{"231061":{"#nid":"231061","#data":{"type":"news","title":"Rain Delays Roe E. Stamps Turf Field Renovation","body":[{"value":"\u003Cp\u003EThe Roe E. Stamps Turf Field Renovation project is behind schedule due to rain. This summer (May - July) we\u0027ve had 2.5 times more rain (a total of 23.5\u0022) than we\u0027ve had in the past two years! These large amounts of rainfall have slowed down the installation of the water retention system and turf field replacement project. Our construction team is working hard to complete the project as quickly as possible but it is our plan to re-open the turf fields by Spring Semester 2014.\u0026nbsp; For project updates and photos please visit the \u003Ca href=\u0022http:\/\/www.crc.gatech.edu\/plugins\/content\/index.php?id=543\u0022 target=\u0022_blank\u0022\u003ECRC website.\u003C\/a\u003E\u003Cbr \/\u003E\u003Cbr \/\u003EThis semester, Fall Intramurals will look a little different. Without the Turf Fields available for fall sports, we\u0027ve moved many of our spring sports to fall and fall to spring. This way, students will get all of the same sports in an academic calendar that they would normally get. Only two sports are currently not offered this year: softball and 4x4 flag football. We are looking for other options to be able to offer these sports.\u0026nbsp; \u003Ca href=\u0022http:\/\/www.crc.gatech.edu\/intramurals\/\u0022 target=\u0022_blank\u0022\u003EClick here for more information on Intramurals\u003C\/a\u003E.\u003C\/p\u003E","summary":null,"format":"limited_html"}],"field_subtitle":"","field_summary":[{"value":"\u003Cp\u003EThe Roe E. Stamps Turf Field Renovation project is behind schedule due to rain. This summer (May - July) we\u0027ve had 2.5 times more rain (a total of 23.5\u0022) than we\u0027ve had in the past two years! These large amounts of rainfall have slowed down the installation of the water retention system and turf field replacement project. Our construction team is working hard to complete the project as quickly as possible but it is our plan to re-open the turf fields by Spring Semester 2014.\u003C\/p\u003E","format":"limited_html"}],"field_summary_sentence":"","uid":"27164","created_gmt":"2013-08-22 11:10:17","changed_gmt":"2016-10-08 03:14:46","author":"Rachael Pocklington","boilerplate_text":"","field_publication":"","field_article_url":"","dateline":{"date":"2013-08-22T00:00:00-04:00","iso_date":"2013-08-22T00:00:00-04:00","tz":"America\/New_York"},"extras":[],"hg_media":{"231081":{"id":"231081","type":"image","title":"Roe E. Stamps Field Under Construction Summer 2013","body":null,"created":"1449243602","gmt_created":"2015-12-04 15:40:02","changed":"1475894903","gmt_changed":"2016-10-08 02:48:23","alt":"Roe E. Stamps Field Under Construction Summer 2013","file":{"fid":"197544","name":"stamps_field_under_construction_summer_2013.jpg","image_path":"\/sites\/default\/files\/images\/stamps_field_under_construction_summer_2013_0.jpg","image_full_path":"http:\/\/hg.gatech.edu\/\/sites\/default\/files\/images\/stamps_field_under_construction_summer_2013_0.jpg","mime":"image\/jpeg","size":116071,"path_740":"http:\/\/hg.gatech.edu\/sites\/default\/files\/styles\/740xx_scale\/public\/images\/stamps_field_under_construction_summer_2013_0.jpg?itok=6bDX-5WW"}}},"media_ids":["231081"],"related_links":[{"url":"http:\/\/www.crc.gatech.edu\/","title":"Campus Recreation Center"}],"groups":[{"id":"1269","name":"Student Life"}],"categories":[],"keywords":[],"core_research_areas":[],"news_room_topics":[],"event_categories":[],"invited_audience":[],"affiliations":[],"classification":[],"areas_of_expertise":[],"news_and_recent_appearances":[],"phone":[],"contact":[{"value":"\u003Cp\u003ESara Warner\u003Cbr \/\u003EAssistant Director, Campus Recreation\u003Cbr \/\u003E\u003Ca href=\u0022mailto:sara.warner@crc.gatech.edu\u0022\u003Esara.warner@crc.gatech.edu\u003C\/a\u003E\u003C\/p\u003E","format":"limited_html"}],"email":["studentaffairs@vpss.gatech.edu"],"slides":[],"orientation":[],"userdata":""}}}