updates - November 2019 ]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25201%2520Utility%2520Work%2520-%2520102219-122019-page3.png?itok=6aUpFeUz]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 3]]></image_alt>                    <created>1572373350</created>          <gmt_created>2019-10-29 18:22:30</gmt_created>          <changed>1572373350</changed>          <gmt_changed>2019-10-29 18:22:30</gmt_changed>      </item>          <item>          <nid>628311</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Updates - November 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-1.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25201%2520Utility%2520Work%2520-%2520102219-122019-1.png?itok=NPzpAHtd]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 1]]></image_alt>                    <created>1572373119</created>          <gmt_created>2019-10-29 18:18:39</gmt_created>          <changed>1572373151</changed>          <gmt_changed>2019-10-29 18:19:11</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="628315">  <title><![CDATA[Campus Center Construction Updates - November - December 2019]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>General:</strong></p><p>*Construction traffic in this sector of campus.</p><p>*Normal working hours 6:00 AM &ndash; 5:30 PM.</p><p><strong>Phase I Building Construction (within project fence line):</strong></p><p>*Pre- Engineered Metal Buildings and roofing for the Caf&eacute; and Pavilion buildings will be erected.</p><p>*Exterior metal framing, sheathing, and waterproofing at the Exhibition Hall will continue.</p><p>*Roofing at Exhibition Hall will be substantially complete.</p><p>*Exhibition Hall masonry and window systems installation will begin.</p><p>*Overhead mechanical, electrical, and plumbing systems at the Exhibition Hall will be installed.</p><p>*Interior metal framing walls and door frames will be installed at Exhibition Hall.</p><p><strong>Phase I Utilities:</strong></p><p>*Storm, sanitary sewer, and power ductbank will be installed north of the Student Center Parking Garage 9/6/2019 &ndash; 12/20/2019.&nbsp; Work should pass Smithgall 11/15</p><p>*Fencing will remain in place to provide barriers between construction activities and the campus.</p><p>*Signage will remain in placed around perimeter of fencing to direct pedestrian traffic.&nbsp;</p><p>*Pedestrian pathways approaching Ferst Center from ISYE lawn have been installed to divert walkways around construction.</p><p>*Way finding signage has been placed around this part of campus to provide alternate routes.</p><p>*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1572374010</created>  <gmt_created>2019-10-29 18:33:30</gmt_created>  <changed>1572544898</changed>  <gmt_changed>2019-10-31 18:01:38</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction Impacts for Campus Center during the months of November and December 2019]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction Impacts for Campus Center during the months of November and December 2019]]></sentence>  <summary><![CDATA[<p>In the month of November 2019, Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project.&nbsp;</p><p>&nbsp;</p>]]></summary>  <dateline>2019-10-29T00:00:00-04:00</dateline>  <iso_dateline>2019-10-29T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-10-29 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<p>The&nbsp;<strong>Campus Center Project</strong>&nbsp;will renovate portions of the existing Student Center and expand services into four new buildings across a 15-acre site to create program spaces necessary for the&nbsp;growing campus.</p>]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>For further information regarding this project, contact&nbsp;</p><p>Nicolas Palfrey</p><p>Capital Project Manager</p><p>470-363-7520</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>628311</item>          <item>628312</item>          <item>628313</item>          <item>628314</item>      </media>  <hg_media>          <item>          <nid>628311</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Updates - November 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-1.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-1.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25201%2520Utility%2520Work%2520-%2520102219-122019-1.png?itok=NPzpAHtd]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 1]]></image_alt>                    <created>1572373119</created>          <gmt_created>2019-10-29 18:18:39</gmt_created>          <changed>1572373151</changed>          <gmt_changed>2019-10-29 18:19:11</gmt_changed>      </item>          <item>          <nid>628312</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Updates - November 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25201%2520Utility%2520Work%2520-%2520102219-122019-page2.png?itok=5RNzNrcN]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 2]]></image_alt>                    <created>1572373263</created>          <gmt_created>2019-10-29 18:21:03</gmt_created>          <changed>1572373263</changed>          <gmt_changed>2019-10-29 18:21:03</gmt_changed>      </item>          <item>          <nid>628313</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Updates - November 2019 ]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page3.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25201%2520Utility%2520Work%2520-%2520102219-122019-page3.png?itok=6aUpFeUz]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 3]]></image_alt>                    <created>1572373350</created>          <gmt_created>2019-10-29 18:22:30</gmt_created>          <changed>1572373350</changed>          <gmt_changed>2019-10-29 18:22:30</gmt_changed>      </item>          <item>          <nid>628314</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Updates -  November  2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - 102219-122019-page4.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20102219-122019-page4.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25201%2520Utility%2520Work%2520-%2520102219-122019-page4.png?itok=d9IVILq0]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center Logistics November 2019 - page 4]]></image_alt>                    <created>1572373418</created>          <gmt_created>2019-10-29 18:23:38</gmt_created>          <changed>1572373418</changed>          <gmt_changed>2019-10-29 18:23:38</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[http://www.studentcenter.gatech.edu/campus-center]]></url>        <title><![CDATA[Student Center]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>          <keyword tid="61411"><![CDATA[Campus Construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="626989">  <title><![CDATA[Beringause Demolition and EcoCommons Construction plans Oct 2019]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>General:</strong></p><p>&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;W24 &amp; W25 Surface Lot closed to the public. Lots to be demolished.</p><p>&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;East sidewalk along Hemphill Avenue between Ferst Drive and Eighth Street to be closed 10/2/2019</p><p>&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Temporary access from Dalney Parking Deck to State Street provided until permanent path installation.</p><p>&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Access to and from Center Street Apartment south building will be limited from north and east directions. Area to south will be fenced off for construction.</p><p>&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Construction truck traffic in this sector of campus.</p><p>&nbsp;</p><p><a href="mailto:jerry.young@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">jerry.young@facilities.gatech.edu</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1569967292</created>  <gmt_created>2019-10-01 22:01:32</gmt_created>  <changed>1570113849</changed>  <gmt_changed>2019-10-03 14:44:09</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Activities related to to the Beringause Demolition and EcoCommons begin October 2nd.]]></teaser>  <type>news</type>  <sentence><![CDATA[Activities related to to the Beringause Demolition and EcoCommons begin October 2nd.]]></sentence>  <summary><![CDATA[<p>The latest&nbsp;construction activities related&nbsp;to the Beringause Demolition and EcoCommons Living Building Sector Construction. October 2019- August 2020</p>]]></summary>  <dateline>2019-10-01T00:00:00-04:00</dateline>  <iso_dateline>2019-10-01T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-10-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jerry.young@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>626987</item>          <item>627083</item>          <item>627084</item>      </media>  <hg_media>          <item>          <nid>626987</nid>          <type>image</type>          <title><![CDATA[Beringause Demolition and EcoCommons Construction October 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Site Logistics Plans_9.27.2019 (3)-1.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Site%20Logistics%20Plans_9.27.2019%20%283%29-1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Site%20Logistics%20Plans_9.27.2019%20%283%29-1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Site%2520Logistics%2520Plans_9.27.2019%2520%25283%2529-1.jpg?itok=BYj-i0Pc]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of site fencing for Eco Commons construction Oct 2019]]></image_alt>                    <created>1569966935</created>          <gmt_created>2019-10-01 21:55:35</gmt_created>          <changed>1569966935</changed>          <gmt_changed>2019-10-01 21:55:35</gmt_changed>      </item>          <item>          <nid>627083</nid>          <type>image</type>          <title><![CDATA[Eco Commons Site Logistics Plan page 2]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Site Logistics Plans_9.27.2019 (3)-2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Site%20Logistics%20Plans_9.27.2019%20%283%29-2.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Site%20Logistics%20Plans_9.27.2019%20%283%29-2.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Site%2520Logistics%2520Plans_9.27.2019%2520%25283%2529-2.png?itok=aRrxI5LC]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map 2 of Eco Commons construction]]></image_alt>                    <created>1570113678</created>          <gmt_created>2019-10-03 14:41:18</gmt_created>          <changed>1570113678</changed>          <gmt_changed>2019-10-03 14:41:18</gmt_changed>      </item>          <item>          <nid>627084</nid>          <type>image</type>          <title><![CDATA[Eco Commons Site Logistics Plan page 3]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Site Logistics Plans_9.27.2019 (3)-3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Site%20Logistics%20Plans_9.27.2019%20%283%29-3.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Site%20Logistics%20Plans_9.27.2019%20%283%29-3.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Site%2520Logistics%2520Plans_9.27.2019%2520%25283%2529-3.png?itok=3PmLFDTE]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[mpa of signage plan for EcoCommons construction]]></image_alt>                    <created>1570113793</created>          <gmt_created>2019-10-03 14:43:13</gmt_created>          <changed>1570113793</changed>          <gmt_changed>2019-10-03 14:43:13</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="79481"><![CDATA[ecocommons]]></keyword>          <keyword tid="1990"><![CDATA[landscaping]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="626788">  <title><![CDATA[Installation of construction fencing for Eco-Commons to begin 9/23]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Eco-Commons concept plan embeds a rich landscape experience into Georgia Tech&rsquo;s existing campus fabric.&nbsp;The proposed design aims to meet the ambitious goals of the Georgia Tech campus Landscape Master Plan, which include reducing campus stormwater by 50%, achieving 75% tree canopy coverage, increasing woodland acreage by 40%, and expanding tree biomass carbon storage capacity by 20%.&nbsp;&nbsp;&nbsp;The Eco-Commons plan also embraces a&nbsp;sustainability strategy that enhances biodiversity&nbsp;and emphasizes the pedestrian experience, while providing universal access to both existing and proposed buildings around the project site.&nbsp; &nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1569519623</created>  <gmt_created>2019-09-26 17:40:23</gmt_created>  <changed>1569519889</changed>  <gmt_changed>2019-09-26 17:44:49</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction fencing will go up for the initial phase of new Eco-Commons]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction fencing will go up for the initial phase of new Eco-Commons]]></sentence>  <summary><![CDATA[<p>Construction fencing will go up for the initial phase of new Eco-Commons.</p>]]></summary>  <dateline>2019-09-26T00:00:00-04:00</dateline>  <iso_dateline>2019-09-26T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-09-26 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p><p>404-565-3449</p><p><a href="http://www.facilities.gatech.edu/" rel="noopener noreferrer" target="_blank">www.facilities.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>626346</item>      </media>  <hg_media>          <item>          <nid>626346</nid>          <type>image</type>          <title><![CDATA[Eco-Commons Plan]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[190603_EcoCommons_PDC Presentation_summary_Page_1.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/190603_EcoCommons_PDC%20Presentation_summary_Page_1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/190603_EcoCommons_PDC%20Presentation_summary_Page_1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/190603_EcoCommons_PDC%2520Presentation_summary_Page_1.jpg?itok=-PggJPXu]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Proposed Eco-Commons plan.]]></image_alt>                    <created>1568817915</created>          <gmt_created>2019-09-18 14:45:15</gmt_created>          <changed>1573085115</changed>          <gmt_changed>2019-11-07 00:05:15</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="147851"><![CDATA[eco-commons]]></keyword>          <keyword tid="1990"><![CDATA[landscaping]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="626668">  <title><![CDATA[Campus Center Construction Updates -  October 2019]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>General:</strong></p><p>*Surface Lot 3 is not open to the public.&nbsp; This area is a construction zone.</p><p>*Construction truck traffic in this sector of campus.</p><p>*Normal working hours 6:00 AM &ndash; 5:30 PM.</p><p>&nbsp;</p><p><strong>Phase I Building Construction (within project fence line):</strong></p><p>*Underslab plumbing and electrical at the Caf&eacute; and Pavilion buildings will be completed.</p><p>*Slab on grade at the Caf&eacute; and Pavilion buildings will be completed.</p><p>*Storm and sanitary systems servicing the new buildings will continue.</p><p>*Electrical and communication ductbanks to provide service to the new construction will continue.</p><p>*Structural steel for the Exhibition Hall erection will continue.</p><p>*Exterior metal framing at the Exhibition Hall will begin.</p><p>&nbsp;</p><p><strong>Phase I Utilities:</strong></p><p>*Stormwater, sanitary sewer and other utility work will continue north of the parking deck and down through to Ferst Plaza.</p><p>*Fencing will remain in place to provide barriers between construction activities and the campus.</p><p>*Signage will remain in placed around perimeter of fencing to direct pedestrian traffic.&nbsp;</p><p>*Pedestrian pathways approaching Ferst Center from ISYE lawn have been installed to divert walkways around construction.</p><p>*Way finding signage has been placed around this part of campus to provide alternate routes.</p><p>*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.</p><p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p><a href="mailto:nicolas.palfrey@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">nicolas.palfrey@facilities.gatech.edu</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1569341433</created>  <gmt_created>2019-09-24 16:10:33</gmt_created>  <changed>1569341433</changed>  <gmt_changed>2019-09-24 16:10:33</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Updates for month of October for Campus Center Construction]]></teaser>  <type>news</type>  <sentence><![CDATA[Updates for month of October for Campus Center Construction]]></sentence>  <summary><![CDATA[<p>&nbsp;Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project.&nbsp;</p>]]></summary>  <dateline>2019-09-24T00:00:00-04:00</dateline>  <iso_dateline>2019-09-24T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-09-24 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>626663</item>          <item>625041</item>          <item>625043</item>      </media>  <hg_media>          <item>          <nid>626663</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Update Logistics Map -  October 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - sept6-dec20.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20sept6-dec20.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20sept6-dec20.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25201%2520Utility%2520Work%2520-%2520sept6-dec20.jpg?itok=UW6ZbLWR]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1569339341</created>          <gmt_created>2019-09-24 15:35:41</gmt_created>          <changed>1569339341</changed>          <gmt_changed>2019-09-24 15:35:41</gmt_changed>      </item>          <item>          <nid>625041</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction 9/4-12/1]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construct Logistics Plan Phase 9619-122019-map 2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construct%20Logistics%20Plan%20Phase%209619-122019-map%202.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construct%20Logistics%20Plan%20Phase%209619-122019-map%202.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construct%2520Logistics%2520Plan%2520Phase%25209619-122019-map%25202.png?itok=Z_b-Adm7]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center construction Sept 4 - Dec 20]]></image_alt>                    <created>1566507515</created>          <gmt_created>2019-08-22 20:58:35</gmt_created>          <changed>1566507933</changed>          <gmt_changed>2019-08-22 21:05:33</gmt_changed>      </item>          <item>          <nid>625043</nid>          <type>image</type>          <title><![CDATA[Campus Center Logistics 12/2 - 4/2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construct Logistics Plan Phase 9619-122019-map3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construct%20Logistics%20Plan%20Phase%209619-122019-map3.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construct%20Logistics%20Plan%20Phase%209619-122019-map3.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construct%2520Logistics%2520Plan%2520Phase%25209619-122019-map3.png?itok=g2FQz9Mr]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center construction December - April 2020]]></image_alt>                    <created>1566507684</created>          <gmt_created>2019-08-22 21:01:24</gmt_created>          <changed>1566508437</changed>          <gmt_changed>2019-08-22 21:13:57</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="626666">  <title><![CDATA[Clone of Campus Center Construction Updates -  October 2019]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project during the month of October.</p><p><strong>General:</strong></p><p>*Surface Lot 3 is not open to the public.&nbsp; This area is a construction zone.</p><p>*Construction truck traffic in this sector of campus.</p><p>*Normal working hours 6:00 AM &ndash; 5:30 PM.</p><p>&nbsp;</p><p><strong>Phase I Building Construction (within project fence line):</strong></p><p>*Underslab plumbing and electrical at the Caf&eacute; and Pavilion buildings will be completed.</p><p>*Slab on grade at the Caf&eacute; and Pavilion buildings will be completed.</p><p>*Storm and sanitary systems servicing the new buildings will continue.</p><p>*Electrical and communication ductbanks to provide service to the new construction will continue.</p><p>*Structural steel for the Exhibition Hall erection will continue.</p><p>*Exterior metal framing at the Exhibition Hall will begin.</p><p>&nbsp;</p><p><strong>Phase I Utilities:</strong></p><p>*Stormwater, sanitary sewer and other utility work will continue north of the parking deck and down through to Ferst Plaza.</p><p>*Fencing will remain in place to provide barriers between construction activities and the campus.</p><p>*Signage will remain in placed around perimeter of fencing to direct pedestrian traffic.&nbsp;</p><p>*Pedestrian pathways approaching Ferst Center from ISYE lawn have been installed to divert walkways around construction.</p><p>*Way finding signage has been placed around this part of campus to provide alternate routes.</p><p>*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.</p><p>For further information contact:</p><p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p><a href="tel:470-363-7520" rel="noopener noreferrer" target="_blank">470-363-7520</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1569340898</created>  <gmt_created>2019-09-24 16:01:38</gmt_created>  <changed>1569340898</changed>  <gmt_changed>2019-09-24 16:01:38</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Phase I work including construction of the Exhibition Hall, Pavilion and Café buildings will continue for the Campus Center project.during the month of October]]></teaser>  <type>news</type>  <sentence><![CDATA[Phase I work including construction of the Exhibition Hall, Pavilion and Café buildings will continue for the Campus Center project.during the month of October]]></sentence>  <summary><![CDATA[<p>Phase I work including construction of the Exhibition Hall, Pavilion and Caf&eacute; buildings will continue for the Campus Center project during the month of October.</p>]]></summary>  <dateline>2019-09-24T00:00:00-04:00</dateline>  <iso_dateline>2019-09-24T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-09-24 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[nicolas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>626663</item>          <item>625041</item>          <item>625043</item>      </media>  <hg_media>          <item>          <nid>626663</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction Update Logistics Map -  October 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construction Logistics Plan Phase 1 Utility Work - sept6-dec20.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20sept6-dec20.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construction%20Logistics%20Plan%20Phase%201%20Utility%20Work%20-%20sept6-dec20.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construction%2520Logistics%2520Plan%2520Phase%25201%2520Utility%2520Work%2520-%2520sept6-dec20.jpg?itok=UW6ZbLWR]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1569339341</created>          <gmt_created>2019-09-24 15:35:41</gmt_created>          <changed>1569339341</changed>          <gmt_changed>2019-09-24 15:35:41</gmt_changed>      </item>          <item>          <nid>625041</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction 9/4-12/1]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construct Logistics Plan Phase 9619-122019-map 2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construct%20Logistics%20Plan%20Phase%209619-122019-map%202.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construct%20Logistics%20Plan%20Phase%209619-122019-map%202.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construct%2520Logistics%2520Plan%2520Phase%25209619-122019-map%25202.png?itok=Z_b-Adm7]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center construction Sept 4 - Dec 20]]></image_alt>                    <created>1566507515</created>          <gmt_created>2019-08-22 20:58:35</gmt_created>          <changed>1566507933</changed>          <gmt_changed>2019-08-22 21:05:33</gmt_changed>      </item>          <item>          <nid>625043</nid>          <type>image</type>          <title><![CDATA[Campus Center Logistics 12/2 - 4/2020]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTCC Construct Logistics Plan Phase 9619-122019-map3.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTCC%20Construct%20Logistics%20Plan%20Phase%209619-122019-map3.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTCC%20Construct%20Logistics%20Plan%20Phase%209619-122019-map3.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTCC%2520Construct%2520Logistics%2520Plan%2520Phase%25209619-122019-map3.png?itok=g2FQz9Mr]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Campus Center construction December - April 2020]]></image_alt>                    <created>1566507684</created>          <gmt_created>2019-08-22 21:01:24</gmt_created>          <changed>1566508437</changed>          <gmt_changed>2019-08-22 21:13:57</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="182121"><![CDATA[construction updates]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="625373">  <title><![CDATA[UPDATE: Paving of Dalney & Greenfield Streets to occur 9/28]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Dalney &amp; Greenfield Ductbanks</p><p><strong>&nbsp;What</strong>:&nbsp;Partially pave Dalney St. and Greenfield St. over the communication ductbanks&nbsp;in an effort to re-route aerial cables to below ground. &nbsp; &nbsp;</p><p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;</p><p><strong>Date</strong>:&nbsp; Saturday, September 28, 2019&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;</p><p><strong>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</strong></p><p>&nbsp;&nbsp;&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;</p><p><strong>Impact (see attached map):&nbsp;</strong>&nbsp; &nbsp;</p><p>&middot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;North and southbound traffic along the highlighted sections of Greenfield St. NW and Dalney St. NW will be impacted. The main disruption will be on Saturday, September 28th. Every effort will be made to safely maintain through-traffic and access to adjacent parking lots at all times.</p><p>&nbsp;&nbsp;</p><p>Please let me know if you have any questions or concerns.&nbsp;</p><p>&nbsp;</p><p><strong>Mark Wood</strong></p><p>Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>C: 404-630-6486</p><p><a href="mailto:mark.wood@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">mark.wood@facilities.gatech.edu</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1567175901</created>  <gmt_created>2019-08-30 14:38:21</gmt_created>  <changed>1569337252</changed>  <gmt_changed>2019-09-24 15:00:52</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Paving of Dalney & Greenfield to take place 9/28]]></teaser>  <type>news</type>  <sentence><![CDATA[Paving of Dalney & Greenfield to take place 9/28]]></sentence>  <summary><![CDATA[<p>UPDATE: Paving of&nbsp;Dalney St. and Greenfield St. over the communication ductbanks&nbsp;in an effort to re-route aerial cables to below ground.</p>]]></summary>  <dateline>2019-08-30T00:00:00-04:00</dateline>  <iso_dateline>2019-08-30T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-08-30 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Dalney & Greenfield paving 9/28]]>  </subtitle>  <sidebar><![CDATA[<p>Paving of Greenfield &amp; Dalney Streets September 2019</p>]]></sidebar>  <email><![CDATA[mark.wood@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Mark Wood</strong></p><p>Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>C: 404-630-6486</p><p><a href="mailto:mark.wood@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">mark.wood@facilities.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>625372</item>      </media>  <hg_media>          <item>          <nid>625372</nid>          <type>image</type>          <title><![CDATA[Dalney Paving September 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Campus Notification - Greenfield &amp; Dalney Paving (1).png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Campus%20Notification%20-%20Greenfield%20%26%20Dalney%20Paving%20%281%29.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Campus%20Notification%20-%20Greenfield%20%26%20Dalney%20Paving%20%281%29.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Campus%2520Notification%2520-%2520Greenfield%2520%2526%2520Dalney%2520Paving%2520%25281%2529.png?itok=2c5igBme]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of Dalney paving plan Sept 2019]]></image_alt>                    <created>1567175513</created>          <gmt_created>2019-08-30 14:31:53</gmt_created>          <changed>1567175513</changed>          <gmt_changed>2019-08-30 14:31:53</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="182071"><![CDATA[dalney]]></keyword>          <keyword tid="10969"><![CDATA[road closure]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="626103">  <title><![CDATA[Sidewalk North of Baker connecting Dalney and State Street will be closed 9/17 to 10/11   ]]></title>  <uid>35028</uid>  <body><![CDATA[<p><a name="x__MailEndCompose">As a continuation of the work at State Street, construction will take place to &nbsp;install&nbsp;a storm water drainage system to better manage run-off from the slope north of the Baker Building.&nbsp; This work will begin on Tuesday, September 17<sup>th</sup>&nbsp;and will last through October 11<sup>th</sup>&nbsp;(weather permitting).</a></p><p>To ensure safety of pedestrians, the sidewalk North of Baker connecting Dalney and State Street will be closed for the duration of the project from September 17<sup>th</sup>&nbsp;to October 11<sup>th</sup>.&nbsp;</p><p>The alternate route will be the sidewalk at 10<sup>th</sup>&nbsp;Street.&nbsp; Also, pedestrians will not be able to travel north on the west side of State Street beyond the crosswalks due to excavation adjacent to the street.&nbsp; It&rsquo;s possible this northbound section of sidewalk on State Street may be able to open up after the manhole work is complete and the sidewalk restored; this condition will be monitored to restore normal foot-travel as quickly as practical.</p><p>Please contact me if you have any specific questions about this notification.</p><p><strong>Jennifer Disotell</strong></p><p>&nbsp;Special Projects Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p><a href="mailto:jennifer.disotell@facilities.gatech.edu" rel="noopener noreferrer" target="_blank">jennifer.disotell@facilities.gatech.edu</a></p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1568321177</created>  <gmt_created>2019-09-12 20:46:17</gmt_created>  <changed>1568819830</changed>  <gmt_changed>2019-09-18 15:17:10</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The sidewalk North of Baker connecting Dalney and State Street will be closed 9/17 through  mid-October due to the installation of a stormwater drainage system. ]]></teaser>  <type>news</type>  <sentence><![CDATA[The sidewalk North of Baker connecting Dalney and State Street will be closed 9/17 through  mid-October due to the installation of a stormwater drainage system. ]]></sentence>  <summary><![CDATA[<p>The sidewalk North of Baker connecting Dalney and State Street will be closed 9/17&nbsp;- mid October due to the installation of a stormwater drainage system.&nbsp;</p>]]></summary>  <dateline>2019-09-12T00:00:00-04:00</dateline>  <iso_dateline>2019-09-12T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-09-12 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jennifer.disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jennifer Disotell</strong></p><p>&nbsp;Special Projects Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>626241</item>      </media>  <hg_media>          <item>          <nid>626241</nid>          <type>image</type>          <title><![CDATA[Traffic Control Plan Baker]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Traffic Control Plan Baker Drainage  (1).jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Traffic%20Control%20Plan%20Baker%20Drainage%20%20%281%29.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Traffic%20Control%20Plan%20Baker%20Drainage%20%20%281%29.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Traffic%2520Control%2520Plan%2520Baker%2520Drainage%2520%2520%25281%2529.jpg?itok=nYSgD_lT]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of traffic control plan for Baker drainage install]]></image_alt>                    <created>1568658042</created>          <gmt_created>2019-09-16 18:20:42</gmt_created>          <changed>1568658042</changed>          <gmt_changed>2019-09-16 18:20:42</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="168984"><![CDATA[sidewalks]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="626344">  <title><![CDATA[Installation of construction fencing for new Eco-Commons to begin 9/23]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Construction fencing will go up on 9/23 to begin the initial phase of the Eco-Commons plan.</p><p>The Eco-Commons concept plan embeds a rich landscape experience into Georgia Tech&rsquo;s existing campus fabric.&nbsp;The proposed design aims to meet the ambitious goals of the Georgia Tech campus Landscape Master Plan, which include reducing campus stormwater by 50%, achieving 75% tree canopy coverage, increasing woodland acreage by 40%, and expanding tree biomass carbon storage capacity by 20%.&nbsp;&nbsp;&nbsp;The Eco-Commons plan also embraces a&nbsp;sustainability strategy that enhances biodiversity&nbsp;and emphasizes the pedestrian experience, while providing universal access to both existing and proposed buildings around the project site.&nbsp; &nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1568817601</created>  <gmt_created>2019-09-18 14:40:01</gmt_created>  <changed>1568819680</changed>  <gmt_changed>2019-09-18 15:14:40</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction fencing will go up for the initial phase of new Eco-Commons]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction fencing will go up for the initial phase of new Eco-Commons]]></sentence>  <summary><![CDATA[<p>Construction fencing will go up on 9/23 to begin the initial phase of Eco-Commons project.</p>]]></summary>  <dateline>2019-09-18T00:00:00-04:00</dateline>  <iso_dateline>2019-09-18T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-09-18 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jeremiah Young</strong></p><p>Landscape Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p><p>&nbsp;</p><p>404-565-3449</p><p><a href="http://www.facilities.gatech.edu/" rel="noopener noreferrer" target="_blank">www.facilities.gatech.edu</a></p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>626346</item>      </media>  <hg_media>          <item>          <nid>626346</nid>          <type>image</type>          <title><![CDATA[Eco-Commons Plan]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[190603_EcoCommons_PDC Presentation_summary_Page_1.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/190603_EcoCommons_PDC%20Presentation_summary_Page_1.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/190603_EcoCommons_PDC%20Presentation_summary_Page_1.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/190603_EcoCommons_PDC%2520Presentation_summary_Page_1.jpg?itok=-PggJPXu]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Proposed Eco-Commons plan.]]></image_alt>                    <created>1568817915</created>          <gmt_created>2019-09-18 14:45:15</gmt_created>          <changed>1573085115</changed>          <gmt_changed>2019-11-07 00:05:15</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="147851"><![CDATA[eco-commons]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="626341">  <title><![CDATA[City of Atlanta street resurfacing of Mecaslin St. between 16th St. and Richards to begin 9/23]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The City of Atlanta Department of Public Works continues to implement community improvement projects throughout the city. On September 23rd &ndash; October 25th,&nbsp;&nbsp;roadway maintenance activities will begin along the following areas:  Mecaslin Street NW between 16th Street and Richards Street.&nbsp; Emergency NO PARKING signs will be placed along the project areas 72 hours prior to resurfacing. Please move your vehicle to an off-street parking area or a side street prior to the roadway maintenance activities otherwise it may be subject to being towed. (Georgia Code 44-1-13) __________________________________________________________________________________ Street resurfacing projects are typically scheduled for completion within 30 days pending weather or other unforeseen circumstances. The street resurfacing process involves several phases of milling, patching, final paving, resetting manhole/water valve structures, and striping if needed. The striping along with any additional asphalt work typically follows within 2 - 3 weeks after the final paving is completed. Construction may take place between the hours of 8:00 am and 5:00 pm Monday - Friday unless otherwise posted/stated. Local traffic access will be maintained for the duration. For questions concerning impact to the right-of-way fronting specific properties or concerns during the construction of this project, please contact, City of Atlanta, Department of Public Works (404) 330-6501 or visit http://www.astragroupinc.com/</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1568815853</created>  <gmt_created>2019-09-18 14:10:53</gmt_created>  <changed>1568819171</changed>  <gmt_changed>2019-09-18 15:06:11</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[City of Atlanta street resurfacing of Mecaslin St. will begin 9/23]]></teaser>  <type>news</type>  <sentence><![CDATA[City of Atlanta street resurfacing of Mecaslin St. will begin 9/23]]></sentence>  <summary><![CDATA[<p>On September 23rd &ndash; October 25th,&nbsp; City of Atlanta roadway maintenance activities will begin along the following areas: &nbsp;Mecaslin Street NW between 16th Street and Richards Street.&nbsp;</p>]]></summary>  <dateline>2019-09-18T00:00:00-04:00</dateline>  <iso_dateline>2019-09-18T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-09-18 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p>City of Atlanta, Department of Public Works (404) 330-6501 or visit http://www.astragroupinc.com</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>626348</item>      </media>  <hg_media>          <item>          <nid>626348</nid>          <type>image</type>          <title><![CDATA[City of Atlanta logo]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[city of atlanta logo.JPG]]></image_name>            <image_path><![CDATA[/sites/default/files/images/city%20of%20atlanta%20logo.JPG]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/city%20of%20atlanta%20logo.JPG]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/city%2520of%2520atlanta%2520logo.JPG?itok=U2grl_vY]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[city of atlanta logo]]></image_alt>                    <created>1568819138</created>          <gmt_created>2019-09-18 15:05:38</gmt_created>          <changed>1568819138</changed>          <gmt_changed>2019-09-18 15:05:38</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="182381"><![CDATA[street resurfacing]]></keyword>          <keyword tid="1134"><![CDATA[City of Atlanta]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="626087">  <title><![CDATA[Third Street closed on 9/30 from 8:30 am - 3:30pm]]></title>  <uid>35028</uid>  <body><![CDATA[<p>Third Street will be temporarily&nbsp;closed on 9/30/19 from approximately 8:30 am until 3:30 pm.&nbsp; See attached for crane location.&nbsp; This is in conjunction with the new Dedicated Outdoor Air System (DOAS) that is being installed on the roof of Hopkins Residence Hall.&nbsp;</p><p><strong>Spencer Sheffield</strong></p><p>Project Manager, Senior</p><p>spencer.sheffield@aux.gatech.edu</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1568305483</created>  <gmt_created>2019-09-12 16:24:43</gmt_created>  <changed>1568319957</changed>  <gmt_changed>2019-09-12 20:25:57</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Third Street will be temporary closed on 9/30/19]]></teaser>  <type>news</type>  <sentence><![CDATA[Third Street will be temporary closed on 9/30/19]]></sentence>  <summary><![CDATA[<p>Third Street will be temporarily&nbsp;closed on 9/30/19 from approximately 8:30 am until&nbsp;3:30 pm.</p>]]></summary>  <dateline>2019-09-12T00:00:00-04:00</dateline>  <iso_dateline>2019-09-12T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-09-12 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[spencer.sheffield@aux.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Spencer Sheffield</p><p>&nbsp;Project Manager</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>625255</item>      </media>  <hg_media>          <item>          <nid>625255</nid>          <type>image</type>          <title><![CDATA[Hopkins Crane on Third Street]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Hopkins Crane Layout 2.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Hopkins%20Crane%20Layout%202.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Hopkins%20Crane%20Layout%202.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Hopkins%2520Crane%2520Layout%25202.png?itok=Fd85gVCl]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[photo of crane staging on Third Street for Hopkins Bldg install DOAS]]></image_alt>                    <created>1566999658</created>          <gmt_created>2019-08-28 13:40:58</gmt_created>          <changed>1566999658</changed>          <gmt_changed>2019-08-28 13:40:58</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="181528"><![CDATA[lane closure]]></keyword>          <keyword tid="174270"><![CDATA[construction facilities management]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="625631">  <title><![CDATA[Campus Center Construction Causes Pathway Changes in Southwest Sector]]></title>  <uid>27164</uid>  <body><![CDATA[<p>Phase I construction on the Campus Center project is well underway, and related fencing is expected to encompass a larger area beginning Friday. Utility&nbsp;work is necessary along the pathway between the Ferst Center for the Arts and the larger construction site to the west, which will require the campus community to use an alternate route to pass through the area.&nbsp;Planners expect this stage of the project to last throughout the fall semester.</p><p>The diagram below illustrates the alternate pathways that&nbsp;will be in place&nbsp;in order to maintain traffic flow and sufficient egress in the event of an emergency from the Ferst Center or Smithgall Student Services Building (Flag Building).&nbsp;</p><p>While this portion of work takes&nbsp;place, please be aware of the following regarding access to the&nbsp;Smithgall&nbsp;Building and Ferst Center:</p><ul><li>The existing eastern planter in front of the Ferst Center&nbsp;has been reconfigured&nbsp;with a level walkway surface to maintain access to the building.&nbsp;Additionally, a new temporary accessible pathway has been constructed&nbsp;to preserve&nbsp;traffic flow to the west side of campus.&nbsp;Travel through this area will entail using the ADA ramp from the Ferst Center, which will connect to the constructed pathway.</li><li>Access to the north side of the Smithgall building will be&nbsp;limited due to the fencing, and exits on the east, south, and west sides of the building should be used to access the building.&nbsp;Once the construction&nbsp;footprint retreats, the fencing will be moved and the atrium&rsquo;s north exit will be accessible again. The exit from the student media suite will remain open, but traffic will be rerouted by&nbsp;a small pathway&nbsp;connecting to the sidewalk along the west side of the building.&nbsp;</li><li>The&nbsp;Dean Griffin statue&nbsp;will remain outside of the work area, but the plaza will not be accessible during much of&nbsp;this phase of the work.</li><li>Throughout this phase, the campus community should exercise particular caution in this area. Those traveling on bicycles and scooters will need to dismount before entering the constructed pathway, and golf carts/other motorized vehicles should use routes around the north side of Ferst Center or Ferst Drive.</li></ul><p>Every effort is being taken to&nbsp;maintain the safety of the broader campus community and keep the project on schedule.&nbsp;Further details about Phase II will be released later in the fall semester. Meanwhile, everyone is encouraged to attend upcoming town hall updates on the project:</p><ul><li>Wednesday, October 16: 5-6 p.m., Peachtree Room, Student Center</li><li>Friday, October 18: 11 a.m.-12 p.m., Piedmont Room, Student Center</li><li>Monday, October 21: 5-6 p.m., Room 301, Student Center</li><li>Wednesday, October 23: 1-2 p.m., Piedmont Room, Student Center</li></ul><p>More details on the Campus Center project can be found at <a href="https://studentcenter.gatech.edu/reinnovation">studentcenter.gatech.edu/reinnovation</a>.</p>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1567630268</created>  <gmt_created>2019-09-04 20:51:08</gmt_created>  <changed>1567806915</changed>  <gmt_changed>2019-09-06 21:55:15</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Phase I construction on the Campus Center project is well underway, and related fencing is expected to encompass a larger area beginning Friday. ]]></teaser>  <type>news</type>  <sentence><![CDATA[Phase I construction on the Campus Center project is well underway, and related fencing is expected to encompass a larger area beginning Friday. ]]></sentence>  <summary><![CDATA[<p>Phase I construction on the Campus Center project is well underway, and related fencing is expected to encompass a larger area beginning Friday.</p>]]></summary>  <dateline>2019-09-04T00:00:00-04:00</dateline>  <iso_dateline>2019-09-04T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-09-04 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:kate.curnow@stucen.gatech.edu">M. Kate Curnow</a><br />Communication and Marketing Manager<br />Student Center&nbsp;<br />&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>625630</item>      </media>  <hg_media>          <item>          <nid>625630</nid>          <type>image</type>          <title><![CDATA[Campus Center Phase 1 Aug - Dec 2019]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[CC Workmap Phase 1c-d 2019.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/CC%20Workmap%20Phase%201c-d%202019.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/CC%20Workmap%20Phase%201c-d%202019.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/CC%2520Workmap%2520Phase%25201c-d%25202019.jpg?itok=p3KMMrbv]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Campus Center Phase 1 Continues]]></image_alt>                    <created>1567627957</created>          <gmt_created>2019-09-04 20:12:37</gmt_created>          <changed>1567627957</changed>          <gmt_changed>2019-09-04 20:12:37</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://studentcenter.gatech.edu/]]></url>        <title><![CDATA[Student Center]]></title>      </link>          <link>        <url><![CDATA[https://studentcenter.gatech.edu/reinnovation]]></url>        <title><![CDATA[Campus Center Project ]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="499601"><![CDATA[Campus Services]]></group>          <group id="64319"><![CDATA[Administration and Finance]]></group>          <group id="1294"><![CDATA[Auxiliary Services]]></group>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>          <group id="1269"><![CDATA[Student Life]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>          <keyword tid="100141"><![CDATA[fencing]]></keyword>          <keyword tid="166965"><![CDATA[Student Center]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="624406">  <title><![CDATA[Campus Center August Update and Logistics Map ]]></title>  <uid>35028</uid>  <body><![CDATA[<p>The Campus Center construction continues throughout August and the attached&nbsp;diagram illustrates the alternate pathways that&nbsp;will be in place while the utility infrastructure work is carried out&nbsp;in order to maintain sufficient egress in the event of an emergency from the Ferst Center or Smithgall Building.&nbsp;&nbsp;While this portion of work takes&nbsp;place, there are some things to note about accessing the&nbsp;Smithgall&nbsp;Building and Ferst Center:</p><ul><li>The existing eastern planter in front of the Ferst Center&nbsp;has been reconfigured&nbsp;with a level walkway surface to maintain access to the building.&nbsp;&nbsp;Additionally, a new temporary accessible pathway will be constructed to preserve&nbsp;traffic flow to the west side of campus.&nbsp; This allows work that otherwise would have obstructed the exits from the Ferst Center to occur without compromising the safety of those visiting the Ferst Center.&nbsp;</li><li>Access to the north side of the Smithgall building will be&nbsp;limited. Folks should use exits on the east, south, and west sides of the building.&nbsp;Once the construction&nbsp;footprint shrinks, the north exit from the atrium will be accessible once again. The exit from the Student Media suite will remain open but traffic will be rerouted by&nbsp;a small pathway&nbsp;connecting to the sidewalk along the west side of the building.&nbsp;</li><li>The&nbsp;Dean Griffin statue&nbsp;will remain outside of the work area, but the plaza will not be accessible during much of&nbsp;this period of work.</li></ul><p>The work that we had hoped to achieve in the Ferst Plaza and to the north of Smithgall was delayed this summer by a series of factors &ndash; working around events in order to maintain life safety, also unforeseen subterranean conditions and utilities that necessitated a complete redesign of the work.&nbsp; Some work has begun in this area but the effort will start in earnest following the President speech September 6<sup>th</sup>.</p><p>We know that this disruption will be more difficult to manage as fall classes begin. Please be assured that the team is doing everything they can to&nbsp;maintain the safety of the wider campus community and keep us on schedule.</p><p>Thank you for your continued patience,</p><p>&nbsp;</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1565724474</created>  <gmt_created>2019-08-13 19:27:54</gmt_created>  <changed>1565724573</changed>  <gmt_changed>2019-08-13 19:29:33</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Campus Center construction continues throughout August]]></teaser>  <type>news</type>  <sentence><![CDATA[Campus Center construction continues throughout August]]></sentence>  <summary><![CDATA[<p>The Campus Center construction continues throughout August and the attached&nbsp;diagram illustrates the alternate pathways that&nbsp;will be in place while the utility infrastructure work is carried out&nbsp;in order to maintain sufficient egress in the event of an emergency from the Ferst Center or Smithgall Building.</p>]]></summary>  <dateline>2019-08-13T00:00:00-04:00</dateline>  <iso_dateline>2019-08-13T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-08-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Campus Center Construction August 2019]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><strong>Nicolas Palfrey</strong></p><p>Capital Project Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>624404</item>      </media>  <hg_media>          <item>          <nid>624404</nid>          <type>image</type>          <title><![CDATA[Campus Center Construction August]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Campus Center Phase 1C Revised.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Campus%20Center%20Phase%201C%20Revised.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Campus%20Center%20Phase%201C%20Revised.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Campus%2520Center%2520Phase%25201C%2520Revised.jpg?itok=Gf1rVqxT]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of campus center construction logistics August 2019]]></image_alt>                    <created>1565723985</created>          <gmt_created>2019-08-13 19:19:45</gmt_created>          <changed>1565723985</changed>          <gmt_changed>2019-08-13 19:19:45</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="180766"><![CDATA[campus center construction]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="624297">  <title><![CDATA[Tech Square Parking Deck Levels 5 & 6 closed for maintenance 8/12-8/18]]></title>  <uid>35028</uid>  <body><![CDATA[<p>All parking spaces on levels 5 and 6 in the E81- Tech Square/GT Hotel and Conference Center/Scheller parking deck will be closed for maintenance starting Monday, August 12 at 6:00 a.m. through Sunday, August 18, 2019.</p><p>Please remove your vehicles from Levels 5 and 6 by Sunday, August 11 by 12:00 midnight. &nbsp;</p><p>You are welcome to park in other available E81 spaces. Please make sure your permit is displayed properly.</p><p><strong><em>&nbsp;</em></strong>Normal conditions should resume on Monday, August 19.</p><p>We understand that this may be an inconvenience to you. On behalf of Georgia Tech and Georgia Tech Parking &amp; Transportation Services, we appreciate your patience, cooperation and continued support.</p><p>Parking &amp; Transportation Services</p><p><a href="http://www.pts.gatech.edu/" id="LPlnk238192" rel="noopener noreferrer" target="_blank">www.pts.gatech.edu</a></p><p>404-385-7275 or 404-385-7433</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1565373097</created>  <gmt_created>2019-08-09 17:51:37</gmt_created>  <changed>1565379782</changed>  <gmt_changed>2019-08-09 19:43:02</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Tech Square Parking Deck maintenance]]></teaser>  <type>news</type>  <sentence><![CDATA[Tech Square Parking Deck maintenance]]></sentence>  <summary><![CDATA[<p>All parking spaces on levels 5 and 6 in the E81- Tech Square/GT Hotel and Conference Center/Scheller parking deck will be closed for maintenance starting Monday, August 12 at 6:00 a.m. through Sunday, August 18, 2019.</p>]]></summary>  <dateline>2019-08-09T00:00:00-04:00</dateline>  <iso_dateline>2019-08-09T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-08-09 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Tech Square Parking Deck maintenance]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>      </media>  <hg_media>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="174520"><![CDATA[campus parking]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="623412">  <title><![CDATA[GTRI Entrance Improvements begin final stage July 29]]></title>  <uid>35028</uid>  <body><![CDATA[<p><a name="_MailEndCompose">The State Street entrance into the gravel lot North of Baker Building will be closed starting Monday, July 29th&nbsp;.&nbsp; The plan is to complete pavers and the new concrete apron off State Street into the gravel lot &nbsp; During this time access to the gravel lot will be provided through the paved lot off of Dalney Street &ndash; watch for signage and cones designating the connecting drive from the paved area to the gravel area.&nbsp; Please caution your patrons that this connecting drive must be left open in order for everyone to access the gravel lot area.&nbsp;</a></p><p><strong>Tentative Construction Completion Date:&nbsp;&nbsp;</strong>Wednesday, August 7th, 2019</p><p>&nbsp;<strong>Impact (see attached map):&nbsp;</strong>&nbsp; &nbsp;</p><p>&middot;Traffic control devices will be placed to maintain continuous in-bound and out-bound traffic on State Street throughout project duration. (May 28<sup>th</sup>&nbsp;to August 7th)</p><p>&middot;&nbsp;Select parking spaces in paved lot North of Baker will be required to be blocked during stair demolition. (Timeframe &ndash; TBA)</p><p><strong><em>See attached traffic control plan for further clarification.&nbsp; These dates are subject to change depending on weather. &nbsp;</em></strong></p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1563221576</created>  <gmt_created>2019-07-15 20:12:56</gmt_created>  <changed>1563894189</changed>  <gmt_changed>2019-07-23 15:03:09</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Traffic Control Plan for State St. Entrance Closure begins July 29]]></teaser>  <type>news</type>  <sentence><![CDATA[Traffic Control Plan for State St. Entrance Closure begins July 29]]></sentence>  <summary><![CDATA[<p>Final improvements begin July 29&nbsp;on the new concrete apron off State Street into the gravel lot.&nbsp; Please be aware of new traffic cones and signage.</p>]]></summary>  <dateline>2019-07-15T00:00:00-04:00</dateline>  <iso_dateline>2019-07-15T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-07-15 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[GTRI entrance improvements slate for week of July 29]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Jennifer.Disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p><strong>Jennifer Disotell</strong></p><p>&nbsp;Special Projects Manager</p><p><strong>Georgia Institute of Technology</strong>&nbsp;|&nbsp;Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>623413</item>      </media>  <hg_media>          <item>          <nid>623413</nid>          <type>image</type>          <title><![CDATA[GTRI Entrance Improvements traffic plan July 22]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[State Street Final Traffic Control Plan Entrance Closure (2).jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/State%20Street%20Final%20Traffic%20Control%20Plan%20Entrance%20Closure%20%282%29_0.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/State%20Street%20Final%20Traffic%20Control%20Plan%20Entrance%20Closure%20%282%29_0.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/State%2520Street%2520Final%2520Traffic%2520Control%2520Plan%2520Entrance%2520Closure%2520%25282%2529_0.jpg?itok=t8wRA6cs]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of State Street Final traffic control plan for GTRI]]></image_alt>                    <created>1563221943</created>          <gmt_created>2019-07-15 20:19:03</gmt_created>          <changed>1563221943</changed>          <gmt_changed>2019-07-15 20:19:03</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="178532"><![CDATA[construction-updates]]></keyword>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="622224">  <title><![CDATA[Campus Center Construction Continues through Summer]]></title>  <uid>27164</uid>  <body><![CDATA[<p>Work on the Campus Center project continues to progress this summer, and the next few weeks will entail some of the most impactful disruptions campus will see during the first phase of construction.</p><p><strong>Here&rsquo;s what to look for in the next two months of construction:</strong><br />To support the utility needs of the new facilities, infrastructure work on stormwater and sanitary sewer drains will take place in front of the Ferst Center for the Arts beginning in July. Fencing will be installed to provide barriers between construction activities. Pedestrian pathways approaching the Ferst Center from the Instructional Center Lawn will be diverted. Wheelchair-accessible pathways will be maintained from the parking lot in front of the Smithgall Student Services (Flag) Building to the Ferst Center, and signage will be placed around this part of campus to guide pedestrians and provide alternate routes. This work is expected to last until late July.</p><p>As part of the utility work happening in front of the Ferst Center, one of Georgia Tech&rsquo;s most iconic artworks has been temporarily relocated. The Ovation statue is now in a temporary home on the Instructional Center Lawn and will be replaced in Phase II of the project.<br />Looking ahead, the next wave of activity will include work along the path between Ferst Center and the Smithgall Student Services Building (near the pecan grove). Similar to the construction work in front of the Ferst Center, accessible alternative pathways will be available, but the community is encouraged to exercise particular care when navigating through this area.</p><p>After this work, which is expected to conclude before the start of the fall semester, the main fencing footprint for Phase I will be established and will not change until spring of 2020. The entire Campus Center project is on schedule for completion in late 2022.</p><p>For more information on the Campus Center project, visit <a href="https://studentcenter.gatech.edu/reinnovation">studentcenter.gatech.edu/reinnovation</a>.</p>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1561372475</created>  <gmt_created>2019-06-24 10:34:35</gmt_created>  <changed>1563297678</changed>  <gmt_changed>2019-07-16 17:21:18</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Work on the Campus Center project continues to progress this summer, and the next four to six weeks will entail some of the most impactful disruptions campus will see during the first phase of construction. ]]></teaser>  <type>news</type>  <sentence><![CDATA[Work on the Campus Center project continues to progress this summer, and the next four to six weeks will entail some of the most impactful disruptions campus will see during the first phase of construction. ]]></sentence>  <summary><![CDATA[<p>Work on the Campus Center project continues to progress this summer, and the next six to eight weeks will entail some of the most impactful disruptions campus will see during the first phase of construction.</p>]]></summary>  <dateline>2019-06-24T00:00:00-04:00</dateline>  <iso_dateline>2019-06-24T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-06-24 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[<h4>What&#39;s happened so far:</h4><ul><li>Reshaping of the bus turnaround concluded in early June, and bus service has resumed at the stop, with construction ongoing to reconfigure adjacent sidewalks.</li><li>The Student Center parking deck has been reconfigured for permit holders and visitors. This is a credit card only deck for non-permit holders.</li><li>ADA parking spaces serving the Student Center and Ferst Center have shifted to the Area 9 parking lot, located southeast of the Student Center.</li><li>Utility duct work across Ferst Drive has been inspected and the roadway has been restored. No further disruption is expected across Ferst Drive.</li><li>Tree removal to clear the site for further work has concluded. Several trees were relocated, with landscaping plans calling for the replacement of as many trees as possible.</li></ul>]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:kate.curnow@stucen.gatech.edu">Kate Curnow</a><br />Communication and Marketing Manager<br />Student Center</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>622633</item>          <item>622634</item>      </media>  <hg_media>          <item>          <nid>622633</nid>          <type>image</type>          <title><![CDATA[Campus Center Phase 1c]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Phase 1c Map.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Phase%201c%20Map.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Phase%201c%20Map.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Phase%25201c%2520Map.jpg?itok=M9Khf7T7]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of Phase 1c work in front of the Ferst Center for the Arts]]></image_alt>                    <created>1561039068</created>          <gmt_created>2019-06-20 13:57:48</gmt_created>          <changed>1561039068</changed>          <gmt_changed>2019-06-20 13:57:48</gmt_changed>      </item>          <item>          <nid>622634</nid>          <type>image</type>          <title><![CDATA[Campus Center Phase 1d map]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Phase 1d map.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Phase%201d%20map.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Phase%201d%20map.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Phase%25201d%2520map.jpg?itok=FR7DvH01]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[map of Phase 1d work next to Smithgall Student Services building]]></image_alt>                    <created>1561039159</created>          <gmt_created>2019-06-20 13:59:19</gmt_created>          <changed>1561039159</changed>          <gmt_changed>2019-06-20 13:59:19</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://studentcenter.gatech.edu/reinnovation]]></url>        <title><![CDATA[Campus Center Project]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="64319"><![CDATA[Administration and Finance]]></group>          <group id="499601"><![CDATA[Campus Services]]></group>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="503491"><![CDATA[Parking and Transportation Services]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>          <keyword tid="68201"><![CDATA[traffic delays]]></keyword>          <keyword tid="166965"><![CDATA[Student Center]]></keyword>          <keyword tid="1400"><![CDATA[Construction]]></keyword>          <keyword tid="178532"><![CDATA[construction-updates]]></keyword>          <keyword tid="181616"><![CDATA[construction  notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="622555">  <title><![CDATA[Stadium Repairs Necessitate Lane Closures along Techwood Drive]]></title>  <uid>27164</uid>  <body><![CDATA[<p><strong>UPDATED July 16, 2019: </strong>The southbound lane of Techwood Drive will be closed between Bobby Dodd Way and North Avenue through the month&nbsp;August.</p><p>*******************</p><p>In order to perform repairs to the upper east portion of Bobby Dodd Stadium, the southbound lane of Techwood Drive between Bobby Dodd and North Avenue will be shut down from 7 am to 4 pm&nbsp;daily, Monday through Friday, through the month of August.&nbsp;&nbsp;The Georgia Tech Police Department will be onsite to facilitate traffic flow.</p><p>Traffic will be detoured along Third Street/Williams Street to North Avenue.&nbsp; Buses/Trollies will still be able to operate routes as scheduled along Techwood Drive. &nbsp;To facilitate this closure flag people will be present.&nbsp; We will be working with Housing to make sure the full road is open during fall move-in.&nbsp;&nbsp;</p><p>For more information, visit the Construction Notices website at <a href="http://facilities.gatech.edu/construction-notices">facilities.gatech.edu/construction-notices</a>.</p>]]></body>  <author>Rachael Pocklington</author>  <status>1</status>  <created>1560804268</created>  <gmt_created>2019-06-17 20:44:28</gmt_created>  <changed>1563292748</changed>  <gmt_changed>2019-07-16 15:59:08</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[The southbound lane of Techwood Drive will be closed between Bobby Dodd Way and North Avenue.]]></teaser>  <type>news</type>  <sentence><![CDATA[The southbound lane of Techwood Drive will be closed between Bobby Dodd Way and North Avenue.]]></sentence>  <summary><![CDATA[<p>Beginning Monday, July 1, the southbound lane of Techwood Drive will be closed between Bobby Dodd Way and North Avenue.</p>]]></summary>  <dateline>2019-06-17T00:00:00-04:00</dateline>  <iso_dateline>2019-06-17T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-06-17 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p><a href="mailto:lindsey.cottingham@facilities.gatech.edu">Lindsey Cottingham</a><br />Facilities Management</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>622924</item>          <item>622829</item>      </media>  <hg_media>          <item>          <nid>622924</nid>          <type>image</type>          <title><![CDATA[Lane closure during Bobby Dodd Stadium upgrade]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[map of lane closure.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/map%20of%20lane%20closure.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/map%20of%20lane%20closure.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/map%2520of%2520lane%2520closure.png?itok=KbHyFBPS]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[map of lane closure during Bobby Dodd stadium upgrade]]></image_alt>                    <created>1562074714</created>          <gmt_created>2019-07-02 13:38:34</gmt_created>          <changed>1562074714</changed>          <gmt_changed>2019-07-02 13:38:34</gmt_changed>      </item>          <item>          <nid>622829</nid>          <type>image</type>          <title><![CDATA[Football Stadium cranes]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Football stadium cranes.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Football%20stadium%20cranes.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Football%20stadium%20cranes.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Football%2520stadium%2520cranes.png?itok=VGDgVEZD]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1561655408</created>          <gmt_created>2019-06-27 17:10:08</gmt_created>          <changed>1561656229</changed>          <gmt_changed>2019-06-27 17:23:49</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="64319"><![CDATA[Administration and Finance]]></group>          <group id="383831"><![CDATA[Facilities Management]]></group>          <group id="1214"><![CDATA[News Room]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>          <keyword tid="181528"><![CDATA[lane closure]]></keyword>          <keyword tid="181529"><![CDATA[stadium repairs]]></keyword>          <keyword tid="178532"><![CDATA[construction-updates]]></keyword>          <keyword tid="174270"><![CDATA[construction facilities management]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>          <topic tid="71871"><![CDATA[Campus and Community]]></topic>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="621850">  <title><![CDATA[GTRI Wall Reconstruction & Sidewalk Replacement State Street May 28th - July 31st]]></title>  <uid>35028</uid>  <body><![CDATA[<p>What: Replacement of failing stone wall with granite veneer, poured concrete wall &amp; replacement of concrete sidewalk with GT standard brick paver/concrete sidewalk and new concrete apron into gravel GTRI lot&nbsp; &nbsp;&nbsp;</p><p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;</p><p>Construction Start Date:&nbsp; Tuesday, May 28, 2019</p><p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;</p><p>Tentative Construction Completion Date:&nbsp; Wednesday, July 31, 2019</p><p>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;</p><p>Impact:&nbsp; &nbsp;&nbsp;</p><p>&middot;&nbsp; &nbsp; &nbsp; &nbsp; Campus in-bound lane on State Street &amp; sidewalk will be closed and fenced to provide equipment work area - entrance to gravel lot will remain open. (May 28th to July 31st)</p><p>&middot;&nbsp; &nbsp; &nbsp; &nbsp; Traffic control devices will be placed to maintain continuous in-bound and out-bound traffic on State Street throughout project duration. (May 28th to July 31st)</p><p>&middot;&nbsp; &nbsp; &nbsp; &nbsp; Select parking spaces in paved lot North of Baker will be required to be blocked during stair demolition. (Timeframe &ndash; TBA)</p><p>&middot;&nbsp; &nbsp; &nbsp; &nbsp; Entrance into GTRI gravel lot will be blocked for installation of new concrete apron.&nbsp; Lot is still accessible from paved lot North of Baker during this time.&nbsp; (Timeframe &ndash; TBA)</p><p>These dates are subject to change depending on weather.&nbsp;&nbsp;</p><p>&nbsp;</p><p>Please do not hesitate to let me know if you have any questions and/or concerns.</p><p>&nbsp;</p><p>&nbsp;</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1558464937</created>  <gmt_created>2019-05-21 18:55:37</gmt_created>  <changed>1558649925</changed>  <gmt_changed>2019-05-23 22:18:45</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[GTRI gravel lot entrance improvements State Street]]></teaser>  <type>news</type>  <sentence><![CDATA[GTRI gravel lot entrance improvements State Street]]></sentence>  <summary><![CDATA[<p>GTRI wall reconstruction &amp; sidewalk replacement at State Street&nbsp;to occur May 28th - July 31st State Street</p>]]></summary>  <dateline>2019-05-21T00:00:00-04:00</dateline>  <iso_dateline>2019-05-21T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-05-21 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[GTRI gravel lot entrance improvements State Street  May 28th - July 31st]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[Jennifer.Disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jennifer Disotell</p><p>Special Projects Manager</p><p>Facilities Design &amp; Construction</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>621952</item>      </media>  <hg_media>          <item>          <nid>621952</nid>          <type>image</type>          <title><![CDATA[GTRI Building Sign]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[GTRI bldg sign.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/GTRI%20bldg%20sign.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/GTRI%20bldg%20sign.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/GTRI%2520bldg%2520sign.png?itok=F-pVWOc4]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[picture of GTRI building sign]]></image_alt>                    <created>1558649888</created>          <gmt_created>2019-05-23 22:18:08</gmt_created>          <changed>1558649888</changed>          <gmt_changed>2019-05-23 22:18:08</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="171998"><![CDATA[construction notices]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="621951">  <title><![CDATA[Campus Center Construction Impacts June 2019]]></title>  <uid>35028</uid>  <body><![CDATA[<p><strong>Campus Center &ndash; Construction Impacts, Schedule &ndash; June 2019:</strong></p><p>The Campus Center project logistics plan is attached.</p><p>General:</p><p>*Construction truck traffic in this sector of campus.</p><p>*Construction Workers along Ferst Dr. near Whitehead Building and bus loop near ISYE &ndash; Please use caution</p><p>*Normal working hours 7:00 AM &ndash; 5:00 PM.</p><p>Visitor Parking:</p><p>*Student Center Parking Deck has been reconfigured for visitors to utilize. &nbsp;This is a credit card only deck.</p><p>Ductbank Crossing at Ferst:</p><p>*Utilities will be installed across Ferst Drive from 6/1/2019 &ndash; 6/21/19.</p><p>*Lane restrictions and/or lane shifts will occur on Ferst Dr, west of Regents Dr. impacting all vehicular traffic from 7:00 AM to 5:00 PM, daily.</p><p>*Alternating sidewalk closures will be required, beginning on the south side of Ferst, then changing to the north side as utility work progressing across Ferst Dr. in this area.</p><p>*Only one sidewalk will be closed at any one time. Pedestrians will be required to cross at the crosswalk to move past this area.</p><p>*Some manhole work and excavation work will occur to the west of the Health Services bldg. in the grassed island along Ferst Dr.</p><p>Phase I Bus Loop Reconfiguration</p><p>*The bus loop located at Ferst Drive adjacent to ISYE Main will be closed from 6/1 &ndash; 6/9/19.</p><p>*No service will be provided during this time.</p><p>*The drive loop and curb will be reshaped to accommodate the turning of emergency vehicles.&nbsp;&nbsp;The bus shelter will be relocated while the bus loop is closed for reconfiguration&nbsp; and will move down the hill in the vicinity of the relay bike station.</p><p>*On 6/10/19, bus service will resume with construction ongoing to reconfigure adjacent sidewalks.</p><p>Phase I Utilities</p><p>*Utilities will be installed in front of Ferst Center for the Arts 6/10/2019 &ndash; 7/28/2019.</p><p>* Fencing will be installed to provide barriers between construction activities.</p><p>*Pedestrian pathways approaching Ferst Center from ISYE lawn will be diverted. Way finding signage will be placed around this part of campus to provide alternate routes.</p><p>*ADA pathways will be maintained from the parking lot in front of Student Services to Ferst Center for the Arts.</p>]]></body>  <author>cbrim3</author>  <status>1</status>  <created>1558647754</created>  <gmt_created>2019-05-23 21:42:34</gmt_created>  <changed>1558648973</changed>  <gmt_changed>2019-05-23 22:02:53</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Construction Activity Notice for June 2019 Campus Center Construction]]></teaser>  <type>news</type>  <sentence><![CDATA[Construction Activity Notice for June 2019 Campus Center Construction]]></sentence>  <summary><![CDATA[<p>Campus Center &ndash; Construction Impacts, Schedule &ndash; June 2019</p><p>&nbsp;</p><p>&nbsp;</p>]]></summary>  <dateline>2019-05-23T00:00:00-04:00</dateline>  <iso_dateline>2019-05-23T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-05-23 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[Campus Center Construction Impacts June 2019]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[nicholas.palfrey@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>621950</item>      </media>  <hg_media>          <item>          <nid>621950</nid>          <type>image</type>          <title><![CDATA[Campus Center June Logistics Map 6/1-6/9]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Campus Center Construction Activity Notice June Logistics Plans (2)-1.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Campus%20Center%20Construction%20Activity%20Notice%20June%20Logistics%20Plans%20%282%29-1.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Campus%20Center%20Construction%20Activity%20Notice%20June%20Logistics%20Plans%20%282%29-1.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Campus%2520Center%2520Construction%2520Activity%2520Notice%2520June%2520Logistics%2520Plans%2520%25282%2529-1.png?itok=Z9-offwg]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1558646842</created>          <gmt_created>2019-05-23 21:27:22</gmt_created>          <changed>1559072756</changed>          <gmt_changed>2019-05-28 19:45:56</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="178532"><![CDATA[construction-updates]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="619087">  <title><![CDATA[Campus Center Construction - May & June ]]></title>  <uid>27705</uid>  <body><![CDATA[<p>&nbsp;</p><p><strong>General:</strong></p><p>*Construction traffic will increase in this sector of campus.</p><p>*Construction Workers are working along Ferst Dr. near Visitor Parking Area 3 &ndash; Please use caution.</p><p>*Normal working hours are 7:00 AM &ndash; 5:00 PM.</p><p><strong>&nbsp;</strong></p><p><strong>Ferst Dr &ndash; Utility Ductbank Crossing [&nbsp;5/6/19 - 5/24/19]&nbsp;</strong></p><p>The Ferst Drive utility crossing will require lane restrictions and shifts, west of Regents Drive, impacting vehiclular traffic from 7am to 5pm, daily. <strong>&nbsp;</strong></p><p>*Lane restrictions and/or lane shifts will occur on Ferst Dr, west of Regents Dr. impacting all vehicular traffic from 7:00 AM to 5:00 PM, daily.</p><p>*Alternating sidewalk closures will be required, beginning on the south side of Ferst, then changing to the north side as utility work progressing across Ferst Dr. in this area.</p><p>*Only one sidewalk will be closed at any one time. Pedestrians will be required to cross at the crosswalk to move past this area.</p><p>*Some access chamber work and excavation work will occur to the west of the Health Services bldg. in the grassed island along Ferst Dr.</p><p>&nbsp;</p><p><strong>Student Center Parking Deck [New Entrance beginning May 8]</strong></p><p>* The parking deck and adjacent surface lots will remain open during this period.</p><p><strong>&nbsp;</strong></p><p><strong>Phase I Construction Mobilization [5/6/19]:</strong></p><p>*Construction teams will begin mobilizing the site for Phase I construction on 5/6/19.</p><p>*Fencing will be installed and sidewalks along Ferst Drive between Student Center parking deck and Student Health center building will be closed for installation of fence post and wire only.&nbsp;</p><p>*Construction teams will be digging (potholing) along the perimeter of Phase I construction to identify and locate underground utilities.&nbsp;</p><p>*Campus directional signage will be placed providing alternate pedestrian routing around construction.</p><p>&nbsp;</p><p><strong>Phase I Ferst Drive Bus Loop Reconfiguration [Closed from 5/17 - 6/9/]</strong></p><p>*No bus service will be provided at this location, during the&nbsp;construction period listed above.&nbsp;</p><p><strong>Phase I Bus Loop Reconfiguration</strong></p><p>*The bus loop located at Ferst Drive adjacent to Visitor Parking Area 3 and ISYE Main will be closed from 5/17 &ndash; 6/9/19.</p><p>*No service will be provided during this time.</p><p>*The drive loop and curb will be reshaped and the fire hydrant moved to allow emergency response vehicles to make the turn onto the new emergency access road.&nbsp; The bus shelter will be relocated.</p>]]></body>  <author>Jessica Rose</author>  <status>1</status>  <created>1552322661</created>  <gmt_created>2019-03-11 16:44:21</gmt_created>  <changed>1558458813</changed>  <gmt_changed>2019-05-21 17:13:33</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Changes to parking deck W02 access and utility locate activities mark the start of the Campus Center transformation.]]></teaser>  <type>news</type>  <sentence><![CDATA[Changes to parking deck W02 access and utility locate activities mark the start of the Campus Center transformation.]]></sentence>  <summary><![CDATA[<p>The Campus Center transformation will be phased throughout 2019, 2020 and 2021. During the month of May, construction will span across Ferst Drive, creating sidewalk closures. Changes to the Student Center Parking Deck will also be underway, but the deck will remain open.&nbsp;&nbsp;</p>]]></summary>  <dateline>2019-05-01T00:00:00-04:00</dateline>  <iso_dateline>2019-05-01T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-05-01 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jd245@gatech.edu ]]></email>  <location></location>  <contact><![CDATA[<p>Jessica Rose, Facilities Communications &amp; Analytics</p><p>John DuConge, Construction Project Manager&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>621426</item>      </media>  <hg_media>          <item>          <nid>621426</nid>          <type>image</type>          <title><![CDATA[Campus Center Project - Phase 1B - May 2019 Map]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Phase 1B workmap.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Phase%201B%20workmap.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Phase%201B%20workmap.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Phase%25201B%2520workmap.jpg?itok=Eb61Ekt7]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[Campus Center Project - Phase 1B - May 2019 Map]]></image_alt>                    <created>1557234610</created>          <gmt_created>2019-05-07 13:10:10</gmt_created>          <changed>1557234610</changed>          <gmt_changed>2019-05-07 13:10:10</gmt_changed>      </item>      </hg_media>  <related>          <link>        <url><![CDATA[https://studentcenter.gatech.edu/reinnovation]]></url>        <title><![CDATA[Student Center Re(in)novation]]></title>      </link>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="174270"><![CDATA[construction facilities management]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="172521"><![CDATA[bicycle lane]]></keyword>          <keyword tid="176331"><![CDATA[Campus Center]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="620245">  <title><![CDATA[Weber Building Re-roof Through July ]]></title>  <uid>27705</uid>  <body><![CDATA[<p>Building #84 Weber I, located at 281 Ferst Drive NW, is getting a new roof, to be completed by mid-July.&nbsp;Construction will require a portion of the service parking lot, located behind Weber &amp; J.S. Coon buildings, to be cordoned off for a&nbsp;boom crane. Construction is expected to last through mid-July.&nbsp;</p><p><strong>Project Impacts:</strong></p><ul><li>Fencing around the perimeter of building and a portion of the service parking lot ,(reserved Visitor Parking for J.S. Coon will be maintained)</li><li>Strategic closing of stairs immediately at the main entrance of the building to funnel pedestrians to safe access at the west&nbsp;end of the building</li><li>Displaced service vehicles relocating temporarily to one side of Cherry Street&nbsp;</li><li>The side exit of the building, leading out to the bus drop/pick-up area will be maintained for egress with overhead protection</li></ul>]]></body>  <author>Jessica Rose</author>  <status>1</status>  <created>1554835413</created>  <gmt_created>2019-04-09 18:43:33</gmt_created>  <changed>1557253964</changed>  <gmt_changed>2019-05-07 18:32:44</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Building #84 Weber I, located near the Historic Hill, is getting a new roof, to be completed by mid-July.]]></teaser>  <type>news</type>  <sentence><![CDATA[Building #84 Weber I, located near the Historic Hill, is getting a new roof, to be completed by mid-July.]]></sentence>  <summary><![CDATA[<p>Building #84 Weber I, located at 281 Ferst Drive NW, is getting a new roof, to be completed by mid-July.&nbsp;Construction will require a portion of the service parking lot, located behind Weber &amp; J.S. Coon buildings, to be cordoned off for a&nbsp;boom crane. Construction is expected to last through mid-July.&nbsp;</p>]]></summary>  <dateline>2019-04-09T00:00:00-04:00</dateline>  <iso_dateline>2019-04-09T00:00:00-04:00</iso_dateline>  <gmt_dateline>2019-04-09 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[jennifer.disotell@facilities.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Jessica Rose, Facilities Communications</p><p>Jennifer Disotell, Construction Manager&nbsp;</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>621448</item>      </media>  <hg_media>          <item>          <nid>621448</nid>          <type>image</type>          <title><![CDATA[Weber Building sign]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[weber bldg sign.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/weber%20bldg%20sign.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/weber%20bldg%20sign.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/weber%2520bldg%2520sign.jpg?itok=49tGm_8u]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1557253917</created>          <gmt_created>2019-05-07 18:31:57</gmt_created>          <changed>1557253917</changed>          <gmt_changed>2019-05-07 18:31:57</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="170033"><![CDATA[Weber]]></keyword>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="608106">  <title><![CDATA[Street Closure at 8th & Fowler]]></title>  <uid>34634</uid>  <body><![CDATA[<p>Drivers should be aware of closures on 8th street between the hours of 6:00 pm&nbsp;to 6:00 am&nbsp;to accomodate the installation of underground piping. &nbsp;</p><p><strong>Start Date:</strong>&nbsp;September 24, 2018</p><p><strong>End Date:</strong>&nbsp;September 27, 2018</p><p>Time: 6:00&nbsp;pm - 6:00 am</p><p><strong>Campus Detours or Disruptions:</strong></p><p>The work will impact McCamish, O&#39;Keefe Building, O&#39;Keefe Gym, Zelnak, Mewborn Field and&nbsp;Manufacturing Research Center.</p>]]></body>  <author>svalkenburgh3</author>  <status>1</status>  <created>1532627075</created>  <gmt_created>2018-07-26 17:44:35</gmt_created>  <changed>1537445886</changed>  <gmt_changed>2018-09-20 12:18:06</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Due to duct bank installations along Fowler Street, 8th and Ferst, 8th Street will experience temporary closures.]]></teaser>  <type>news</type>  <sentence><![CDATA[Due to duct bank installations along Fowler Street, 8th and Ferst, 8th Street will experience temporary closures.]]></sentence>  <summary><![CDATA[<p>Due to duct bank installations along Fowler Street, 8th and Ferst, 8th Street will experience temporary closures.</p>]]></summary>  <dateline>2018-09-13T00:00:00-04:00</dateline>  <iso_dateline>2018-09-13T00:00:00-04:00</iso_dateline>  <gmt_dateline>2018-09-13 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p>Make3 Architecture Planning Design</p><p>Jessica Rose, Communications Officer</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>611712</item>          <item>608107</item>      </media>  <hg_media>          <item>          <nid>611712</nid>          <type>image</type>          <title><![CDATA[8th Lane Closures]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[Fowler Plan.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/Fowler%20Plan.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/Fowler%20Plan.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/Fowler%2520Plan.png?itok=y1F4_RLj]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1537445593</created>          <gmt_created>2018-09-20 12:13:13</gmt_created>          <changed>1537445593</changed>          <gmt_changed>2018-09-20 12:13:13</gmt_changed>      </item>          <item>          <nid>608107</nid>          <type>image</type>          <title><![CDATA[Duct Installation]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[20180-05-22_exterior_views_combined_page_4.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/20180-05-22_exterior_views_combined_page_4.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/20180-05-22_exterior_views_combined_page_4.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/20180-05-22_exterior_views_combined_page_4.jpg?itok=ww85GP6u]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1532627612</created>          <gmt_created>2018-07-26 17:53:32</gmt_created>          <changed>1532627612</changed>          <gmt_changed>2018-07-26 17:53:32</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="609455">  <title><![CDATA[Ferst Drive Lane Closures]]></title>  <uid>34634</uid>  <body><![CDATA[<p>In an effort to upgrade to a new gas service, Atlanta Gas Light will install a new gas line on Ferst Drive in front of the Cherry Emerson Building.The&nbsp;project will require&nbsp;temporary lane closures on Ferst between the U. A. Whitaker Building and Cherry Emerson.</p><p><strong>Date</strong>: Thursday, September 6, 2018 (depending on weather)</p><p><strong>Time: </strong>6:00 PM&nbsp;- 9:00 PM</p><p><strong>Campus Detours or Disruptions:</strong></p><ul><li>Vehicular and bicycle traffic will be impeded; expect an eastbound lane closure between the hours noted above (traffic control will be provided during this period).</li><li>Expect closures on the south sidewalk (directly in front of Cherry Emerson).</li><li>All bus stops will remain accessible.</li><li>There will be no gas outages related to this installation.&nbsp;</li></ul>]]></body>  <author>svalkenburgh3</author>  <status>1</status>  <created>1533747809</created>  <gmt_created>2018-08-08 17:03:29</gmt_created>  <changed>1536065086</changed>  <gmt_changed>2018-09-04 12:44:46</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Installation of a new gas line will require temporary lane closures on Ferst between the U A Whitaker Building and Cherry Emerson.]]></teaser>  <type>news</type>  <sentence><![CDATA[Installation of a new gas line will require temporary lane closures on Ferst between the U A Whitaker Building and Cherry Emerson.]]></sentence>  <summary><![CDATA[<p>In an effort to upgrade a new gas service, Atlanta Gas Light will install a new gas line on Ferst Drive in front of the Cherry Emerson Building. The&nbsp;project will require&nbsp;temporary lane closures on Ferst between the U. A. Whitaker Building and Cherry Emerson.</p>]]></summary>  <dateline>2018-09-04T00:00:00-04:00</dateline>  <iso_dateline>2018-09-04T00:00:00-04:00</iso_dateline>  <gmt_dateline>2018-09-04 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p>Kynthia Gaines, Construction Manager</p><p>Jessica Rose, Communications Officer</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>609461</item>          <item>609460</item>      </media>  <hg_media>          <item>          <nid>609461</nid>          <type>image</type>          <title><![CDATA[Lane Closed]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[lane_closed.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/lane_closed.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/lane_closed.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/lane_closed.jpg?itok=vuZXeTwS]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1533750332</created>          <gmt_created>2018-08-08 17:45:32</gmt_created>          <changed>1533750332</changed>          <gmt_changed>2018-08-08 17:45:32</gmt_changed>      </item>          <item>          <nid>609460</nid>          <type>image</type>          <title><![CDATA[Ferst Street Lane Closure]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[2018_08_06_agl_310_ferst_dr_gas_line_traffic_plan.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/2018_08_06_agl_310_ferst_dr_gas_line_traffic_plan.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/2018_08_06_agl_310_ferst_dr_gas_line_traffic_plan.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/2018_08_06_agl_310_ferst_dr_gas_line_traffic_plan.jpg?itok=-TX5hchg]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1533750275</created>          <gmt_created>2018-08-08 17:44:35</gmt_created>          <changed>1533750275</changed>          <gmt_changed>2018-08-08 17:44:35</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="607725">  <title><![CDATA[New Sod at Russ Chandler Stadium May Impact Travel]]></title>  <uid>34634</uid>  <body><![CDATA[<p>Ga Tech Athletics will begin&nbsp;to re-sod Russ Chandler stadium the week of July 18<sup>th</sup> through the end of September.&nbsp;</p><p>&nbsp;</p><p><strong>Start Date:</strong>&nbsp;May 21, 2018</p><p><strong>End Date:</strong>&nbsp;June 1, 2018</p><p>&nbsp;</p><p><strong>Campus Detours or Interruptions:&nbsp;</strong></p><p>No road closures are anticipated, however increased construction traffic will be expected on Hemphill, Ferst and 5<sup>th</sup> Street.</p><p>On-street parking will be not be available during this period.</p><p>It is possible lanes may be temporarily blocked as trucks back on and off of Ferst. To facilitate these instances a flag person will be provided.</p><p>&nbsp;</p>]]></body>  <author>svalkenburgh3</author>  <status>1</status>  <created>1531427728</created>  <gmt_created>2018-07-12 20:35:28</gmt_created>  <changed>1531429603</changed>  <gmt_changed>2018-07-12 21:06:43</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[Look out for possible delays while Russ Chandler Stadium gets a refresh of new sod]]></teaser>  <type>news</type>  <sentence><![CDATA[Look out for possible delays while Russ Chandler Stadium gets a refresh of new sod]]></sentence>  <summary><![CDATA[<p>Look out for possible delays while Russ Chandler Stadium gets a refresh of new sod.</p>]]></summary>  <dateline>2018-07-12T00:00:00-04:00</dateline>  <iso_dateline>2018-07-12T00:00:00-04:00</iso_dateline>  <gmt_dateline>2018-07-12 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[cmay@athletics.gatech.edu]]></email>  <location></location>  <contact><![CDATA[<p>Chris May, Director of Grounds and Turf Maintenance</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>607727</item>          <item>607730</item>      </media>  <hg_media>          <item>          <nid>607727</nid>          <type>image</type>          <title><![CDATA[Russ Chandler]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[baseball-1496384.jpg]]></image_name>            <image_path><![CDATA[/sites/default/files/images/baseball-1496384.jpg]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/baseball-1496384.jpg]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/baseball-1496384.jpg?itok=Dh7W28TO]]></image_740>            <image_mime>image/jpeg</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1531428255</created>          <gmt_created>2018-07-12 20:44:15</gmt_created>          <changed>1531428255</changed>          <gmt_changed>2018-07-12 20:44:15</gmt_changed>      </item>          <item>          <nid>607730</nid>          <type>image</type>          <title><![CDATA[Russ Chandler Sod Plan]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[RC Field Renovation Map.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/RC%20Field%20Renovation%20Map.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/RC%20Field%20Renovation%20Map.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/RC%2520Field%2520Renovation%2520Map.png?itok=AFPZ4cyF]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1531429480</created>          <gmt_created>2018-07-12 21:04:40</gmt_created>          <changed>1531429480</changed>          <gmt_changed>2018-07-12 21:04:40</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="143241"><![CDATA[Facilities-detour]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node><node id="606362">  <title><![CDATA[McMillan Temporary Sidewalk Closure]]></title>  <uid>34634</uid>  <body><![CDATA[<p>McMillan Street (between Turner Place and 8th Street) will be shut down from May 21 to June 1, 2018 to accommodate tree removal in that area.&nbsp;</p><p><strong>Start Date:</strong> May 21, 2018</p><p><strong>End Date:</strong> June 1, 2018</p><p><strong>Campus Detours or Interruptions:&nbsp;</strong></p><p>On-street parking will be not be available during this period.</p>]]></body>  <author>svalkenburgh3</author>  <status>1</status>  <created>1526996470</created>  <gmt_created>2018-05-22 13:41:10</gmt_created>  <changed>1526997045</changed>  <gmt_changed>2018-05-22 13:50:45</gmt_changed>  <promote>0</promote>  <sticky>0</sticky>  <teaser><![CDATA[McMillan Street (between Turner Place and 8th Street) will be shut down from May 21 to June 1, 2018 to accommodate tree removal in that area. ]]></teaser>  <type>news</type>  <sentence><![CDATA[McMillan Street (between Turner Place and 8th Street) will be shut down from May 21 to June 1, 2018 to accommodate tree removal in that area. ]]></sentence>  <summary><![CDATA[<p>McMillan Street (between Turner Place and 8th Street) will be shut down from May 21 to June 1, 2018 to accommodate tree removal in that area.&nbsp;</p>]]></summary>  <dateline>2018-05-22T00:00:00-04:00</dateline>  <iso_dateline>2018-05-22T00:00:00-04:00</iso_dateline>  <gmt_dateline>2018-05-22 00:00:00</gmt_dateline>  <subtitle>    <![CDATA[]]>  </subtitle>  <sidebar><![CDATA[]]></sidebar>  <email><![CDATA[]]></email>  <location></location>  <contact><![CDATA[<p>Kynthia S Gaines, Project Manager (Design)</p><p>Jessica Rose, Communications Officer</p>]]></contact>  <boilerplate></boilerplate>  <boilerplate_text><![CDATA[]]></boilerplate_text>  <media>          <item>606363</item>      </media>  <hg_media>          <item>          <nid>606363</nid>          <type>image</type>          <title><![CDATA[McMillan Sidewalk Closure]]></title>          <body><![CDATA[]]></body>                      <image_name><![CDATA[sidewalk-closed-at-12th-street.0.379.3264.1560.860.412.png]]></image_name>            <image_path><![CDATA[/sites/default/files/images/sidewalk-closed-at-12th-street.0.379.3264.1560.860.412.png]]></image_path>            <image_full_path><![CDATA[http://hg.gatech.edu//sites/default/files/images/sidewalk-closed-at-12th-street.0.379.3264.1560.860.412.png]]></image_full_path>            <image_740><![CDATA[http://hg.gatech.edu/sites/default/files/styles/740xx_scale/public/sites/default/files/images/sidewalk-closed-at-12th-street.0.379.3264.1560.860.412.png?itok=i_ikFQgY]]></image_740>            <image_mime>image/png</image_mime>            <image_alt><![CDATA[]]></image_alt>                    <created>1526996975</created>          <gmt_created>2018-05-22 13:49:35</gmt_created>          <changed>1526996975</changed>          <gmt_changed>2018-05-22 13:49:35</gmt_changed>      </item>      </hg_media>  <related>      </related>  <files>      </files>  <groups>          <group id="383831"><![CDATA[Facilities Management]]></group>      </groups>  <categories>          <category tid="129"><![CDATA[Institute and Campus]]></category>      </categories>  <news_terms>          <term tid="129"><![CDATA[Institute and Campus]]></term>      </news_terms>  <keywords>          <keyword tid="143221"><![CDATA[Facilities-Notices]]></keyword>          <keyword tid="143241"><![CDATA[Facilities-detour]]></keyword>      </keywords>  <core_research_areas>      </core_research_areas>  <news_room_topics>      </news_room_topics>  <files></files>  <related></related>  <userdata><![CDATA[]]></userdata></node></nodes>