{"499881":{"#nid":"499881","#data":{"type":"news","title":"Atlantic Drive Undergoes Utility Repairs and Hardscape Improvements","body":[{"value":"\u003Cp\u003EAtlantic Promenade South will undergo construction to replace aged steam lines followed by upgrades to adjacent hardscape and landscape. The repairs require significant digging, which provides an opportunity to enhance the pedestrian experience through the primary north\/south corridor of campus on Atlantic Drive. The project will create a connected, walkable corridor envisioned in the campus master plan and landscape master plan. This will provide for a safer campus by providing better lighting, eliminating trip hazards and improving accessibility within the area.\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003ENew steam lines to Bunger Henry and Van Leer buildings\u003C\/li\u003E\r\n\t\u003Cli\u003ENew steam service running up to Atlantic Drive\u003C\/li\u003E\r\n\t\u003Cli\u003EImproved landscape and hardscape\u003C\/li\u003E\r\n\t\u003Cli\u003ENew walkway\u003C\/li\u003E\r\n\t\u003Cli\u003EBetter lighting\u003C\/li\u003E\r\n\t\u003Cli\u003EElimination of trip hazards\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003ECONSTRUCTION DETAILS:\u003C\/strong\u003E\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EStart Date: March 1, 2016\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cblockquote\u003E\r\n\u003Cul\u003E\r\n\t\u003Cli\u003E\u003Cem\u003ENormal working hours: Monday through Friday, 7 a.m. \u0026ndash; 5 p.m. with more disruptive work restricted to after 9 a.m. Weekend work will only be necessary if there are major rain delays.\u003C\/em\u003E\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\u003C\/blockquote\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EAnticipated End Date: December 2016\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003E\u003Cstrong\u003E\u003Cem\u003ECampus Detours or Interruptions:\u003C\/em\u003E\u003C\/strong\u003E\u003Cbr \/\u003E\r\nPedestrian access to Atlantic Drive will be unavailable from the Mason Building Area, all the way to Tech Green. Access to all buildings will remain open. Please follow signage.\u0026nbsp;\u003C\/p\u003E\r\n","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe repairs require significant digging, which provides an opportunity to enhance the pedestrian experience through the primary north\/south corridor of campus on Atlantic Drive.\u0026nbsp;\u003C\/p\u003E\r\n","format":"limited_html"}],"field_summary_sentence":[{"value":"Atlantic Promenade South will undergo construction to replace aged steam lines and upgrade adjacent hardscape and landscape."}],"uid":"27705","created_gmt":"2016-02-12 15:36:15","changed_gmt":"2016-10-08 03:20:42","author":"Jessica Rose","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2016-02-15T00:00:00-05:00","iso_date":"2016-02-15T00:00:00-05:00","tz":"America\/New_York"},"extras":[],"hg_media":{"504011":{"id":"504011","type":"image","title":"Atlantic Drive Corridor: Future State","body":null,"created":"1456167600","gmt_created":"2016-02-22 19:00:00","changed":"1475895263","gmt_changed":"2016-10-08 02:54:23","alt":"Atlantic Drive Corridor: Future State","file":{"fid":"205910","name":"birds_eye_view_atlantic_drive.jpg","image_path":"\/sites\/default\/files\/images\/birds_eye_view_atlantic_drive_0.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/birds_eye_view_atlantic_drive_0.jpg","mime":"image\/jpeg","size":353833,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/birds_eye_view_atlantic_drive_0.jpg?itok=EIj088uJ"}},"582125":{"id":"582125","type":"image","title":"Atlantic Drive Construction Map 2","body":null,"created":"1475676620","gmt_created":"2016-10-05 14:10:20","changed":"1475676620","gmt_changed":"2016-10-05 14:10:20","alt":"","file":{"fid":"221898","name":"AtlanticPromenade-2.jpg","image_path":"\/sites\/default\/files\/images\/AtlanticPromenade-2.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/AtlanticPromenade-2.jpg","mime":"image\/jpeg","size":3870493,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/AtlanticPromenade-2.jpg?itok=2f2urqbv"}}},"media_ids":["504011","582125"],"related_links":[{"url":"http:\/\/facilities.gatech.edu\/detours-notices","title":"Facilities Management: Detours and Notices"}],"groups":[{"id":"64319","name":"Administration and Finance"}],"categories":[{"id":"129","name":"Institute and Campus"},{"id":"42901","name":"Community"}],"keywords":[{"id":"143251","name":"detour"},{"id":"35921","name":"Facilities Management"},{"id":"143241","name":"Facilities-detour"},{"id":"143221","name":"Facilities-Notices"},{"id":"659","name":"Georgia Tech Library"},{"id":"171539","name":"streetscapes"},{"id":"83491","name":"utilities"}],"core_research_areas":[],"news_room_topics":[{"id":"71871","name":"Campus and Community"}],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003E\u003Ca href=\u0022mailto:JRose@gatech.edu\u0022\u003EJessica Rose\u003C\/a\u003E\u003Cbr \/\u003E\r\nCommunications Officer\u003Cbr \/\u003E\r\nFacilities Management\u003Cbr \/\u003E\r\n404-385-1822\u003C\/p\u003E\r\n\r\n\u003Cp\u003ECONSTRUCTION PROJECT MANAGER: Gerald Shumake\u003C\/p\u003E\r\n","format":"limited_html"}],"email":[],"slides":[],"orientation":[],"userdata":""}}}